| Date |
Text |
| 2007-07-14 16:49:01 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 FUEL GAS |
| | FBC-2004 BUILDING |
| | FBC-2004 CHAPTER 1 |
| | FBC-2004 CHAPTER 11 |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | WEST PALM BEACH MUNICIPAL CODE |
| | |
| | *******FROM PREVIOUS REVIEW******* |
| | |
| | 1. OK |
| | 2. OK |
| | |
| | 3. SHT G-ADA SHOW THE FOLLOWING ACCESSIBILITY |
| | REQUIREMENTS: |
| | A. 11-4.16.5 FLUSH CONTROLS __W/C |
| | B. 11-4.19.5 FAUCETS __LAVS |
| | ****RESPONSE NOTED, BUT THE CUT SHEETS WERE NOT |
| | LOCATED, THE REQUIREMENT FOR THE FLUSH CONTROLS IS THAT |
| | THE CONTROLS SHALL BE ON THE WIDE SIDE OF THE TOILET. |
| | THE REQUIREMENT FOR THE FAUCETS IS THAT THEY BE LEVER |
| | TYPE, PUSH TYPE, ELECTRONIC ETC. THESE REQUIREMENTS |
| | SHALL BE SHOWN ON THE PLANS AS CUT SHEETS CAN BE LOST |
| | ON THE JOB. |
| | |
| | 4. SHT EQ-2.1, THE 2 PAGE "WORKSHEETS" FROM DBPR HOTEL |
| | AND RESTURANT DIVISION PLAN REVIEW SHALL BE ATTACHED TO |
| | EACH SHEET STAMPED BY THE FOOD SERVICE ON EACH SET OF |
| | PLANS. SECTION 102.2.1. |
| | ****RESPONSE NOTED, BUT WORKSHEETS HAVE NOT BEEN |
| | ATTACHED TO STAMPED SHEET. -MINIMUM TWO STAMPED |
| | SHEETS REQUIRED FOR PLAN REVIEW. (ONLY ONE SHEET |
| | STAMPED BY DBPR FOUND) |
| | |
| | 5. ALL MEP SHEETS. THE ORIGINAL SIGNATURE OF THE |
| | ENGINEER IS REQUIRED WHEN THE SEAL IS AFFIXED. THE |
| | STAMPED SIGNATURE IS NOT APPROVED. FAC |
| | 61G15-23.002(1)(2) & FS 471.025. |
| | ****RESPONSE NOTED, BUT THE SIGNATURE IS SO MUCH |
| | DIFFERENT THAT A SIGNED, SEALED, DATED, NOTORIZED |
| | LETTER SHALL BE SUBMITTED INDICATING THE LEGAL |
| | SIGNATURE OF THE PROFESSIONAL ENGINEER AS WELL AS A |
| | PICTURE I.D. WITH THE ENGINEERS SIGNATURE FOR OUR |
| | FILES. |
| | |
| | 6. OK |
| | 7. OK |
| | 8. OK |
| | 9. OK |
| | 10. OK |
| | 11. OK |
| | 12. OK |
| | 13. OK |
| | |
| | 14. SHT P-3.2 THE HOT & COLD WATER SUPPLIES TO FIXTURE |
| | 13A ARE REVERSED. HOT IS SHOWN ON THE RIGHT AND COLD IS |
| | SHOWN ON THE LEFT. PLEASE CORRECT. SECTION 607.4.-- |
| | ****ALL OF THE COMMENTS HAVE BEEN ADDRESSED EXCEPT THE |
| | ABOVE PORTION. |
| | |
| | 15. SHT P-3.2 THE FOLLOWING GAS REQUIREMENTS SHALL BE |
| | SUBMITTED: |
| | |
| | A. OK |
| | |
| | B. TYPE OF GAS, (LP OR NATURAL). |
| | ****RESPONSE NOTED, BUT INFORMATION IS REQUIRED ON THE |
| | PLANS. |
| | |
| | C. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES. MATERIAL IS INDICATED AS |
| | EITHER THREADED OR WELDED ON SHT P-3.1. IF THE PIPING |
| | WILL BE WELDED, THE WELDING CERTIFICATION AND WELDING |
| | PROCEDURE WILL BE REQUIRED AT THE TIME OF GAS PERMIT |
| | APPLICATION. |
| | ****RESPONSE NOTED, BUT NOT ADDRESSED. THE NOTE STILL |
| | INDICATES IT CAN BE THREADED OR WELDED PIPE. UNTILL THE |
| | PIPE TYPE IS IDENTIFIED AS EITHER SCREW PIPE OR WELD |
| | PIPE THE PERMIT CAN NOT BE ISSUED. |
| | |
| | D. OK |
| | E. OK |
| | |
| | F. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | ****RESPONSE NOTED, BUT THE MANUF. SHEETS FOR THE |
| | DOUBLE RACK OVEN IS NOT CLEAR AND LEGIBLE ON SHEET #3 |
| | AND UL LISTING DOES NOT INDICATE WHAT IT WAS LISTED |
| | FOR. PLEASE SUBMIT A COPY OF THE UL LISTING FOR THIS |
| | PRODUCT. |
| | |
| | G. N/A |
| | H. N/A |
| | 16. OK |
| | 17. OK |
| | |
| | 18. SHT P-4.1 THE 10 GALLON HOT WATER STORAGE TANK |
| | REQUIRES A RELIEF VALVE PER SECTION 504.4 AND SHALL BE |
| | INSTALLED PER 504.4.1. THE RELIEF LINE SHALL DISCHARGE |
| | PER SECTION 504.6.1. SUBMIT A DETAIL INDICATING |
| | COMPLIANCE. IF THE STORAGE TANK IS INSTALLED ABOVE THE |
| | GROUND FLOOR SPACE, IT SHALL BE INSTALLED IN A PAN AND |
| | SHALL HAVE A PAN DRAIN LINE. SECTIONS 504.7, 504.7.1 & |
| | 504.7.2. PLEASE CLARIFY AND SUBMIT DETAILS IF |
| | REQUIRED. |
| | ****RESPONSE NOTED, BUT THE PAN DRAIN CAN NOT DRAIN |
| | INTO A FLOOR DRAIN, FLOOR DRAINS ARE NOT APPROVED |
| | INDIRECT WASTE RECEPTORS. A FLOOR SINK OR A HUB DRAIN |
| | IS REQUIRED PER SECTIONS 802.3 & 802.3.2. |
| | |
| | 19. SHT P-4.1 THE WATER HEATER SCHEMATIC SHALL SHOW ALL |
| | PIPE SIZES FOR THE WATER LINES AND THE GAS LINES.-- |
| | SCHEMATIC SHOWS 2" GAS HEADER, THIS SHALL REFLECT THE |
| | GAS RISER DIAGRAM. |
| | ****RESPONSE NOTED, BUT THE PIPEING SHOWN ON THE WATER |
| | HEATER SCHEMATIC IS NOT SHOWN ON SHEETS P2.4 OR P3.2. |
| | ALSO THE GAS HEADER ON THE RISER DIAGRAM DOES NOT |
| | REFLECT THE WATER HEATER SCHEMATIC. THE SCHEMATIC SHOWS |
| | 1-1/2" PIPE BEING PIPED IN FROM THE LEFT OF THE HEATERS |
| | AND THE SCHEMATIC SHOWS THE GAS PIPING IN FROM THE |
| | RIGHT SIDE AND IS SHOWN AS 2" PIPE. PLEASE CORRELATE |
| | RISER AND SCHEMATIC AND SHOW ALL PIPE SIZES. |
| | |
| | 20. OK |
| | |
| | 21. THE GREASE LINE SHALL DRAIN TO A GREASE |
| | INTERCEPTOR. THE INTERCEPTOR SHALL BE SIZED BY THE |
| | ENVIRONMENTAL COMPLIANCE MANAGER. PLEASE CONTACT RODNEY |
| | COMPO AT (561) 822-2272 OR CALVIN WILLIAMS AT (561) |
| | 822-2284. THEIR FAX NUMBER IS (561) 822-2287 OR THEY |
| | CAN BE REACHED BY E-MAIL [email protected] OR |
| | [email protected]. CITY CODE 90-124(7). ****RESPONSE |
| | NOTED, WAITING FOR WRITTEN NOTICE FROM R. COMPO. |
| | |
| | ********NEW COMMENT******** |
| | |
| | 1B. ALL SHEETS SHALL BE STAMPED FOR APPROVAL BY CITY |
| | PLACE MANAGEMENT PRIOR TO RESUBMITTING. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION |
| | MADE, IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE ALL VOID |
| | SHEETS FROM ALL PLANS AND PLACE ONE SET OF THEM LOOSELY |
| | ON TOP OF THE COLLATED PLANS TO BE REVIEWED. THANK YOU |
| | FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |