| Plan Review Notes For Permit 07030949 |
| Permit Number |
07030949 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2007-05-02 11:37:28 | *** DENIED *** | | | 1) ENERGY CALCULATIONS NEED TO BE SIGNED BY OWNER/AGENT | | | ALSO, PER 2004 FBC 13-400.3.ABC.2. | | | | | | 2) SEE PLANS PAGE M-0.1 MECHANICAL NOTES #3, NEED TO | | | STATE 2004 FBC & MECHANICAL (NOT LATEST EDITION), | | | PLEASE CORRECT. | | | | | | 3) SEE PAGE M-0.1 SLAB HUNG A/H UNIT DETAIL, PRIMARY | | | CONDENSATE DRAIN LINE AND AUXILIARY DRAIN LINE ARE TIED | | | INTO THE SAME LINE, NOT PERMITTED, SEE 2004 FBC M 307. | | | ALSO THE DETAIL SHOWS A CHECK VALVE IN THE DRAIN LINE, | | | AS THIS LINE IS NOT UNDER PRESSURE THE VALVE WOULD BE A | | | BLOCKAGE, PLEASE CORRECT. | | | | | | 4) PLEASE SHOW ON PLANS PAGE M-1.1, THE CONDENSATE | | | DRAIN LINES AND WERE THEY WILL TERMINATE. | | | | | | 5) SEE PAGE M-1.1 KEY NOTE #8 89"X28" LOUVER, PLEASE | | | STATE IF THE LOUVER IS OPEN TO THE OFFICE SPACES, OPEN | | | PLENUM SPACE, OR ABOVE PLATFORM DECK. | | | | | | 6) THE OPEN RETURN AIR PLENUM WILL NEED TO BE | | | INSULATED, SEE 2004 FBC 13-410.1.ABC.2.2, PLEASE | | | CORRECT. | | | | | | 7) PLEASE ADD NOTE TO MECHANICAL PLANS, NO COMBUSTIBLE | | | MATERIALS PERMITTED IN PLENUM, PER 2004 FBC/M 602.2.1. | | | | | | MECHANICAL PLAN REVIEW BY; | | | TOM GORDON (561) 805-6729. |
|