2007-03-24 19:46:37** PLANS WERE REMOVED FROM ZONING AND ARE BEING
 RETURNED TO ZONING.
2007-03-24 19:39:50 
  
 ****** UNSAT *****
  
 ** PLEASE KNOW THAT ANY REFERENCE TO THE FBC CHAPTER 1
 IN THE PLAN REVIEW COMMENTS CAN BE FOUND IN THE
 ADMINISTRATIVE SECTION OF THE 2004 FBC AS ADOPTED BY
 THE CITY OF WEST PALM BEACH.
  
 ** PLEASE SEE THAT THERE COMMENTS MADE TO SHEETS OTHER
 THAN ELECTRICAL BY THIS REVIEW. THESE COMMENTS ARE
 REQUIRED WHETHER OR NOT COMMENT IS MADE BY ANY OTHER
 TRADE.
  
 ** IMPORTANT**
 ONLY ONE SET OF PLANS WILL BE RETURNED.
 DUE TO MANY OF THE COMMENTS BELOWAND THE TYPE OF
 COMMENTS, ONE COMPLETE SET OF PLANS ARE BEING RETAINED
 BY THIS OFFICE.
  
 1) NOTE: PLEASE SEE FAC 61G17 AND FS 472.025 AS THE
 SURVEY SHEETS ARE REQUIRED TO CONTAIN AN ORIGINAL
 SIGNATURE AND DATE. SHEET CONTAINS A RAISED SEAL OVER A
 PHOTO-COPIED SIGNATURE WHICH IS NOT PERMITTED.
 STATEMENT ON TITLE BLOCK MENTIONS NOT VALID WITHOUT
 SIGNATURE.
  
 2) NOTE: PLEASE SEE THE SHEETS FROM BUTLER
 MANUFACTURING COMPANY DO NOT CONTAIN ANY TITLE BLOCK
 FOR THE ENGINEER.
 PLEASE SEE FAC 61G15-23.002.
 PLEASE ALSO KNOW IF THE ENGINEER IS EMPLOYED BY THE
 SAID COMPANY AND COMPANY IS OFFERING ENGINEERING
 SERVICES, THEN A CERTIFICATE OF AUTHORIZATION NUMBER IS
 REQUIRED FOR SAID FIRM.
 PLEASE SEE FS 471.023.
 PLEASE SEE THE SHEETS DO NOT CONTAIN ORIGINAL
 SIGNATURES ARE REQUIRED PER FS 471.025 AND FAC
 61G15-23.002. THESE CONTAIN A RAISED SEAL OVER A
 PHOTO-COPIED SIGNATURE IN BOTH SETS.
 **THIS IS REQUIRED WHETHER OR NOT COMMENT IS MADE BY
 OTHER TRADES.
  
 3) NOTE: PLEASE SEE THE FIRM ARCHITECTURAL ALLIANCE IS
 MISSING INFORMATION ON TITLE BLOCKS AS REQUIRED PER FAC
 61G1-16.004. PLEASE SEE MISSING FIRM LICENSE NUMBER,
 ALSO KNOWN AS THE CERTIFICATE OF AUTHORIZATION NUMBER.
  
 PLEASE SEE FLORIDA STATUTES 481.219 WHICH REQUIRES
 THIS.
 ** REQUIRED FOR ALL SHEETS WHICH CONTAIN TITLE BLOCKS
 FOR FIRM. C, CS,, LANDSCAPE AND A SHEETS ETC.
  
 4) NOTE: PLEASE SEE THE FIRE SPRINKLER SHEETS.
 A) PLEASE SEE THE SEAL WHICH IS BEING USED BY THE
 ENGINEER IS NO LONGER VALID. PLEASE SEE RULE
 61G15-23.001 WHICH WAS CHANGED IN FEB 04 WHICH REQUIRED
 ALL ENGINEERS TO OBTAIN A NEW SEAL WITH THE WORDING
 *LICENSE* INSTEAD OF*CERTIFICATE*. THIS RULE WAS
 EXTENDED TO DECEMBER 31ST, 2005. ALL SEALS AFTER THAT
 DATE MUST CONTAIN THE NEW WORDING.
 B) PLEASE SEE THE MISSING CERTIFICATE OF AUTHORIZATION
 NUMBER FOR COMPANY.
 C) PLEASE SEE THE SEAL ITSELF IS NO SIZED AS REQUIRED
 PER FAC 61G15-23.001. THE SEAL SHALL BE A MINIMUM OF
 2INCHES.
  
 5) NOTE: PLEASE SEE THE SHEETS SIGNED BY KAMM
 CONSULTING SHALL BEAR THE SIGNATURES AS RECOGNIZED AND
 AS ON FILE WITH THIS OFFICE.
 FS 471.025.
  
 6) NOTE: PLEASE SEE FS 481.221 AND 471.025 FOR
 ARCHITECTS AND ENGINEERS.
  
 7) NOTE: PLEASE SEE THAT PLANS HAVE BEEN SUBMITTED FOR
 PERMIT AFTER DECEMBER 8TH, 2006 WHICH PLACES PROJECT
 UNDER THE NEW CODES.
 PLEASE SEE THE FOLLOWING SHALL BE STATED ON THE
 ARCHITECTURAL CS COVER SHEET. PLEASE ALSO BE SURE THE
 TRADES REFLECT THE CODES RELEVANT TO THEIR DESIGNS ON
 RESPECTIVE SHEETS.
 2004 FBC W/ 2006 REVISIONS (ALL TRADES).
 2005 NFPA-70
 2003 NFPA-101
 2002 NFPA-72
 2003 NFPA-20
  
 ** PLEASE SEE POSSIBLE COMMENTS FROM OTHER TRADES WITH
 RESPECT TO OTHER CODES REQUIRED ON PLANS.
  
 8) NOTE: PLEASE SUBMIT ALL MANUFACTURES SPECS/CUT
 SHEETS FOR THE FIRE PUMP. PLEASE SEE NFPA-20 2003.
 110.3, 90.7. CHAPTER 11 AND 12 OF NFPA-20
 FBC 106.1.2
 PLEASE SEE MINIMUM TIME, FUEL CONSUMPTION IS TO BE
 STATED ON PLANS. THIS MAY ALSO BE IN FIRE REVIEWS
 COMMENTS.
 AS SHOWN DIESEL DRIVEN AND THE AMOUNT OF FUEL REQUIRED
 WHICH EQUALS 1GAL PER HP PER HOUR PLUS 5% FOR SUMP AND
 5% FOR EXPANSION. PLEASE SEE THE FOLLOWING THE CODE.
 11.4.3.1 FUEL SUPPLY TANK(S) SHALL HAVE A CAPACITY AT
 LEAST EQUAL TO 5.07 L PER KW (1 GAL PER HP), PLUS 5
 PERCENT VOLUME FOR EXPANSION AND 5 PERCENT VOLUME FOR
 SUMP AND THE COMMENTARY SECTION AS FOLLOWS.
  
 9) NOTE: ** PLANS INDICATE WIND LOADS FOR LIGHT POLES
 AT 120MPH?
 PLEASE ALSO SEE SETS CONTAIN A SHEET WITH NO NUMERICAL
 DESIGNATION WHICH APPEARS TO BE THE SAME AS SHEET E1.1?
 PLEASE VERIFY AND REMOVE AS NEEDED.
 * PLEASE PROVIDE ALL MINIMUM WIND LOADING FOR SITE
 LIGHTING LIGHT POLES, AND THAT OF THE POLES ON GARAGE
 ROOF STRUCTURE. PLEASE KNOW A DETAIL ON HOW THESE WILL
 BE ATTACHED ON PARKING DECK OF THE GARAGE AND POLE
 DETAIL FOR GROUND MOUNTED/BURIED POLES WILL BE
 REQUIRED. PLEASE KNOW ALL SHOW MEET THE FBC 140MPH
 (3SEC GUST) 120MPH SUSTAINED.
  
 THE STRUCTURAL CALCULATIONS WILL BE REVIEWED BY THE
 BUILDING PLAN REVIEWER.
 FBC 106.1.2 ADMIN SECT.
  
 10) NOTE: PLEASE SEE THE PLANS INDICATE A NEW SERVICE
 FOR THIS SECTION OF BUILDING WHICH IS BEING FROM THE
 FIRE PUMP AND HAS ELECTRICAL CROSSED OVER TO THE OTHER
 EXISTING BUILDING AREA??
 PLEASE SEE THAT A NEW SERVICE IS NOT BEING GRANTED AT
 THIS TIME AS THIS IS NOT BEING CONSIDERED A SEPARATE
 BUILDING. ELECTRICAL SYSTEMS CROSS, FIRE PUMP IS IN
 ANOTHER SECTION OF THE STRUCTURE, SEPARATION AS
 REQUIRED PER THE FBC TO CONSIDER THIS A SEPARATE
 BUILDING IS NOT MET.
 FBC DEFINITIONS.
 NEC 230.2.
 PLEASE REVISE PLANS AND SHOW HOW AND WHERE THE POWER
 WILL BE COMING FROM IN THE EXISTING BUILDING. REVISE
 THE RISER DIAGRAM FOR NEW FEEDS FROM THE EXISTING
 SERVICE OR SERVICE BEING UPGRADED.
 PLEASE SUBMIT LOAD CALCULATIONS FOR THE NEW LOADS ON
 EXISTING SERVICE.
 PLEASE SEE COMMENTS FROM THE FIRE MARSHAL ALSO. 230.2,
 230.70, 230.72, 220.
 FBC 106.3.5.1.2
  
 11) NOTE: PLEASE SEE THE NEW FOOTER STEEL AND
 STRUCTURAL STEEL IS REQUIRED TO BE PART OF THE
 GROUNDING ELECTRODE SYSTEM OF EXISTING OR UPDATED
 EXISTING SERVICE.
 250.50.
  
 12) NOTE: PLEASE SEE 250.104 AS THE FIRE SPRINKLER LINE
 SHALL BE PART OF THE GE SYSTEM.
  
 13) NOTE: PLEASE SEE THE 2004 FBC W/ 2006 REVISIONS FOR
 CHAPTER 13. AT THIS TIME THERE ARE SEVERAL ITEMS
 MISSING FOR REVIEW.
 PLEASE SEE NO SCHEDULING OF SYSTEM WAS SUBMITTED.
 PLEASE SEE NO INFORMATION ON A SYSTEM WAS SUBMITTED.
 PLEASE SEE NO OVER RIDE DEVICES AT THE POINTS OF
 EGRESS/INGRESS INTO SPACE FROM ENTRANCE WIN WHICH THE
 OCCUPANT CAN SEE THE LIGHTING WHICH IS BEING
 CONTROLLED.
 PLEASE SEE NO TIMES ON ANY OVER RIDE DEVICES AND TYPES
 OF DEVICES.
 PLEASE SEE MISSING ENERGY CALCULATIONS.
 PLEASE SEE MISSING LIGHTING PERFORMANCE CALCULATIONS.
 PLEASE SEE MISSING CERTIFICATIONS PER DESIGNER(S) OF
 RECORD.
 PLEASE SEE MISSING VOLTAGE DROP CALCULATIONS FOR
 LONGEST RUNS.
 PLEASE SEE 13-103.1, 13-415.1ABC.1, 13-415.1.ABC.1.1,
 .1.2 AND .1.3, 13-415.1.AB.1.1, 13-415.1..A, .B AND .C,
 13-415.2 AND TABLES UNDER THE NEW 2006 REVISIONS. ETC.
  
 14) NOTE: PLEASE SEE MISSING EGRESS LIGHTING
 PHOTO-METRICS FOR EGRESS PATHS TO THE PUBLIC RIGHT OF
 WAY, INCLUDING OUTSIDE STAIRS AND INTERIOR STAIRS.
 PLEASE SEE NFPA-101 7.8, 7.9. 7.8.1.3, 7.9.2.2
  
 15) NOTE: PLEASE COMPLETE CIRCUITING ON PLANS. PLEASE
 SEE 700.12E FOR CIRCUITING OF EMERGENCY LIGHTING AND
 EXIT LIGHTING. EXCEPTIONS ARE PERMITTED HOWEVER AT THIS
 TIME NOT ENOUGH INFORMATION IS PROVIDED FOR THE
 LIGHTING.
 PLEASE SUBMIT THE MANUFACTURES SPECS/CUT SHEETS ON THE
 PROPOSED UPSE.
 110.3, 90.7
 FBC 106.1.2
  
 16) NOTE: PLEASE BE SURE ALL EQUIPMENT CONTAINS THE AIC
 RATINGS AS REQUIRED PER 110.9.
  
 17) NOTE: PLEASE SHOW ALL CONTINUOUS LOADS AT 125%.
 215.3, 230.42
  
 18) NOTE: PLEASE PROVIDE LAYOUT OF THE FIRE PUMP ROOM
 FOR LIGHTING AS REQUIRED PER 700.16, 700.12E, NFPA-101
 7.8, 7.9, NFPA-20 5.12.3, 5.12.4.
  
 19) NOTE: PLEASE PROVIDE MORE INFORMATION FOR THE FIRE
 PUMP ROOM AS REQUIRED PER NFPA-20 CHAPTER 5. 5.12.5 FOR
 VENTILATION.
 5.12.6* DRAINAGE.
 5.12.6.1 FLOORS SHALL BE PITCHED FOR ADEQUATE DRAINAGE
 OF ESCAPING WATER AWAY FROM CRITICAL EQUIPMENT SUCH AS
 THE PUMP, DRIVER, CONTROLLER, AND SO FORTH.
 11.3.1 PUMP ROOM DRAINAGE. THE FLOOR OR SURFACE AROUND
 THE PUMP AND ENGINE SHALL BE PITCHED FOR ADEQUATE
 DRAINAGE OF ESCAPING WATER AWAY FROM CRITICAL
 EQUIPMENT, SUCH AS PUMP, ENGINE, CONTROLLER, FUEL TANK,
 AND SO FORTH.
 11.3.2* VENTILATION.
 11.3.2.1 VENTILATION SHALL BE PROVIDED FOR THE
 FOLLOWING FUNCTIONS:
 (1)TO CONTROL THE MAXIMUM TEMPERATURE TO 49?C
 (120?F) AT THE COMBUSTION AIR CLEANER INLET WITH ENGINE
 RUNNING AT RATED LOAD
 (2)TO SUPPLY AIR FOR ENGINE COMBUSTION
 (3)TO REMOVE ANY HAZARDOUS VAPORS
 (4)TO SUPPLY AND EXHAUST AIR AS NECESSARY FOR
 RADIATOR COOLING OF THE ENGINE WHEN REQUIRED
  
 11.3.2.2 THE VENTILATION SYSTEM COMPONENTS SHALL BE
 COORDINATED WITH THE ENGINE OPERATION.
 11.3.2.3* AIR SUPPLY VENTILATOR.
 11.3.2.3.1 THE AIR SUPPLY VENTILATOR SHALL BE
 CONSIDERED TO INCLUDE ANYTHING IN THE AIR SUPPLY PATH
 TO THE ROOM.
 11.3.2.3.2 THE TOTAL AIR SUPPLY PATH TO THE PUMP ROOM
 SHALL NOT RESTRICT THE FLOW OF THE AIR MORE THAN 5.1 MM
 WATER COLUMN (0.2 IN. WATER COLUMN).
 ETC.
 FBC 106.1.2, 106.3.5.1.2
  
 * ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE
 PICKED UP FOR CORRECTIONS, PLEASE BE
 SURE TO COMPLETELY REMOVE ALL OLD/VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING. DO NOT LEAVE ANY
 OLD/VOIDED SHEETS IN SETS.
 PLEASE KNOW ONLY ONE SET OF THE
 OLD/VOIDED SHEETS SHOULD BE SUBMITTED
 FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND
 AVOID ANY DELAYS.
  
 ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR
 COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF
 THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY,
 NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO
 NOT HESITATE IN CONTACTING THIS OFFICE AND THIS
 REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved