| 2007-04-27 18:56:07 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 FUEL GAS |
| | FBC-2004 BUILDING |
| | FBC-2004 CHAPTER 1 |
| | FBC-2004 CHAPTER 11 |
| | FLORIDA ADMINISTRATIVE CODE |
| | FLORIDA STATUTES |
| | WEST PALM BEACH MUNICIPAL CODE |
| | |
| | 1. ALL SHEETS. INDICATE THE TENANT UNIT/SPACE NUMBER IN |
| | THE TITLE BLOCK ALONG WITH THE ADDRESS. SECTION 106.1. |
| | |
| | 2. SHT EC-2.1 THE EXISTING FLOOR PLAN SHOWS NO EXISTING |
| | PLUMBING, BUT SHT A-2.0 INDICATES REMOVAL OF EXISTING |
| | PLUMBING LINES. PLEASE SHOW WHERE THE PLUMBING LINES |
| | WILL BE DEMO'D SO THE FIELD INSPECTOR CAN ASSURE THE |
| | LINES ARE DEMO'D PROPERLY AND NO DEAD ENDS ARE LEFT. |
| | SECTIONS 106.1.1 & 704.5. |
| | |
| | 3. SHT G-ADA SHOW THE FOLLOWING ACCESSIBILITY |
| | REQUIREMENTS: |
| | A. 11-4.16.5 FLUSH CONTROLS __W/C |
| | B. 11-4.19.5 FAUCETS __LAVS |
| | |
| | 4. SHT EQ-2.1, THE 2 PAGE "WORKSHEETS" FROM DBPR HOTEL |
| | AND RESTURANT DIVISION PLAN REVIEW SHALL BE ATTACHED TO |
| | EACH SHEET STAMPED BY THE FOOD SERVICE ON EACH SET OF |
| | PLANS. SECTION 102.2.1. |
| | |
| | 5. ALL MEP SHEETS. THE ORIGINAL SIGNATURE OF THE |
| | ENGINEER IS REQUIRED WHEN THE SEAL IS AFFIXED. THE |
| | STAMPED SIGNATURE IS NOT APPROVED. FAC |
| | 61G15-23.002(1)(2) & FS 471.025. |
| | |
| | 6. ALL MEP SHEETS. THE CERTIFICATE OF AUTHROIZATION |
| | NUMBER OF THE ENGINEERING BUSINESS IS REQUIRED IN THE |
| | TITLE BLOCK OF EACH SHEET. THE FLORIDA STATE WEBSITE OF |
| | THE DBPR INDICATES THAT THE STATUS OF THE CA NUMBER IS |
| | CLOSED. (SEE ATTACHED SHEET FROM WEBSITE). PLEASE |
| | SECURE A CA NUMBER PRIOR TO RESUBMITTING FOR REVIEW AT |
| | WPB. FAC 61G15-23.002(2) & FS 471.025. |
| | |
| | 7. SHT P-2.1 GENERAL PLUMBING NOTE #6 INDICATES THE |
| | SLEEVE TO BE 1" MINIMUM LARGER THAN THE PIPE PASSING |
| | THRU THE WALL. PER SECTION 305.5 THE SLEEVES SHALL BE 2 |
| | PIPE SIZES GREATER THAN THE PIPE PASSING THROUGH THE |
| | WALL. PLEASE CORRECT THE PLUMBING NOTE. |
| | |
| | 8. SHT P-2.3 THE DISH WASHER, (27A), SHALL CONNECT TO |
| | THE SANITARY SYSTEM, NOT THE GREASE SYSTEM AS SHOWN. |
| | MUNICIPAL CODE SECTION 90-124(7)(B). PLEASE CHANGE ON |
| | THE FLOOR PLAN AND THE RISER DIAGRAM. |
| | |
| | 9. SHT P-2.4 THE GAS LINE STARTS OUT 1-1/2" THEN |
| | REDUCES TO 1-1/4"AND THEN IS INDICATED AS 1-1/2" AT |
| | THE OVEN. PLEASE CLARIFY. TABLE 402.4(2). |
| | |
| | 10. SHT P-2.4 SHOW THE GAS TO THE WATER HEATERS WITH |
| | ALL OFFSETS ETC. SECTION 106.1.1. |
| | |
| | 11. SHT P-2.4 NO COLD WATER DROP NOR HOT WATER RISER |
| | FOR THE WATER HEATERS ARE INDICATED ON THE WATER |
| | PIPING. PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 12. SHT P-3.1 THE FLOOR SINK (P-7 FOR THE DISH WASHER, |
| | (27A), TO BE CONNECTED TO THE SANITARY SYSTEM AND NOT |
| | THE GREASE SYSTEM. (SEE COMMENT #8). |
| | |
| | 13. SHT P-3.1 SECTION 15400 PLUMBING NOTES 1.0 STATES |
| | DESIGN BASED ON INTERNATIONAL PLUMBING CODE. ADOPTED |
| | CODE IS THE FBC-2004 PLUMBING CODE. PLEASE CHANGE |
| | REFERENCE. SECTION 106.1.1. |
| | |
| | 14. SHT P-3.2 THE HOT & COLD WATER SUPPLIES TO FIXTURE |
| | 13A ARE REVERSED. HOT IS SHOWN ON THE RIGHT AND COLD IS |
| | SHOWN ON THE LEFT. PLEASE CORRECT. SECTION 607.4.-- |
| | THE WATER RISER DIAGRAM DOES NOT REFLECT THE FLOOR PLAN |
| | IN THE WOMEN'S TOILET ROOM. THE FLOOR PLAN INDICATES |
| | W/C P-1 ON THE FLOOR PLAN BUT IS INDICATED AS P-3 ON |
| | THE RISER DIAGRAM. THE TRAP PRIMER LINE IS SHOWN BY P-1 |
| | ON THE FLOOR PLAN, BUT THE LINE IS SHOWN BY P-3 ON THE |
| | RISER DIAGRAM. PLEASE CORRELATE THE INFORMATION. --NO |
| | COLD WATER SUPPLY AND HOT WATER LINES TO THE HEATERS |
| | ARE INDICATED.--THE STORAGE WATER HEATER REQUIRES A |
| | FULL OPEN VALVE ON THE SUPPLY LINE.--A VACUUM |
| | RELIEF VALVE IS REQUIRED ON THE BOTTOM FED WATER |
| | HEATER. SECTIONS 106.1.1., 606.1(6) & 504.2. |
| | |
| | 15. SHT P-3.2 THE FOLLOWING GAS REQUIREMENTS SHALL BE |
| | SUBMITTED: |
| | |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. THIS SHALL BE SHOWN FROM THE METER TO |
| | THE MOST REMOTE APPLIANCE. |
| | |
| | B. TYPE OF GAS, (LP OR NATURAL). |
| | |
| | C. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES. MATERIAL IS INDICATED AS |
| | EITHER THREADED OR WELDED ON SHT P-3.1. IS THE PIPING |
| | WILL BE WELDED, THE WELDING CERTIFICATION AND WELDING |
| | PROCEDURE WILL BE REQUIRED AT THE TIME OF GAS PERMIT |
| | APPLICATION. |
| | |
| | D. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). - THIS IS INDICATED AS 90 |
| | FEET ON THE PLANS, BUT CAN NOT BE VERIFIED UNTIL ALL |
| | CUT SECTION MEASURMENTS ARE SUBMITTED. (SEE GAS COMMENT |
| | A). |
| | |
| | E. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. - PLANS INDICATE |
| | 7"WC. THE PRESSURE WILL BE EITHER 2PSI OR 1/2PSI. |
| | PLEASE INDICATE ON THE PLANS. |
| | |
| | F. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | |
| | G. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | |
| | H. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES |
| | PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | |
| | 16. SUBMIT THE MANUF. SPECIFICATIONS FOR THE WATER |
| | FILTER. THE FILTER SHALL MEET THE REQUIREMENTS OF |
| | NSF-42. SECTION 611.1 |
| | |
| | 17. SUBMIT THE MANUF. SPECIFICATIONS FOR THE TEMPERING |
| | VALVE. SECTION 106.1.2. |
| | |
| | 18. SHT P-4.1 THE 10 GALLON HOT WATER STORAGE TANK |
| | REQUIRES A RELIEF VALVE PER SECTION 504.4 AND SHALL BE |
| | INSTALLED PER 504.4.1. THE RELIEF LINE SHALL DISCHARGE |
| | PER SECTION 504.6.1. SUBMIT A DETAIL INDICATING |
| | COMPLIANCE. IF THE STORAGE TANK IS INSTALLED ABOVE THE |
| | GROUND FLOOR SPACE, IT SHALL BE INSTALLED IN A PAN AND |
| | SHALL HAVE A PAN DRAIN LINE. SECTIONS 504.7, 504.7.1 & |
| | 504.7.2. PLEASE CLARIFY AND SUBMIT DETAILS IF |
| | REQUIRED. |
| | |
| | 19. SHT P-4.1 THE WATER HEATER SCHEMATIC SHALL SHOW ALL |
| | PIPE SIZES FOR THE WATER LINES AND THE GAS LINES.-- |
| | SCHEMATIC SHOWS 2" GAS HEADER, THIS SHALL REFLECT THE |
| | GAS RISER DIAGRAM. |
| | |
| | 20. SHT P-4.1 THE 4 POD WATER FILTER DETAIL SHOWS A |
| | RESIN TANK & A BRINE TANK THAT IS NOT SHOWN ON THE |
| | FLOOR PLAN. PLEASE CLARIFY AND CORRELATE THE |
| | INFORMATION. THE SYSTEM ALSO SHOWS A 1" LINE THAT |
| | STATES "TO DRAIN". PLEASE INDICATE WHERE IT WILL DRAIN |
| | TO.SECTIONS 106.1.1 802.1.5. |
| | |
| | 21. THE GREASE LINE SHALL DRAIN TO A GREASE |
| | INTERCEPTOR. THE INTERCEPTOR SHALL BE SIZED BY THE |
| | ENVIRONMENTAL COMPLIANCE MANAGER. PLEASE CONTACT RODNEY |
| | COMPO AT (561) 822-2272 OR CALVIN WILLIAMS AT (561) |
| | 822-2284. THEIR FAX NUMBER IS (561) 822-2287 OR THEY |
| | CAN BE REACHED BY E-MAIL [email protected] OR |
| | [email protected]. CITY CODE 90-124(7). |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |