| Date |
Text |
| 2007-09-21 11:11:08 | ***FAILED**** PLEASE PROVIDE THE FOLLOWING: |
| | |
| | 1.YOUR SFWMD ENVIRONMENTAL RESOURCE PERMIT |
| | MODIFICATION NO. 50-03926-PWAS ISSUED IN SEPT 10, |
| | 1998.ON FRONT PAGE, IN PERIOD DURATION IT SAYS THAT |
| | MAXIMUM TIME LIMIT IS 5 YEARS FROM ISSUE.THIS YEAR |
| | ISSEPT2007. THIS IS EXPIRED PERMIT. |
| | |
| | 2. PLEASE SHOW IN YOUR WATER QUALITY CALS WHAT CRITERIA |
| | DID YOU USE SPECIFICALLY 1" OVER ENTIRE SITE OR2.5" % |
| | OF IMPERVIOUS AREA CRITERIA??YOUR CALCULATION DO NOT |
| | SHOW THESE CRITERIA.PLEASE SHOW ON DRAWINGTHIS SITE |
| | AREA, YOU ARE DEVELOPING FORTHIS PROJECT . |
| | PLEASE ALSO SHOW TOTAL PERVIOUS,& IMPERVIOUS AREA FOR |
| | THIS PROJECT, LAKE, GREEN, SIDEWALK, PARKING, BUILDING |
| | AREA ETC. MAKE SURE THESE AREAS SHOWN ON DRAWINGS MUST |
| | MATCH WITH AND USED IN STORM WATER QUALITY |
| | CALCULATIONS. |
| | |
| | 3. PLEASE SHOW IN YOUR CALS, HOW DID YOU DETERMINE THE |
| | FIRST FLOOR ELEVATION?MAKE SURE YOU MEETYOUR FLOOD |
| | ZONE AREA, & 5,10, 25, 100 YEAR FLOOD CRITERIATO |
| | DETERMINE THE FIRST FLOOR ELEVATION, CENTER LINE OF THE |
| | ROAD(CROWN OF THE ROAD),PLEASE SHOWALL OF THESE IN |
| | YOUR WATER QUALITY CALCULATIONS. |
| | |
| | 4. PLEASE SHOW DETAIL OF THE CONTROL STRUCTURESWITH |
| | ELEVATIONS, NOTCHES, BLEEDING ELEVATION, ETC ON |
| | DRAWINGS, CALCULATION FOR EXFILTRATION TRENCHES, PLEASE |
| | SHOW DRY DETENTION/WET DETENTION SITE AREAS IN STORM |
| | WATER CALS. |
| | |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |