| 2007-09-25 10:46:41 | *****DENIED***** |
| | |
| | * THE FOLLOWING COMMENTS TAKEN FROM THE PREVIOUS FIRE |
| | PLAN REVIEW STILL NEED TO BE ADDRESSED: |
| | |
| | 4.THE DEMOLITION AND/OR THE STOCKING OF NEW BUILDING |
| | MATERIALS & SUPPLIES SHALL NOT INTERFERE WITH EMERGENCY |
| | RESPONSE ACCESS TO THE PROPERTY OR THE VICINITY THEREOF |
| | (INCLUDING STREETS, ALLEYS, FIRE LANES).AMEND |
| | SPELLING TO READ FIRE LANES, NOT FINE LINES AS |
| | INDICATED ON SHEET 2.1 |
| | |
| | 5.PLEASE DECLARE THE OCCUPANCY CLASSIFICATION FOR |
| | THIS/THESE STRUCTURE(S).NOT SHOWN IN THE PROJECT DATA |
| | ON SHEET 2.1 |
| | |
| | 7.SPECIFY THE INTERIOR WALL AND CEILING FINISH |
| | MATERIAL AS CLASS A, CLASS B, OR CLASS C FOR EXITS, |
| | EXIT ACCESS CORRIDORS, AND ALL OTHER AREAS.PLEASE |
| | ADDRESS ON THE APPROPIATE PLAN SHEET |
| | |
| | * NEW COMMENTS |
| | |
| | A.DECLARE WHAT IS TO BE STORED IN THE NEW STORAGE |
| | STRUCTURE AND ITS HAZARD CONTENTS IN TERMS OF LOW, |
| | MODERATE, OR HIGH. |
| | |
| | B.NO EMERGENCY LIGHTS NOTED IN THE NEW STORAGE |
| | STRUCTURE.PLEASE EXPLAIN OR AMEND. |
| | |
| | C.PROVIDE A LAYOUT OF THE SPRINKLER SYSTEM FOR |
| | STRUCTURE.PLEASE BE ADVISED THAT SEPARATE PLANS AND |
| | PERMIT WILL BE REQUIRED FOR SPRINKLER INSTALLATION |
| | AND/OR REMODEL. |
| | |
| | D. DOES THE STRUCTURE HAVE OR WILL HAVE A FIRE ALARM |
| | SYSTEM.IF SO, PROVIDE A LAYOUT OF THE FIRE ALARM |
| | SYSTEM.PLEASE BE ADVISED THAT SEPARATE PLANS AND |
| | PERMIT WILL BE REQUIRED FOR ITS INSTALLATION AND/OR |
| | REMODEL. |
| | |
| | |
| | |
| | TO EXPEDITE THE PLAN REVIEW PROCESS, INCLUDE A RESPONSE |
| | LETTER INDICATING HOW/WHERE EACH COMMENT WAS ADDRESSED |
| | |
| | |
| | CAPT. MICHAEL A. WILLIAMS |
| | FIRE PLAN REVIEW |
| | 561-805-6722 |