Plan Review Notes
Plan Review Notes For Permit 07030460
Permit Number 07030460
Review Stop P
Sequence Number 1
Notes
Date Text
2007-04-23 19:03:51DENIED
 REFERENCE: FBC-2004 PLUMBING
 FBC-2004 FUEL GAS
 FBC-2004 BUILDING
 FBC-2004 CHAPTER 1
 FBC-2004 CHAPTER 11
 FHA-98 DESIGN MANUAL
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
 MUNICIPAL CODE WPB
  
 1. SHT 2 OF 6A BACKFLOWS FOR THE DOMESTIC WATER SERVICE
 SHALL BE AT LEAST THE SAME SIZE AS THE LINE IN WHICH
 THER ARE INSTALLED.4" BACKFLOWS ARE REQUIRED. 4"
 WATER SERVICE SHOWN. TABLE 603.1(D).
  
 2. SHT 358-9 ENGINEERS SHALL LEGIBLY INDICATE THEIR
 NAME, ADDRESS, AND LICENSE NUMBER ON EACH SHEET. IF
 PRACTICING THROUGH A DULY AUTHORIZED ENGINEERING
 BUSINESS, THEY SHALL ALSO INDICATE THE NAME, ADDRESS
 AND CERTIFICATE OF AUTHORIZATION NUMBER OF THE
 ENGINEERING BUSINESS ON EACH SHEET.FAC
 61G15-23.002(1)(2) & FS 471.025.
  
 3. SHT A01.2 SUBMIT THE MANUF. SPECIFICATION SHEETS FOR
 THE LIFT STATION. SECTIONS 106.1.2 & 303.2 303.4.
  
 4. SHT A01.3 SECONDARY ROOF DRAINS REQUIRED FOR THE
 AREA NEAR STAIR G1, PUMP ROOM, LAWN EQUIP. ETC.
 SECTIONS 1107.1 & 1107.2.
  
 5. SHT A01.3 THERE IS NO PRIMARY OR SECONDARY ROOF
 DRAINS INDICATED IN THE AREA OF STAIR G2, EMERGENCY
 GENERATOR ROOM AND LIFT AS REQUIRED IN SECTIONS 1101.2,
 1107.1 & 1107.2.
  
 6. SHT A01.3 ROOF DRAINS LOCATED AT THE WALLS STATES 4"
 RD (TYP) SEE PLUMBING DRAWINGS & DETAIL. PLEASE
 INDICATE WHERE IN THE PLUMBING PLANS THESE CAN BE
 FOUND. SECTION 106.1.1.
  
 7. SHT A01.3ROOF DRAINS ARE SHOWN IN AREAS INDICATED
 AS MULCH AREAS.MORE INFORMATION IS REQUIRED. PLEASE
 INDICATE HOW THE MULCH WILL BE KEPT FROM DRAINING INTO
 THE ROOF DRAINS AND OR CLOGING THE ROOF DRAINS AND
 PREVENTING THEM FROM DRAINING PROPERLY.PLEASE SUBMIT
 A DETAIL FOR THE DRAINS IN THESE AREAS. SECTION 104.6.
  
 8. SHT A01.3ROOF DRAINAGE INDICATES DETAILS A/A803 &
 D/A803. SECTION 1105.1 STATES ROOF DRAINS SHALL HAVE
 STRAINERS EXTENDING NOT LESS THAN 4 INCHES ABOVE THE
 SURFACE OF THE ROOF IMMEDIATELY ADJACENT TO THE ROOF
 DRAINS. STRAINER SHALL HAVE AN AVAILABLE INLET AREA,
 ABOVE THE ROOF, OF NOT LESS THAN ONE AND ONE-HALF TIMES
 THE AREA OF THE CONDUCTOR OR LEADER TO WHICH THE DRAIN
 IS CONNECTED. PLEASE INDICATE HOW THIS AND THE FACT
 THAT THE ROOF DRAIN WILL BE COVERED WITH ROCKS WILL
 MEET THIS CODE REQUIREMENT. THERE IS A CONCERN THAT THE
 GRASS CLIPPINGS, DIRT, MOSS BUILD UP ETC WILL
 EVENTUALLY KEEP THE DRAIN FROM DRAINING AS INTENDED.
 PLEASE SUBMIT INFORMATION ON HOW THIS WILL BE
 ADDRESSED. SECTION 104.6.
  
 9. SHT A01.3 OVERFLOW DRAINS DETAILS B/A803 & C/A803 DO
 NOT MEET THE INTENT OF THE CODE TO BE USED ONLY IN CASE
 OF BLOCKAGE OF THE PRIMARY ROOF DRAINS. THESE DETAILS
 INDICATE THAT THE DRAINS ARE FLUSH WITH THE ROOF AND
 WILL DRAIN WHEN THE PRIMARY ROOF DRAINS DRAIN AND NOT
 AFTER THE BUILDUP OF A BLOCKED PRIMARY DRAIN. DRAINS
 INDICATED IN DETAIL C/A803 ARE SHOWN TO BE NEXT TO AN
 AREA THAT HAS MULCH IN IT. PLEASE CLARIFY AND INDICATE
 HOW THE MULCH WILL NOT BLOCK THE DRAINS. SECTION
 1107.1
  
 10. SHT A01.3 SHOWS 4" RD'S IN PLANTERS. PLEASE
 CLARIFY. PLEASE SUBMIT A DETAIL. SECTION 106.1.1.
  
 11. SHT A01.3 SUBMIT CALCULATIONS FOR PRIMARY AND
 SECONDARY ROOF DRAINS PER SECTIONS 1106 & 1107 WITH ALL
 SUBSECTIONS AND TABLES. SHOW THE SQUARE FOOTAGE OF EACH
 DRAIN AND INCLUDE 1/2 AREA OF ALL VERTICAL WALLS
 INCLUDING PARAPETS AND SHOW ANY ROOF AREA THAT
 CONTRIBUTES TO THE SQUARE FOOTAGE OF ANY DRAIN FROM
 ROOF AREAS ABOVE.
  
 12. SHT A01.3 UPPER ROOF PLANS. PER SECTION 1107.1
 SECONDARY ROOF DRAINS OR SCUPPERS SHALL BE PROVIDED
 WHERE THE ROOF PERIMETER CONSTRUCTION EXTENDS ABOVE THE
 ROOF. PER SECTION 1107.2 SEPARATE SYSTEMS ARE REQUIRED.
 PLEASE SHOW THE SECONDARY ROOF DRAINS/SCUPPERS.
  
 13. SHT A01.3 INDICATE IF THE WATERFALL WILL HAVE A
 SEPARATE WATER SUPPLY. IF SO INDICATE THE REQUIRED
 METHOD OF BACKFLOW PREVENTION. SECTION 608. ALSO
 INDICATE IF THERE WILL BE A DRAIN FOR THE WATERFALL.
 SECTION 106.1.1.
  
 14. SHT A101 SHOW THE CLEAR FLOOR SPACE FOR ALL
 ACCESSIBLE FIXTURES IN ALL TOILET ROOMS. SUBMIT A
 DETAIL SHOWING COMPLIANCE WITH SECTIONS 11-4.16,
 11-4.17, 11-4.18, 11-4.19 AND 11-4.22 WITH ALL
 SUBSECTIONS.
  
 15. SHT A104 SUBMIT CALCULATIONS FOR PRIMARY AND
 SECONDARY ROOF DRAINS PER SECTIONS 1106 & 1107 WITH ALL
 SUBSECTIONS AND TABLES. SHOW THE SQUARE FOOTAGE OF EACH
 DRAIN AND INCLUDE 1/2 AREA OF ALL VERTICAL WALLS
 INCLUDING PARAPETS AND SHOW ANY ROOF AREA THAT
 CONTRIBUTES TO THE SQUARE FOOTAGE OF ANY DRAIN FROM
 ROOF AREAS ABOVE.
  
 16. SHT A107 SUBMIT CALCULATIONS FOR PRIMARY AND
 SECONDARY ROOF DRAINS PER SECTIONS 1106 & 1107 WITH ALL
 SUBSECTIONS AND TABLES. SHOW THE SQUARE FOOTAGE OF EACH
 DRAIN AND INCLUDE 1/2 AREA OF ALL VERTICAL WALLS
 INCLUDING PARAPETS AND SHOW ANY ROOF AREA THAT
 CONTRIBUTES TO THE SQUARE FOOTAGE OF ANY DRAIN FROM
 ROOF AREAS ABOVE.--NO SECONDARY ROOF DRAINS ARE
 INDICATED FOR THE INTERIOR ROOF DRAIN AREAS AS REQUIRED
 IN SECTIONS 11-7.1 & 1107.2. PLEASE SHOW THE LOCATION
 OF THE REQUIRED SECONDARY DRAINS.--SCUPPERS
 INDICATED AS 4"X8"ALUM. TRANSFER SCUPPERS AS
 REFERENCED AS DETAIL C/802 ARE NOT APPROVED. PER
 SECTION 1503.4.3. OVERFLOW SCUPPERS SHALL BE PLACED IN
 THE WALL NOT LESS THAN 2" NOR MORE THAN 4" ABOVE THE
 ROOF.
  
 17. SHTS A201, A203, A205, A207 & A209. INDICATE
 SPECIFICATION "A" OR "B" FOR ALL UNITS AS REQUIRED PER
 PAGES 7.34 & 7.35.
  
 18. SHT A201 UNITS A & A REV. INDICATE THE BACKING FOR
 THE TUB IN THE MASTER BATH PER PAGE 6.10.--THE WING
 WALL NEXT TO THE W/C IN THE MASTER BATH TO BE A MAXIMUM
 2'0" PER PAGE 7.44.--LAVS SHALL BE CENTERED ON THE
 48" DIMENSION OF THE CLEAR FLOOR SPACE PER PAGE 7.48 OR
 FORWARD APPROACH WITH REMOVABLE BASE CABINET SHALL BE
 INDICATED.--SHOW THE CLEAR FLOOR SPACE FOR THE
 W/C'S. PAGE 7.43.--RANGE SHALL BE CENTERED ON THE
 48" DIMENSION OF THE CLEAR FLOOR SPACE PER PAGES 7.4 &
 7.9. --THE OPENING FOR THE W/C'S IN BATH 2 SHALL BE
 33" AND MUST SHOW 18" OFF THE TUB OR LAV TO THE CENTER
 OF THE FIXTURE AND 15" MIN. OFF THE OTHER FIXTURE.
 PAGES 7.43, 7.44 & 7.45.--MINIMUM CLEARANCES
 BETWEEN ALL COUNTERS, APPLIANCES, BASE CABINETS AND
 WALLS SHALL BE 40". PAGES 7.8, 7.11, 7.22 & 7.23. 36"
 IS SHOWN. PLEASE SHOW COMPLIANCE.
  
 19. SHT A203 UNITS B & B REV. INDICATE THE BACKING FOR
 THE TUB IN THE MASTER BATH PER PAGE 6.10.--SHOW THE
 CLEAR FLOOR SPACE FOR THE W/C IN THE MASTER BATH PER
 PAGE 7.43.--THE W/C IN THE MASTER BATH SHALL BE 18"
 OFF THE WALL TO THE CENTERLINE OF THE FIXTURE PER PAGE
 6.5.--LAVS SHALL BE CENTERED ON THE 48" DIMENSION
 OF THE CLEAR FLOOR SPACE PER PAGE 7.48 OR FORWARD
 APPROACH WITH REMOVABLE BASE CABINET SHALL BE
 INDICATED.--BATH #2 OPENING FOR THE W/C SHALL BE
 MINIMUM 33". INDICATE MEASURMENT FROM THE CENTERLINE OF
 THE W/C TO THE SIDE OF THE VANITY PER PAGES 7.43, 7.44
 & 7.45.--MINIMUM CLEARANCES BETWEEN ALL COUNTERS,
 APPLIANCES, BASE CABINETS AND WALLS SHALL BE 40".
 (SHOWN AS 36"). PAGES 7.8, 7.11, 7.22 & 7.23. 36".
 PLEASE SHOW COMPLIANCE.
  
 20. SHT A205 UNIT C. INDICATE THE BACKING FOR THE TUB
 IN THE MASTER BATH PER PAGE 6.10.-- SHOW THE CLEAR
 FLOOR SPACE FOR THEUSABLE W/C PER PAGE 7.43.-- SHOW
 THE CLEAR FLOOR SPACE FOR THE TUBS OR SHOWERS PER PAGES
 7.53 THRU 7.56.--W/C'S SHALL BE 1'6" OFF THE WALL
 TO THE CENTERLINE OF THE FIXTURE PER PAGE 6.5. --
  
 21. SHT A207 UNITS D & D REV.INDICATE THE BACKING FOR
 THE TUB IN THE MASTER BATH PER PAGE 6.10.--SHOW THE
 CLEAR FLOOR SPACE FOR THE USABLE W/C PER PAGE 7.43.--
 SHOW THE OPENING FOR THE W/C IN BATH #2 TO BE A MINIMUM
 OF 33". THE W/C SHALL BE 1'6" OFF ONE FIXTURE TO THE
 CENTERLINE OF THE FIXTURE AND 15" MINIMUM OFF THE OTHER
 FIXTURE OR VANITY CABINET PER PAGES 7.43 THRU 7.45.--
 MINIMUM CLEARANCES BETWEEN ALL COUNTERS, APPLIANCES,
 BASE CABINETS & WALLS SHALL BE 40". PAGES 7.8, 7.11,
 7.22 & 7.23. 36" IS SHOWN. PLEASE SHOW COMPLIANCE.
  
 22. SHT A209 UNITS PHA & PHA REV. INDICATE THE BACKING
 FOR THE TUB IN THE MASTER BATH PER PAGE 6.10.--SHOW
 THE CLEAR FLOOR SPACE FOR THE W/C IN THE MASTER BATH
 PER PAGE 7.43.--THE WING WALL NEXT TO THE W/C IN
 THE MASTER BATH SHALL BE A MAXIMUM OF 2'0" PER PAGE
 7.44.--THE LAVS SHALL BE CENTERED ON THE 48"
 DIMENSION OF THE CLEAR FLOOR SPACE PER PAGE 7.48 OR
 FORWARD APPROACH.--A MINIMUM 33" OPENING IS
 REQUIRED FOR THE W/C IN BATH #2. SHOW THE W/C TO BE
 1'6" OFF ONE FIXTURE TO THE CENTERLINE OF THE FIXTURE,
 AND A MINIMUM OF 15" OFF THE OTHER FIXTURE OR VANITY
 CABINET.--MINIMUM CLEARANCES BETWEEN ALL COUNTERS,
 APPLIANCES, BASE CABINETS & WALLS SHALL BE 40". PAGES
 7.8, 7.11, 7.22 & 7.23. 36" IS SHOWN. PLEASE SHOW
 COMPLIANCE.
  
 23. SHT A212 UNITS PHB & PHB REV. INDICATE THE BACKING
 FOR THE TUB IN THE MASTER BATH PER PAGE 6.10.--SHOW
 THE CLEAR FLOOR SPACE FOR THE USABLE W/C IN THE MASTER
 BATH PER PAGE 7.43.--THE W/C IN THE MASTER BATH
 SHALL BE 18" OFF THE WALL TO THE CENTERLINE OF THE
 FIXTURE PER PAGE 6.5.--THE LAVS SHALL BE CENTERED
 ON THE 48" DIMENSION OF THE CLEAR FLOOR SPACE PER PAGE
 7.48 OR FORWARD APPROACH.--A MINIMUM 33" OPENING IS
 REQUIRED FOR THE W/C IN BATH #2. SHOW THE W/C TO BE
 1'6" OFF ONE FIXTURE TO THE CENTERLINE OF THE FIXTURE,
 AND A MINIMUM OF 15" OFF THE OTHER FIXTURE OR VANITY
 CABINET.--MINIMUM CLEARANCES BETWEEN ALL COUNTERS,
 APPLIANCES, BASE CABINETS & WALLS SHALL BE 40". PAGES
 7.8, 7.11, 7.22 & 7.23. 36" IS SHOWN. PLEASE SHOW
 COMPLIANCE.
  
 24. SHT A214 INDICATES DETAIL B/A802 BUT NO SCUPPER IS
 SHOWN. PLEASE CLARIFY. SECTION 106.1.1.
  
 25. SHT A215 INDICATE THE BACKING FOR THE TUB IN BOTH
 BATHS PER PAGE 6.10.--SHOW THE CLEAR FLOOR SPACE
 FOR THE W/C IN BOTH BATHS PER PAGE 7.43.--THE W/C
 IN BOTH BATHS SHALL BE 18" OFF THE WALL TO THE
 CENTERLINE OF THE FIXTURE PER PAGE 6.5.--THE LAVS
 IN THE MASTER BATH SHALL BE CENTERED ON THE 48"
 DIMENSION OF THE CLEAR FLOOR SPACE PER PAGE 7.48 OR
 FORWARD APPROACH. PLEASE SHOW COMPLIANCE.
  
 26. SHT A400 GROUND FLOOR AND COMMON AREA FINISH
 SCHEDULE. ROOMS 106, 107 & 108 SHOW WALLBOARD FOR THE
 FINISH. PER SECTION 1210.2 WALLS WITHIN 2 FEET OF A W/C
 OR URINAL SHALL HAVE A SMOOTH, HARD, NONABSORBENT
 SURFACE TO A HEIGHT OF 4' ABOVE THE FLOOR. WALLBOARD
 DOES NOT COMPLY WITH THIS REQUIREMENT. PLEASE INDICATE
 METHOD OF COMPLIANCE.
  
 27. SHT A404 SHOW COMPLIANCE WITH THE FOLLOWING: __FOR
 W/C'S:
 A. 11-4.16.5 FLUSH CONTROLS
 B. 11-4.16.6 DISPENSERS
 __FOR LAVS:
 A. 11-4.19.2 HEIGHT & CLEARANCES
 B. 11-4.19.5 FAUCETS
  
 28. SHT A405 SHOW COMPLIANCE WITH THE FOLLOWING: __FOR
 W/C'S:
 A. 11-4.16.2 CLEAR FLOOR SPACE
 B. 11-4.16.4 GRAB BARS (1-1/2" BETWEEN THE WALL &
 GB)
 C. 11-4.16.5 FLUSH CONTROLS
 __STALLS:
 A. SEE FIG. 30E
 __LAVS:
 A. 11-4.19.2 HEIGHT & CLEARANCES
 B. 11-4.19.3 CLEAR FLOOR SPACE
 C. 11-4.19.5 FAUCETS
 __FOR THE SHOWER:
 A. 11-4.21.3 SEAT HEIGHT
 B. 11-4.21.5 CONTROL HEIGHT
  
 29. SHT A700 INDICATES PALM BEACH COUNTY ACCESSIBILITY
 NOTES. THE CODE REFERENCE SHALL BE FBC-2004 CHAPTER 11
 AND/OR FHA-98 DESIGN MANUAL. PLEASE CHANGE REFERENCE.
  
 30. SHT A7.00 NOTE 04) D) INDICATESLAVATORIES TO BE
 15"FROM THE WALL TO THE CENTERLINE OF THE FIXTURE.
 PER PAGE 7.48 THE LAV SHALL BE A MINIMUM OF 24" TO THE
 CENTERLINE OF THE FIXTURE OFF THE WALL OR CENTERED ON
 THE 48" DIMENSION OF THE CLEAR FLOOR SPACE, OR IF
 FORWARD APPROACH INDICATE REMOVABLE BASE CABINETS.
  
 31. SHT A700 NOTE AFTER 16) REFERENCES PALM BEACH
 COUNTY AND MOST OF THE NOTE IS NOT LEGIBLE. PLEASE
 CORRECT THE JURISDICATION OF AUTHORITY AND MAKE SURE
 THE NOTE IS OF SUFFICIENT CLARITY TO INDICATE
 INFORMATION SUBMITTED. SECTION 106.1.1.
  
 32. SHT A700 THE FINAL NOTE IN THE NOTE SECTION (04)
 SHALL BE DELETED. PER FHA-98 DESIGN MANUAL, THE
 RESPONSIBILITY FOR COMPLYING WITH THE LAW RESTS WITH
 ANY AND ALL PERSONS INVOLVED IN THE DESIGN AND
 CONSTRUCTION OF COVERED MULTIFAMILY DWELLINGS. THIS
 DOES NOT INCLUDE LOCAL OR STATE GOVERNMENTS, AND TO TRY
 TO RELIEVE ONE SELF FROM LIBILITY WITH A NOTE WILL NOT
 BE APPROVED. PAGE 22 FHA-98 DESIGN MANUAL.
  
 33.SHT A805 DETAIL A INDICATES A TRENCH DRAIN. PLEASE
 INDICATE WHERE THIS CAN BE FOUND ON THE FLOOR PLAN.
 SECTION 106.1.1.
  
 34. SHT A806 THE SQUARE FOOTAGE FOR ALL EXTERIOR
 PLANTERS SHALL INDICATE 1/2 THE AREA OF ALL VERTICAL
 WALLS. IN THE CASE OF PLANTERS AGAINST THE BUILDING
 THIS WILL INCLUDE THE 1/2 THE AREA OF THE BUILDING UP
 TO THE PARAPETS OF THE ROOF. PLEASE SUBMIT THE
 CALCULATIONS FOR THESE PLANTER DRAINS PER TABLE
 1106.3.
  
 35. SHTS LP-1, LP-2, MP-1 & IR-1. THE LICENSE FOR THE
 LANDSCAPE ARCHITECT IS NULL & VOID AS OF 11-30-1995. --
 THE CERTIFICATE OF AUTHORIZATION NUMBER, (BUSINESS
 LICENSE), IS NOT ISSUED AS THE STATUS IS FOR AN
 APPLICANT.--THE ADDRESS FOR MAJESTIC VIEWS
 LANDSCAPE ARCHITECTS INC SHOWN ON THE TITLE BLOCK DOES
 NOT REFLECT THE ADDRESS OF RECORD ON THE FLORIDA STATE
 DBPR WEBSITE. (SEE ATTACHED SHEETS). THIS INFORMATION
 SHALL BE REQUIRED AND APPROVED PRIOR TO ISSUING THE
 PERMIT.
  
 36. SHT P-1A 4" 2050SF NOT APPROVED. MINIMUM 5"
 REQUIRED OR INDICATE SLOPE OF PIPE PER TABLE 1106.3.
  
 37. SHT P-1A 4" SECONDARY DRAIN BY THE FPL VAULT
 REQUIRED TO BE 5" MINIMUM OR INDICATE THE SLOPE OF PIPE
 PER TABLE 1106.3.
  
 38. SHT P-1A INDICATE THE SQUARE FOOTAGE BEING DRAIN
 FOR EACH SECONDARY ROOF DRAIN. TABLE 1106.3.
  
 39. SHT P-1A 4" DD 400SF NOT ADDED TO HORIZONTAL
 UNDERGROUND TOTAL SQUARE FOOTAGE.
  
 40. SHT P-1B PLAN INDICATED ON SHEET INDEX HAS NOT BEEN
 SUBMITTED. SUBMIT A 2ND FLOOR/ROOF PLAN FOR THE GARAGE.
 SHOW ALL ROOF DRAINS, SECONDARY ROOF DRAINS, WATER
 SUPPLY & BACKFLOW FOR THE WATERFALL ETC. SECTION
 106.1.2.
  
 41. SHT P-1C THE GENERATOR & GENERATOR FUEL INFORMATION
 IS FOR MECHANICAL PLAN REVIEW. PLEASE MOVE THE
 INFORMATION TO THE MECHANICAL SHEETS.
  
 42. SHT P-2 THE W/C & LAV BY COL. LINE H/6 DOES NOT
 CONNECT TO THE BRANCH LINE. PLEASE CLARIFY. SECTION
 106.1.1.
  
 43. SHT P-2 SHOWS 2 3" SPK DRAIN LINES CONNECTING TO
 THE STORM SYSTEM. THIS IS NOT APPROVED PER CITY CODE
 SECTION 90-203(A). CONNECT THE DRAIN LINES TO THE
 SANITARY SYSTEM.
  
 44. SHT P-2 RELIEF VENTS ARE REQUIRED FOR THE AAV'S
 SERVING THE FLOOR DRAINS IN THE PUMP ROOMS. SECTION
 917.3.2.
  
 45. SHT P-2 THE HOSE BIBB IN THE TRASH ROOM DOES NOT
 CONNECT TO THE WATER SUPPLY MAIN. PLEASE CLARIFY.
 SECTION 106.1.1.
  
 46. SHT P-2 THE FITTING CONNECTING THE HORIZONTAL
 BRANCH LINE FOR THE RWL IN "CART" ROOM GUIDES THE STORM
 WATER AGAINST THE FLOW. SECTIONS 706.3 & 1101.6.
  
 47. SHT P-3 SHOW THE PIPING TO EACH FIXTURE IN EACH
 UNIT AT THE BASE OF EACH STACK ON THE FLOOR PLAN.
 SECTION 106.1.2.
  
 48. SHT P-3 SHOWS 4 PLANTER DRAINS BUT ONLY SHOWS
 PIPING AND SQUARE FOOTAGE TO 2 PLANTER DRAINS. PLEASE
 SHOW THE PIPING & SF TO ALL PLANTER DRAINS. SECTION
 1101.2.
  
 49. SHT P-3 RWL SHOWS 1730SF, BUT SAME RWL IS INDICATED
 AS DRAINING 2010SF ON THE LEVELS ABOVE AND BELOW.
 PLEASE CLARIFY. SECTION 106.1.1.
  
 50. SHTS P-4 & P-5 THE RISER DESIGNATION FORRISER
 S/14 IS NOT INDICATED. PLEASE SHOW RISER DESIGNATION.
 SECTION 106.1.2.
  
 51. SHT P-5 THE TYPICAL FLOOR PLAN (4-14) SHOWS AREAS 1
 & 2 WITH ROOF DRAINS. IS THIS TYPICAL FOR ALL FLOORS
 (4-14)? PLEASE CLARIFY. SECTION 106.1.1.
  
 52. SHT P-7 SINKS FOR 3 UNITS ARE NOT SHOWN DRAINING TO
 ANY RISER DIAGRAMS. PLEASE INDICATE WHERE THESE SINKS
 ARE DRAINING TO AND SHOW THE CONNECTION ON THE RISER
 DIAGRAM WHEN INDICATING WHERE THE SINKS ARE DRAINING
 TO. SECTION 106.1.1. INDICATE TOTAL FIXTURE UNITS FOR
 STACK WHEN ADDING THE SINK. TABLE710.1(2).
  
 53. SHT P-7 THE COOLING TOWER OVERLFOW SHALL BE
 INDIRECTLY DRAINED TO THE STORM SYSTEM, AND THE COOLING
 TOWER DRAIN SHALL BE INDIRECTLY DRAINED TO THE SANITARY
 SYSTEM.PLEASE INDICATE ON THE PLANS AND SHOW ON THE
 RISER DIAGRAMS. SECTION 106.1.1.
  
 54. SHT P-7 THE VENT THRU THE ROOF FOR STACK S-7 IS NOT
 INDICATED ON THE ROOF PLAN. PLEASE SHOW VTR ON PLANS.
 SECTION 903.3.
  
 55. SHT P-8 UNIT "A" WATER RISER DIAGRAM. A FULL OPEN
 VALVE IS REQUIRED ON THE SUPPLY LINE TO THE WATER
 HEATER. SECTION 606.1(7).
  
 56. SHT P-8 UNIT "B" WATER RISER DIAGRAM DOES NOT
 REFLECT THE FLOOR PLAN AT THE REF. & AT THE PDR ROOM.
 --THE SHOWER IS INDICATED AS A TUB IN THE M/B BY THE
 W/C.-- THE WATER SUPPLY TO THE REF. IS NOT INDICATED
 ON THE FLOOR PLAN.PLEASE CORRECT THE WATER RISER
 DIAGRAM & FLOOR PLAN. SECTION 106.1.1.
  
 57. SHT P-9 UNIT "D"FLOOR PLAN DOES NOT SHOW THE
 WATER SUPPLY CONNECTION FROM THE REF. TO THE WATER
 MAIN.--THE WATER RISER DIAGRAM DOES NOT REFLECT
 THE FLOOR PLANAT THE REF. PLEASE SHOW PIPING ON THE
 FLOOR PLAN AND SHOW PIPING ON THE RISER DIAGRAM THAT
 REFLECT THE FLOOR PLAN. SECTION 106.1.1.
  
 58. SHT P-9 UNIT "C"THE WATER RISER DIAGRAM DOES NOT
 REFLECT THE FLOOR PLAN AT THE SINK, D/W, W/M & AT THE
 CONNECTION FROM THE W/H TO THE WATER MAIN OVERHEAD.
 PLEASE CORRELATE INFORMATION. SECTION 106.1.1.
  
 59. SHT P-10 PH UNIT "A" FLOOR PLAN. INDICATE WHERE THE
 REF. WATER SUPPLY CONNECTS TO THE WATER MAIN. SECTION
 106.1.1.--SUBMIT A UNIT "A" WATER RISER DIAGRAM
 THAT REFLECTS THE FLOOR PLAN. SECTION
 106.3.5.1.3(3)(10)(13).
  
 60. SHT P-11 PH UNIT "B" FLOOR PLAN. INDICATE WHERE THE
 REF. WATER SUPPLY CONNECTS TO THE WATER MAIN. SECTION
 106.1.1.--SUBMIT A UNIT "A" WATER RISER DIAGRAM
 THAT REFLECTS THE FLOOR PLAN. SECTION
 106.3.5.1.3(3)(10)(13).
  
 61. SHT P-12 PH UNIT "C" & PH UNIT "B" SUBMIT WATER
 RISER DIAGRAMS. SECTION 106.3.5.1.3(3)(10)(13).
  
 62. SHT P-13 RISERS 1 & 18 DO NOT REFLECT THE FLOOR
 PLAN. 1ST & 2ND FLOORS INDICATE SHOWERS, BUT THE FLOOR
 PLAN INDICATES TUBS.-- THE PIPING FOR THE SECOND
 FLOOR FIXTURES IS NOT SHOWN ON THE FLOOR PLAN. PLEASE
 CORRELATE INFORMATION. SECTION 106.1.1.
  
 63. SHT P-13 RISERS 2, 10, 14, 20 & 27 DO NOT REFLECT
 THE FLOOR PLAN. ALL RISERS SHOW OFFSETS, BUT OFFSETS
 FOR RISERS 2 & 20 ARE DIFFERENT FROM THE OTHER RISERS.
 PLEASE CLARIFY & CORRELATE THE INFORMATION FROM THE
 RISERS & FLOOR PLANS. SECTION 106.1.1.
  
 64. SHT P-13 RISERS 3 & 21 THE PIPING FOR THE SECOND
 FLOOR FIXTURES IS NOT SHOWN ON THE FLOOR PLAN.-- THE
 VENT DOES NOT SHOW THE OFFSET INDICATED ON THE FLOOR
 PLAN. SECTION 106.1.1.
  
 65. SHT P-13 RISERS 4 & 19 THE PIPING FOR THE SECOND
 FLOOR FIXTURES IS NOT SHOWN ON THE FLOOR PLAN.--
 RECHECK THE TOTAL FU COUNT. ADDS UP TO 110FU.-- SHOW
 THE SIZE OF THE PIPING TO THE W/M'S AT THE 2ND & 3RD
 FLOORS. SECTIONS 106.1.1 & 406.3 & TABLE 709.1.
  
 66. SHT P-13 RISERS 5 & 22 THE PIPING FOR THE SECOND
 FLOOR FIXTURES IS NOT SHOWN ON THE FLOOR PLAN. SECTION
 106.1.1.
  
 67. SHT P-13 RISERS 6 & 23 SHOW ALL PIPE SIZES FROM THE
 STACK THRU TO THE LAVS.--RECHECK THE TOTAL FU
 COUNT. ADDS UP TO 112FU. TABLES 709.1 & 710.1(2).
  
 68. SHT P-13 RISERS 8 & 25THE PIPING FOR THE SECOND
 FLOOR FIXTURES IS NOT SHOWN ON THE FLOOR PLAN.-- VENT
 OFFSETS ARE NOT SHOWN. PLEASE CORRELATE. SECTION
 106.1.1.
  
 69. SHT P-13 RISER 9 THE PIPING FOR THE SECOND FLOOR
 FIXTURES IS NOT SHOWN ON THE FLOOR PLAN.--VENT
 OFFSET IS NOT SHOWN. PLEASE CORRELATE. SECTION
 106.1.1.
  
 70. SHT P-13 RISER 11 THE PIPING FOR THE SECOND FLOOR
 FIXTURES IS NOT SHOWN ON THE FLOOR PLAN. SECTION
 106.1.1.
  
 71. SHT P-13 RISER 12 THE PIPING FOR THE SECOND FLOOR
 FIXTURES IS NOT SHOWN ON THE FLOOR PLAN.--SHOW ALL
 PIPE SIZES ON RISER. SECTION 106.1.1 & TABLE 710.1(2).
  
 72. SHT P-13 RISER 13 THE PIPING FOR THE SECOND FLOOR
 FIXTURES IS NOT SHOWN ON THE FLOOR PLAN. SECTION
 106.1.1.
  
 73. SHT P-13 RISER 15 THE PIPING FOR THE SECOND FLOOR
 FIXTURES IS NOT SHOWN ON THE FLOOR PLAN.--VENT
 OFFSET IS NOT SHOWN. SHOW THE CONNECTION FROM RISER
 S/14. SECTION 106.1.1.
  
 74. SHT P-13 RISER 16 THE PIPING FOR THE SECOND FLOOR
 FIXTURES IS NOT SHOWN ON THE FLOOR PLAN.--VENT
 OFFSET IS NOT SHOWN.--SINK CONNECTION FROM THE
 ROOF NOT SHOWN.--RECHECK THE TOTAL FIXTURE COUNT.
 ADDS UP TO 56. SECTION 106.1.1 & TABLE 710.1(2).
  
 75. SHT P-13 RISER 17 SHOW ALL PIPE SIZES.--THE
 VENT OFFSET IS NOT SHOWN.--RECHECK THE TOTAL
 FIXTURE COUNT. ADDS UP TO 98. SECTION 106.1.1 & TABLE
 710.1(2).
  
 76. SHT P-14 BACKFLOW PROTECTION IS REQUIRED FOR THE
 SUPPLY LINE TO THE TRASH CHUTE FLUSH RING. PLEASE
 INDICATE THE METHOD TO BE USED. (AN N-36 VACUUM BREAKER
 AT THE TOP OF THE SUPPLY LINE IS AN ACCEPTABLE METHOD).
 SECTION 608.--THE PAN DRAIN LINE IS MISLABELED AS
 "CD" RISER DIAGRAM. SECTION 106.1.1.
  
 77. SHT P-15GAS PIPING RISER DIAGRAM. PLEASE SUBMIT
 THE CALCULATION FOR EQUATION 4-2.--SUBMIT
 MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
  
 78. SHT P-15HORIZONTAL WATER ISOMETRIC RISER DIAGRAM
 DOES NOT REFLECT THE FLOOR PLAN. OFFSETS IN 1" WATER
 MAIN PRIOR TO THE W/H AND TOILET ROOMS IS NOT SHOWN. --
 NO TRAPPED SECTIONS ALLOWED IN THE T/P DISCHARGE LINE.
 --MANUF. SPECIFICATION SHEET REQUIRED FOR THE IN-LINE
 EXPANSION TANK. SHOW MODEL NUMBER. SECTIONS 106.1.1,
 303.2, 303.4 & 504.6.1.
  
 79. SUBMIT A WATER RISER DIAGRAM FOR THE COOLING TOWER
 WATER. SECTION 106.3.5.1.3(3)(10)(13).
  
 80. SHT P-16 HORIZONTAL SANITARY ISOMETRIC DIAGRAM.
 RECHECK THE DFU'S FOR THE RISERS AND TOTAL AS IT
 ACCUMULATES IN THE SYSTEM.--PIPING DOES NOT REFLECT
 THE FLOOR PLAN AT THE W/C'S, LAV ETC BY THE SHOWERS &
 RISER 27.--THE NOTE FOR REVENT INDICATES CONNTECION
 TO RISER #25. RISER #25 DOES NOT SHOW THE VENT
 CONECTION.--RELIEF VENTS ARE REQUIRED FOR THE AAV'S
 FOR THE FLOOR DRAINS IN THE PUMP ROOMS.TABLE
 710.1(2), SECTIONS 106.1.1 & 917.3.2.
  
 81. SHT P-17 RISER DOES NOT REFLECT THE FLOOR PLAN. THE
 PIPING FOR THE 4" GD'S, 3" SPA DRAINS, PIPING AROUND 6"
 3106SF, 3" RWL BRANCH LINE ARE NOT SHOWN.SECTION
 106.1.1.
  
 82. SHT P-17 THE SIZE OF THE DRAINAGE PIPE SHALL NOT BE
 REDUCED IN SIZE IN THE DIRECTION OF FLOW. (6" RWL
 REDUCES TO 4"). SECTION 704.2.
  
 83. SHT P-17 OFFSETS ARE NOT SHOWN ON THE RISERS TO
 REFLECT THOSE SHOWN ON THE FLOOR PLAN FOR THREE RISERS.
 CORRELATE INFORMATION . SECTION 106.1.1.
  
 84. SHT P-17 4" RWL 1480SF IS INDICATED AS 1340SF AT
 THE ROOF DRAIN. PLEASE CORRELATE INFORMATION. SECTION
 106.1.1.
  
 85. SHT P-18 HORIZONTAL CONDENSATE ISOMETRIC DIAGRAM.
 SHOW ALL PIPE SIZES ON RISER DIAGRAM. SECTION 106.1.1.
  
 86. SHT P-19. GARAGE ROOF STORM DRAINAGE ISOMETRIC
 DIAGRAM DOES NOT REFLECT THE FLOOR PLAN AT DD 400SF. --
 SHOW THE PIPING & PIPE SIZE OF PIPE BETWEEN THE
 STRUCTURES.--2 SECONDARY DRAIN SHOWN AS 4" ARE
 REQUIRED TO BE A MINIMUM OF 5". INDICATE PIPE SIZE OR
 SLOPE OF PIPE. TABLE 1106.3 & SECTION 106.1.1.
  
 87. SHT P-20 FIXTURE CONNECTION SCHEDULE. INDICATE THE
 HOT & COLD WATER CONNECTION SIZES TO REFLECT THOSE
 SHOWN ON THE WATER RISER DIAGRAM FOR THE WATER HEATER.
 SECTION 106.1.1 & TABLE 604.5.
  
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUM-
 BER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICA
 TION PAGE WHERE THE CHANGES CAN BE FOUND,
 AS WELL AS THE RETURN OF THE RED LINED SET OF PLANS
 FROM THE FIRST REVIEW, WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]
  
  