| Date |
Text |
| 2008-06-16 08:59:33 | REVIEW #: 2ND |
| | ACTION: DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2005 AND 2006 SUPPLEMENTS FBC |
| | CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH |
| | PREVIOUS REVIEW COMMENTS AS WELL AS DESIGNER'S WRITTEN |
| | RESPONSES FOR THE PURPOSE OF CONTINUITY. |
| | |
| | 1 THROUGH 3: OK |
| | |
| | 4. NOT ALL PLENUM CLOSET DOORS HAVE BEEN CORRECTLY |
| | DESIGNATED AS METAL DOORS. EXAMPLE: IN MANAGER OFFICE |
| | A116, THE CLOSET FOR AC-7 SERVES AS A PLENUM AND HAS A |
| | #8 DOOR DESIGNATION ON PG A101. COMMON AREA DOOR |
| | SCHEDULE ON PG A400 SHOWS A #8 DOOR TO BE A WOOD DOOR. |
| | PLEASE CHECK AND VERIFY ALL DOORS ON PLENUM CLOSETS ARE |
| | CORRECTLY DESIGNATED ON PLANS TO DEMONSTRATE COMPLIANCE |
| | WITH FBCM 602.2.1. |
| | |
| | 5 THROUGH 7: OK |
| | |
| | 8. THE WRITTEN RESPONSE TO THIS COMMENT INDICATES THE |
| | PRESENCE OF PERMANENT OPENINGS TO BE USED IN |
| | CONJUNCTION WITH THE CIRCULATION FANS TO PROVIDE THE |
| | CONTINUOUS VENTILATION RATE OF 0.05 CFM/SF. PAGE A101 |
| | NOW SHOWS ROLLUP DOORS AT THE LOCATION OF THE |
| | PREVIOUSLY PERMANENT OPENINGS. FOR THIS REASON, ANOTHER |
| | MEANS OF INTRODUCING OUTSIDE AIR FOR GARAGE VENTILATION |
| | IS REQUIRED FOR BOTH THE CONTINUOUS AND THE ELEVATED |
| | VENTILATION RATE IN ACCORDANCE WITH FBCM 403.2 AND FBCM |
| | 4042. |
| | |
| | 9. OK |
| | |
| | 10. SEQUENCE OF OPERATIONS FOR GARAGE EXHAUST WILL BE |
| | AFFECTED BY COMMENT #8 ABOVE. |
| | |
| | 11. SMOKE CONTROL RATIONAL ANALYSIS HAS BEEN RECEIVED. |
| | THE SMOKE CONTROL SYSTEM WILL BE REVIEWED AT THE END OF |
| | THIS REVIEW. |
| | |
| | 12 AND 13: OK |
| | |
| | 14. NEW SUPPLY FANS HAVE BEEN ADDED SINCE LAST REVIEW. |
| | SF-3, 4, 5, 6 ALL EXCEED 2000 CFM AND REQUIRE FAN |
| | SHUT-DOWN BY SMOKE DETECTOR IN ACCORDANCE WITH FBCM |
| | 606.1.1. PROVIDE DUCT SMOKE DETECTORS ON THE SUPPLY |
| | SIDE OF THESE FANS TO DEMONSTRATE COMPLIANCE WITH THIS |
| | SECTION. |
| | |
| | 15 THROUGH 23: OK |
| | |
| | 24: IT IS THE DETERMINATION OF THE BUILDING OFFICIAL |
| | THAT THE REQUIREMENT FOR FAN SHUT-DOWN BY SMOKE |
| | DETECTOR SHALL BE DETERMINED BASED ON THE CAPACITY OF |
| | THE AIR HANDLING APPLIANCE. PROVIDE DOCUMENTATION FROM |
| | THE APPLIANCE MANUFACTURER INDICATING THAT THIS |
| | APPLIANCE IS NOT CAPABLE OF PRODUCING AIR VOLUMES IN |
| | EXCESS OF 2,000 CFM UNDER ANY CONFIGURATION. IN LIEU OF |
| | THIS INFORMATION, FAN SHUT-DOWN BY SMOKE DETECTOR IS |
| | REQUIRED. |
| | |
| | 25 THROUGH 27: OK |
| | |
| | 28. THE NOTES ON PAGE AC-12 RELATED TO LOUVERS FOR THE |
| | GENERATOR ROOM ARE CUT-OFF AND CAN NOT BE READ. PLEASE |
| | CORRECT AND RESUBMIT. OTHERWISE, THIS COMMENT IS |
| | ADEQUATELY ADDRESSED. |
| | |
| | 29 THROUGH 33: OK |
| | |
| | 34. SMOKE CONTROL TO BE REVIEWED AT THE END OF THESE |
| | COMMENTS/RESPONSES. |
| | |
| | 35. OK |
| | |
| | 36. SEE COMMENT #24 ABOVE. |
| | |
| | 37 THROUGH 44: OK |
| | |
| | 45. PART (3): HP DETAIL CALLS FOR ? INCH COPPER |
| | CONDENSATE DRAIN AND TRAP. THIS APPEARS TO BE A |
| | TYPOGRAPHICAL ERROR. PLEASE CORRECT AND RESUBMIT. |
| | |
| | 46. OK |
| | |
| | 47. THE ADDRESS ON THE SUMMARY FORM HAS NOT BEEN |
| | CORRECTED. ADDITIONALLY THE FOLLOWING ISSUES HAVE COME |
| | TO LIGHT REGARDING THE ENERGY CALCULATIONS: |
| | A) IN THE INPUT DATA REPORT (IDR) UNDER SPACES, ZONE: |
| | APTMS 3-14, THIS SPACE SHOULD HAVE A MULTIPLIER OF 12 |
| | FOR A TOTAL VOLUME OF 1,192,212.0 CUBIC FEET. SEE ZONE: |
| | CORRIDOR FOR AN EXAMPLE. |
| | B) IN THE IDR THERE IS NOTHING LISTED FOR DOORS OR |
| | FLOORS. PLEASE CORRECT. |
| | C) THE PIPING SECTION IS CALLING FOR 1.5 INCH |
| | INSULATION ON DOMESTIC HOT WATER PIPING. WHERE CAN THIS |
| | INFORMATION BE FOUND ON PLANS? |
| | D) NO COOLING LOAD CALCULATIONS OR SYSTEM SIZING |
| | SUMMARY WAS FOUND ATTACHED TO THE ENERGY CALCULATIONS |
| | AS REQUIRED BY FBCB 13-407-1-ABC.1. |
| | E) THESE COMMENTS ARE BASED ON A BRIEF OVERVIEW OF THE |
| | ENERGY CALCULATIONS. PLEASE SEE OTHER TRADE REVIEWS FOR |
| | OTHER POTENTIAL COMMENTS. PLEASE VERIFY ALL INFORMATION |
| | IN THE IDR CORRESPONDS WITH THE INFORMATION ON THE |
| | PLANS PRIOR TO RESUBMITTAL. |
| | |
| | 48 AND 49: OK |
| | |
| | NEW: THE FOLLOWING ARE NEW COMMENTS RELATED TO DESIGN |
| | CHANGES AND ADDITIONAL INFORMATION WHICH HAS BEEN |
| | PROVIDED SINCE FIRST REVIEW: |
| | |
| | 50. AC-01 STAIR #1 CORRIDOR: DUCTS FOR AC-6 ARE SHOWN |
| | PENETRATING THE ENCLOSED EXIT PASSAGEWAY. PENETRATIONS |
| | INTO AND OPENINGS THROUGH AN EXIT PASSAGEWAY ARE |
| | PROHIBITED EXCEPT FOR REQUIRED EXIT DOORS, EQUIPMENT |
| | AND DUCTWORK NECESSARY FOR INDEPENDENT PRESSURIZATION |
| | IN ACCORDANCE WITH FBCB 1020.5. PAGE AC-01 SHOWS A |
| | 2-HOUR RATED ENCLOSURE AT THE LOCATION OF THESE DUCTS |
| | IN THE EXIT PASSAGEWAY, BUT NO SUCH STRUCTURE IS SHOWN |
| | ON THE ARCHITECTURAL PAGES. PAGE A-101A SHOWS ONLY BARE |
| | CONCRETE CEILINGS AT THIS LOCATION. ALSO, BOTH DUCTS |
| | ARE SHOWN PENETRATING TWO 2-HOUR FIRE BARRIERS AT THE |
| | EXIT PASSAGEWAY WITHOUT PROTECTION OF THE PENETRATIONS. |
| | DUCT PENETRATIONS AND AIR TRANSFER OPENINGS IN FIRE |
| | BARRIERS SHALL BE PROTECTED WITH APPROVED FIRE DAMPERS |
| | INSTALLED IN ACCORDANCE WITH FBCM 607.5.2. |
| | |
| | 51. AC-01 STAIR #2 CORRIDOR: DUCTS FOR AC-7 AND |
| | REFRIGERANT PIPING FOR AC-5 ARE SHOWN PENETRATING AN |
| | ENCLOSED EXIT PASSAGEWAY. PLEASE SEE COMMENT #50 ABOVE |
| | FOR RELEVANT CONDITIONS AND CODE SECTIONS. |
| | |
| | 52. AC-01: THE EXHAUST DUCT FOR EF-2 IS SHOWN |
| | PENETRATING A 2-HOUR RATED FIRE BARRIER WITHOUT |
| | PROTECTION OF THE PENETRATION. DUCT PENETRATIONS AND |
| | AIR TRANSFER OPENINGS IN FIRE BARRIERS SHALL BE |
| | PROTECTED WITH APPROVED FIRE DAMPERS IN ACCORDANCE WITH |
| | FBCM 607.5.2. SHOW HOW THIS DUCT PENETRATION IS TO BE |
| | PROTECTED. |
| | |
| | 53. AC-01: THERE ARE SEVERAL FIRE DAMPERS SHOWN ON |
| | FLOOR PLAN WHERE DUCTS ARE PENETRATING NON-RATED WALL |
| | ASSEMBLIES ACCORDING TO PAGE A101. EXAMPLES: THE 24X10 |
| | SUPPLY TRUNK LINE FOR AC-3, THE 24X10 SUPPLY AND RETURN |
| | DUCTS FOR AC-2, THE 20X10 SUPPLY TRUNK LINE FOR AC-4. |
| | PLEASE COORDINATE MECHANICAL AND ARCHITECTURAL PLANS, |
| | SHOWING FIRE DAMPERS AT THE LOCATION OF RATED |
| | ASSEMBLIES ONLY. FIRE DAMPERS SHALL BE INSTALLED IN |
| | ACCORDANCE WITH THEIR LISTING (AT RATED ASSEMBLIES) PER |
| | FBCM 607.2. |
| | |
| | NOTE: THE FOLLOWING COMMENTS ARE RELATED TO THE |
| | PROPOSED SMOKE CONTROL SYSTEM. THIS IS THE FIRST REVIEW |
| | OF THE SMOKE CONTROL SYSTEM AS NO INFORMATION WAS |
| | PROVIDED REGARDING THIS SYSTEM AT TIME OF FIRST |
| | REVIEW. |
| | |
| | 54. THE RATIONAL ANALYSIS CALLS FOR A COMBINATION OF |
| | MECHANICAL AN PASSIVE SYSTEMS. THE PASSIVE SYSTEMS ARE |
| | TO BE USED TO SEPARATE PORTIONS OF THE BUILDING INTO |
| | SMOKE ZONES WITH APPROVED SMOKE BARRIERS. THE LOCATIONS |
| | OF THE SMOKE ZONES IS NOT INDICATED ANYWHERE ON THE |
| | PLANS. ALSO, THERE IS NO INDICATION OF THE LOCATIONS OF |
| | SMOKE BARRIERS IN THE ARCHITECTURAL PLANS. |
| | |
| | 55. IN CONJUNCTION WITH COMMENT #54 ABOVE, THERE IS |
| | ALSO NO INDICATION ON PLANS AS TO THE PRESENCE OF |
| | SPOT-TYPE SMOKE DETECTORS LISTED FOR RELEASING SERVICE |
| | IN EACH SMOKE ZONE BEING PROTECTED BY A PASSIVE SYSTEM |
| | IN ACCORDANCE WITH FBCB 909.12.2.2. THIS PART OF THE |
| | SYSTEM IS NOT COVERED IN THE FIRE ALARM RISER DIAGRAM, |
| | THE FIRE ALARM SEQUENCE OF OPERATIONS OR THE SMOKE |
| | CONTROL SEQUENCE OF OPERATIONS. PLEASE CLARIFY. THERE |
| | ARE SEVERAL SMOKE DAMPERS IN CORRIDOR WALLS AND |
| | ELEVATOR LOBBIES AS SHOWN ON FLOOR PLANS WITH NO |
| | INDICATION ON FIRE ALARM OR SMOKE CONTROL SEQUENCE |
| | SHOWING HOW THESE DAMPERS ARE TO BE CONTROLLED. |
| | |
| | 56. AC-15 CALLS FOR A SMOKE CONTROL PANEL, PRESUMABLY |
| | LOCATED IN THE FIRE COMMAND ROOM, BUT THIS PANEL IS NOT |
| | SHOWN ON OTHER PLANS. A FIRE-FIGHTER?S SMOKE CONTROL |
| | PANEL FOR FIRE DEPARTMENT EMERGENCY RESPONSE PURPOSES |
| | ONLY SHALL BE PROVIDED AND SHALL INCLUDE MANUAL CONTROL |
| | OR OVERRIDE OF AUTOMATIC CONTROL FOR MECHANICAL SMOKE |
| | CONTROL SYSTEMS. THE PANEL SHALL BE LOCATED IN A FIRE |
| | COMMAND CENTER COMPLYING WITH SECTION 911 IN HIGH-RISE |
| | BUILDINGS IN ACCORDANCE WITH FBCB 909.16. |
| | |
| | 57. HOW WILL PASSIVE SYSTEMS BE TESTED? SEE FBCB |
| | 909.5.1. |
| | |
| | 58. PAGE 3 OF THE RATIONAL ANALYSIS SAYS ?INJECTION |
| | POINTS AT TOP OF STAIR AND LEVEL 10.? MECHANICAL FLOOR |
| | PLANS DO NOT SHOW ANY SUPPLY FANS, DUCTWORK OR ACTUAL |
| | INJECTION POINTS FOR STAIR ENCLOSURES. PLEASE CLARIFY |
| | AND COORDINATE FLOOR PLANS WITH THE RATIONAL ANALYSIS. |
| | |
| | 59.AC-14: FAN SCHEDULE SHOWS SF-3 FOR STAIR |
| | PRESSURIZATION BUT THE FLOOR PLAN SHOWS IT IS FOR |
| | ELEVATOR PRESSURIZATION. SF-7 AND SF-8 ARE ALSO |
| | MISLABELED ON SCHEDULE. PLEASE CLARIFY AND COORDINATE |
| | FLOOR PLANS WITH SCHEDULES. |
| | |
| | 60. PROVIDE INFORMATION ON SPECIAL INSPECTION AGENCY TO |
| | BE USED WITH DOCUMENTATION/EVIDENCE OF QUALIFICATIONS |
| | IN ACCORDANCE WITH FBCB 909.18.8.2. |
| | |
| | 61. PROVIDE THREE COPIES OF SMOKE CONTROL RATIONAL |
| | ANALYSIS, SIGNED AND SEALED BY THE DESIGN PROFESSIONAL. |
| | FBCB 909.4, FBCB 106.1. |
| | |
| | 62. IN ACCORDANCE WITH FLORIDA ADMINISTRATIVE CODE RULE |
| | 9B-3.0472, THIS BUILDING IS SUBJECT TO THE FOLLOWING |
| | REQUIREMENTS: |
| | (2) EVERY BUILDING FOR WHICH A PERMIT FOR NEW |
| | CONSTRUCTION IS ISSUED ON OR AFTER 7/1/08 AND HAVING A |
| | FOSSIL-FUEL-BURNING HEATER OR APPLIANCE, A FIREPLACE, |
| | OR AN ATTACHED GARAGE SHALL HAVE AN OPERATIONAL CARBON |
| | MONOXIDE ALARM INSTALLED WITHIN 10 FEET OF EACH ROOM |
| | USED FOR SLEEPING PURPOSES. |
| | (3) IN NEW CONSTRUCTION, ALARMS SHALL RECEIVE THEIR |
| | PRIMARY POWER FROM THE BUILDING WIRING WHEN SUCH WIRING |
| | IS SERVED FROM THE LOCAL POWER UTILITY. SUCH ALARMS |
| | SHALL HAVE BATTERY BACK UP. |
| | (4) COMBINATION SMOKE/CARBON MONOXIDE ALARMS SHALL BE |
| | LISTED OR LABELED BY A NATIONALLY RECOGNIZED TESTING |
| | LABORATORY. |
| | |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |