| Plan Review Notes For Permit 07030437 |
| Permit Number |
07030437 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2007-04-03 11:16:16 | *** DENIED *** | | | 1) ENERGY CALCULATIONS NEED TO BE ON FORM600B-04R (OR | | | 600A-04R), SEE 2004 FBC 13-600.3.B (12-8-06 REVISION). | | | | | | 2)ENERGY CALCULATIONS NEED TO BE SIGNED BY | | | OWNER/AGENT ALSO, PER 2004 FBC 13-600.3.ABC.2. | | | | | | 3) PLEASE SUBMITCOOLING LOAD CALCULATIONS, PER 2004 | | | FBC 13-607.1.ABC.1 . | | | | | | 4) THE A/C EQUIPMENT SCHEDULE ON THE MECHANICAL PLANS | | | PAGE 4 OF 4 NEEDS TO SHOW THE SENSIBLE BTU'S. ALSO. | | | | | | 5) MOST OF THE SUPPLY AIR DUCTS ARE NOT SIZED, SEE THE | | | YELLOW HIGH LIGHTS ON THE MECHANICAL PLANS, PLEASE | | | CORRECT. | | | | | | 6) THE RETURN AIR TRANSFER DUCTS FROM BEDROOM #1 TO | | | BEDROOM #2 AND FROM BEDROOM #2 TO BEDROOM #3 NEEDS TO | | | BE SIZED. | | | | | | 7) THE 9" RETURN AIR TRANSFER DUCT FROM BEDROOM #3 TO | | | THE HALLWAY MAY BE TO SMALL AS IT IS RETURNING AIR FROM | | | THE THREE BEDROOMS, SEE 2004 FBC/R M1602.4. | | | | | | ** 2004 FBC/R M1602.4 BALANCED RETURN AIR MAY BE | | | ACHIEVED BY. | | | (A)TRANSFER DUCTS MAY ACHIEVE THIS BY INCREASING THE | | | RETURN TRANSFER ONE AND ONE HALF TIMES THE CROSS | | | SECTIONAL AREA (SQUARE INCHES) OF THE SUPPLY DUCT | | | ENTERING THE ROOM OR SPACE IT'S SERVING AND THE DOOR | | | HAVING AT LEAST AN UNRESTRICTED 1 INCHUNDERCUT TO | | | ACHIEVE PROPER RETURN AIR BALANCE. | | | | | | MECHANICAL PLAN REVIEW BY; | | | TOM GORDON (561) 805-6729. |
|