| Date |
Text |
| 2007-04-27 10:06:23 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | 561-805-6724 [email protected] |
| | |
| | FBCFLORIDA BUILDING CODE 2004 |
| | FBC EBFLORIDA BUILDING CODE 2004 |
| | EXISTING BUILDING CODE |
| | FBC*CITY OF WEST PALM BEACH |
| | AMENDMENTS TO THE FBC2004 |
| | |
| | 1.)THE PLANS SPECIFY JOHNS MANVILLE FOR THE FLAT |
| | DECK.CHANGING THE PRODUCT REQUIRES A REVISION TO THE |
| | BUILDING PERMIT AS THE DESIGNER OF RECORD HAS SPECIFIED |
| | THE PRODUCT IN THE PLAN. |
| | |
| | 2.)IF YOU ARE USING THE GAF AS PROPOSED WITH THIS |
| | PERMIT, INDICATE WHICH BASE SHEET FASTENER YOU ARE |
| | USING AS THE DIFFERENT OPTIONS HAVE DIFFERENT DESIGN |
| | PRESSURE LIMITATIONS. |
| | |
| | 2ND REVIEW - THIS CAN BE DONE ONLY AFTER THE ARCHITECT |
| | HAS REVISED SHEET A102. |
| | |
| | 3.)THE ROOFING CONTRACTOR HAS SELECTED AN ASSEMBLY |
| | WHICH IS DIFFERENT FROM THE ASSEMBLY CHOSEN AT THE TIME |
| | OF PERMIT ISSUANCE FOR THE MASTER PERMIT, METAL ROOF. |
| | THE ASSEMBLY THE ROOF CONTRACTOR HAS SELECTED HAS A |
| | DESIGN PRESSURE LIMITATION OF -27.5, NOT COMPLIANT FOR |
| | ZONE 1 (REQUIRES -32.3). |
| | |
| | 2ND REVIEW - THE CORRECT ASSEMBLY HAS BEEN INCLUDED. |
| | HOWEVER, SEE NEW COMMENT REGARDING ENGINEER'S |
| | PRESSURES. |
| | |
| | 4.)ZONES 2 AND 3 REQUIRE -68.1 AS PER PLAN.SEE |
| | LIMITATION #1, PAGE 8.CALCULATIONS PREPARED BY AN |
| | ARCHITECT, ENGINEER OR REGISTERED ROOF CONSULTANT |
| | REQUIRED. |
| | |
| | 2ND REVIEW - NOT ADDRESSED. |
| | |
| | 5.)ADDRESSED. |
| | |