| Plan Review Notes For Permit 07030592 |
| Permit Number |
07030592 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2007-08-02 08:32:02 | PROVISO; | | | THE GAS PLAN, PAGE P3.10 MUST BE REVISED WITHIN 30 DAYS | | | THE FOLLOWING INFORMATION NEEDS TO BE CHANGED ARE ADDED | | | TO PLAN; | | | A) DEVELOPED LENGHT FROM TANK TO | | | GENERATOR. | | | B) PIPE SIZE, WELDED OR SCREW PIPE. | | | C) SUBMIT REGUATOR SPEC SHEETS. (MOST LP | | | SYSTEMS HAVE A FIRST AND SECOND STAGE REGULATOR) | | | D) SLEAVE PIPE THRU WALL. | | | E) DETAIL REQUIRED FOR TANK PAD AND TIE | | | DOWN. | | | F) SHUT OFF VALVES REQUIRED DOWN STREAM OF | | | REGULATORS AND UNIONS. ( SHOW ON RISER DIAGRAM) | | | G) IF TANK REQUIRES PROTECTION FROM DAMAGE | | | SHOW AND SPEC. ON DRAWINGS. |
|