2007-03-24 15:37:23------------------------DENIED-------------------------
 --
  
 FBC 2004 W/ 2006 REVISIONS
 FBC,M 2004 W/ 2006 REVISIONS
 FBC 2004 CHAPTER 1 AS AMENDED BY THE CITY OF WEST PALM
 BEACH
  
 1. M0.1 MECHANICAL NOTES : PLEASE REFERENCE FBC 2004 W/
 2006 REVISIONS. ALSO, PLEASE UPDATE ALL REFERENCED
 STANDARDS TO THOSE LISTED IN FBC 2004.
  
 2. M0.1 MECHANICAL NOTE #5: WHAT IS THE MEANS TO BE
 USED FOR CERTIFICATION OF EXISTING DUCT MOUNTED SMOKE
 DETECTORS?
  
 3. M4.1 PLEASE SEE MANUFACTURER'S INSTALLATION
 INSTRUCTIONS FOR MINIMUM REQUIREMENTS FOR SERVICE
 ACCESS PER FBC.M 304.1,304.2. EXAMPLE: AHU 3, AHU 12
 BOTH REQUIRE MIN. 71" ON COIL CONNECTION SIDE OF UNIT
 AND 24" MIN. ON OPPOSITE SIDE. PLAN SHOWS APPROX. 48"
 ON COIL SIDE AND 12" ON OPPOSITE SIDE FOR AHU 12. THIS
 UNIT, ONCE IN PLACE, WOULD NOT BE SERVICABLE. MINIMUM
 SERVICE CLEARANCE FROM ELEMENTS OF PERMANENT
 CONSTRUCTION, INCLUDING OTHER INSTALLED EQUIPMENT, IS
 REQUIRED PER FBC,M 306.1.
  
 4. M2.2 GENERAL NOTE #5: ELIMINATING THE OPENING USED
 FOR INSTALLATION OF EQUIPMENT WITH ELEMENTS OF
 PERMANENT CONSTRUCTION, IF IT IS THE ONLY MEANS OF
 ACCESS FOR REPLACEMENT, IS NOT PERMITTED PER FBC,M
 306.1.
  
 5. M2.2 AHU 11: CHECK FOR CLEARANCE FOR SERVICE AND
 MAINTENANCE. SEE COMMENT #3.
  
 6. M4.1 VAV 2 DOES NOT APPEAR TO HAVE THE MINIMUM
 REQUIRED CLEARANCE.
  
 7. M6.1 FIRE DAMPER DETAIL: (A) FIRE DAMPERS TO BE
 INSTALLED PER THEIR LISTING AND MANUFACTURER'S
 INSTALLATION INSTRUCTIONS FBC,M 607.2.(B)FIRE DAMPER
 ACTUATING DEVICE OPERATING TEMPERATURE TO BE
 APPROXIMATELY 50 DEG.F ABOVE THE NORMAL TEMPERATURE
 WITHIN THE DUCT SYSTEM, BUT NOT LESS THAN 160 DEG.F PER
 FBC,M 607.3.1.1. WHAT WILL BE THE NORMAL TEMPERATURE BE
 WITHIN THE DUCT SYSTEM?
  
 8. M6.1. PLEASE PROVIDE DETAILED DRAWINGS FROM A
 STRUCTURAL ENGINEER SHOWING WIND LOAD CALCULATIONS,
 VERIFYING EQUIPMENT AND CURB CONNECTIONS TO BE IN
 COMPLIANCE WITH FBC CH 16. ALSO, SHOW STRUCTURAL
 ELEMENTS INVOLVED IN CREATING NEW PENETRATIONS/LOAD
 BEARING FOR NEW EQUIPMENT ON ROOF FOR BUILDING PLAN
 REVIEW.
  
 9. PLEASE PROVIDE MANUFACTURER'S SUBMITTAL DATA FOR
 OARTU-1. A SEPARATE GAS PERMIT WILL BE REQUIRED FOR
 OARTU-1 GAS PIPING.
  
 10. PLEASE SHOW MEANS OF AUXILIARY OR SECONDARY DRAIN
 PROTECTION FOR ALL NEW AHUS AND OARTU-1 PER FBC,M
 307.2.3.
  
 PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS.
  
 REVIEWED BY: