| Plan Review Notes For Permit 07030154 |
| Permit Number |
07030154 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2007-03-19 14:25:26 | *** DENIED *** | | | 1) IF SORIN POPESCU ARCHITECTURAL SERVICES IS AN | | | ARCHITECTURAL FIRM THEN THEY MUST SIGN AND SEAL THE | | | MECHANICAL PLANS AS THEIR INFORMATION IS IN THE TITLE | | | BLOCK, SEE FAC 61G1-16.003. | | | | | | 2)MECHANICAL PLANS HAVE TO MUCH FLOOR PLAN DETAIL ON | | | THEM AND ARE DIFFICULT TO READ. CONSTRUCTION DOCUMENTS | | | SHALL BE OF SUFFICIENT CLARITY. PER 2004 FBC 106.1.1. | | | | | | 3) COOLING LOAD CALCULATIONS FOR FIRST FLOOR ARE | | | INCLUDING THE EXISTING LIVING AREA FOR A/C #1, BUT THE | | | MECHANICAL PLANS ARE NOT, PLEASE CORRECT LOAD CAL'S OR | | | MECHANICAL PLANS. | | | | | | 4) MECHANICAL PLANS EQUIPMENT LISTING ONLY SHOWS ONE | | | A/C SYSTEM, PLEASE CORRECT. | | | | | | 5) PLEASE SHOW SENSIBLE BTU'S, MODEL NUMBERS, AND OTHER | | | PERTINENT INFORMATION ON MECHANICAL PLANS. | | | | | | 6)ENERGY CALCULATIONS NEED TO BE SIGNED BY | | | OWNER/AGENT ALSO, PER 2004 FBC 13-600.3.ABC.2. | | | | | | MECHANICAL PLAN REVIEW BY; | | | TOM GORDON (561) 805-6729. |
|