2007-04-04 07:54:14-----------------DENIED--------------------
  
 FBC 2004 CODE FAMILY W/2006 REVISIONS
 FBC CHAPETER 1 AS AMENDED AND ADOPTED BY THE CITY OF
 WEST PALM BEACH
 ASHRAE 15-04
 ASHRAE 62-04
 NFPA 90A-02
 SMACNA-95
  
  
 1. M1.01: 16X10 INTAKE LOUVER IS PENETRATING A FIRE
 BARRIER (AS INDICATED ON A2.33) BETWEEN VESTIBULE AND
 COMMERCIAL SPACE #5. PLEASE SHOW HOW THIS OPENING IS TO
 BE PROTECTED PER FBC,M 607.5.2.
  
 2. M1.01: WHERE THE INSTALLATION OF A FIRE DAMPER WILL
 INTERFERE WITH THE OPERATION OF A SMOKE CONTROL SYSTEM,
 APPROVED ALTERNATE PROTECTION SHALL BE USED PER FBC,M
 607.2.1.FIRE DAMPERS ARE SHOWN AT THE BOTTOM OF SER-2
 SHAFT AND AT ELEVATOR FOYER PENETRATION. RISER DIAGRAM
 ON M4.01 CALLS FOR COMBO FIRE/SMOKE DAMPER AT SHAFT
 PENETRATION. COMBINATION FIRE/SMOKE DAMPERS MAY ALSO BE
 USED AT TRASH ROOM AND ELEVATOR FOYER PENETRATIONS AS
 AN APPROVED ALTERNATIVE PROTECTION.
  
 3. M1.01: WHAT IS THE SOURCE OF THE 2850 CFM OF MAKE-UP
 AIR FOR THE SMOKE EXHAUST IN THE ELEVATOR FOYER AND
 LOBBY? NONE IS SHOWN ON PLANS. PLEASE CLARIFY PER FBC
 106.1.1.
  
 4. M1.01 AND M1.02: THE 22X14 DUCT FROM AHU 4
 PENETRATING THE 2ND FLOOR SLAB IS AN UNPROTECTED
 OPNEING IN A FIRE BARRIER. PLEASE SHOW HOW THIS OPENING
 IS TO BE PROTECTED PER FBC,M 607.5.2.
  
 5. M1.01/M1.02: AHU 4 IS SHOWN ON EQUIPMENT SCHEDULE
 (M5.01) TO PRODUCE 1600 CFM. DUCT SYSTEM DESIGN AS
 DRAWN SHOWS 2200 CFM AT REGISTERS. PLEASE CLARIFY PER
 FBC 106.1.1.
  
 6. M1.01 THERE ARE UNPROTECTED OPENINGS IN FIRE
 BARRIERS AT SGF-1 AND DPF-1 (BASED ON A2.33). PLEASE
 SHOW HOW THESE OPENINGS WILL BE PROTECTED PER FBC,M
 607.5.2.
  
 7. M1.01 GENERATOR ROOM: EXTERIOR WALL (WEST) IS SHOWN
 ON A2.32 AS TWO-HOUR RATED. LS-1 SHOWS THIS WALL AS
 UNRATED. WHICH OF THESE CONDITIONS IS INTENDED, WITH
 CONSIDERATION FOR THE EXIT DISCHARGE PATH TRAVELING
 NORTH? IF WALL IS TO BE RATED, OPENING PROTECTION WILL
 BE REQUIRED AT TE RADIATOR EXHAUST AND INTAKE LOUVERS
 PER FBC,M 607.5.2. THIS CONDITION MAY IMPACT GEF 1 & 2
 WHICH ARE TO THE SOUTH IN THE SAME EXTERIOR WALL.
  
 8. M1.01 GENERATOR EXHAUST: PLEASE VERIFY DISCHARGE
 LOCATION TO BE IN COMPLIANCE WITH FBC,M 401.5.2.
  
 9. M1.02: WHAT IS THE SOURCE OF THE 300 CFM OF MAKE-UP
 AIR FOR SMOKE EXHAUST IN THE ELEVATOR FOYER?
  
 10. M1.02: THERE ARE UNPROTECTED OPENINGS IN FIRE
 BARRIERS IN TENANT STORAGE ROOMS, GEF 1&2 AND THE FIRE
 PUMP ROOM (BASED ON A2.36 & A2.37). PLEASE SHOW
 COMPLIANCE WITH FBC,M 607.5.2.
  
 11. M1.01: WHAT MEANS IS TO BE USED FOR VENTILATION OF
 THE TRASH ROOM?
  
 12. M1.02 TENANT STORAGE ROOMS: WHAT ARE THE SIZES OF
 O.A. LOUVERS AND CONNECTING DUCTS? PLEASE SHOW MEANS OF
 TYING O.A. DUCTS TO AHUS FOR MECHANICAL VENTILATION PER
 T403.3 AND 404.
  
 13. M1.01,M1.02,M4.01: SEF-2 RISER DIAGRAM SHOWS 1000
 CFM AT FIRST FLOOR AND MEZZANINE LEVELS. FLOOR PLAN
 CALLS FOR 3500 CFM ON 1ST FLOOR AND 350 CFM ON
 MEZZANINE LEVEL. PLEASE CLARIFY.ALSO, FEF-2 ON
 SCHEDULE AND RISER DIAGRAM IS RATED FOR 3200 CFM. HOW
 WILL IT MOVE 3500 CFM ON 1ST FLOOR?
  
 14. M1.02 10X6 SMOKE EXHAUST: PLEASE SEE RELATED
 COMMENT #2.
  
 15. M1.02 POOL EQUIPMENT ROOM: COMBUSTION AIR
 CALCULATIONS FOR LOUVER SIZING IS BASED ON 400,000
 BTU/H BUT CAPACITY IS LISTED ON PLAN AS 675,000 BTU/H.
 PLEASE CLARIFY PER FBC 106.1.1.
  
 16. M1.02 POOL EQUIPMENT ROOM: MECHANICAL EXHAUST SHALL
 BE DISCHARGED OUTDOORS AT A POINT WHERE IT WILL NOT
 CAUSE A NUISANCE AND FROM WHICH IT CAN NOT AGAIN BE
 READILY DRAWN IN BY A VENTILATING SYSTEM. AN ENCLOSED
 PARKING GARAGE IS NOT 'OUTDOORS.'
  
 17. M1.02: WHAT IS THE MEANS OF VENTILATION FOR THE
 TENANT STORAGE SPACES IN THE EAST END OF PARKING
 GARAGE?
  
 18. M1.03 RECREATION ROOM: AHU #9 ON PLANS SHOWS 1200
 CFM OF SUPPLY. SCHEDULE AND SIZE OF EQUIPMENT (M5.01)
 INDICATES 1000 CFM. PLEASE CLARIFY.
  
 19. M5.01 NOTE 11:PLEASE PROVIDE MANUFACTURER'S
 SUBMITTAL DATA AND INSTALLATION INSTRUCTIONS SHOWING
 THE MAXIMUM ALLOWABLE VIRTICAL DISTANCE BETWEEN AHUS
 AND REMOTE CONDENSING UNITS. FBC,M 304.1.
  
 20. M1.03/M1.04 PLEASE IDENTIFY OUTSIDE AIR RISERS AS
 THEY RELATE TO THEIR LABELS ON M4.02 (OAR1 & OAR2)
  
 21. M1.03/M1.04 THERE ARE SEVERAL UNPROTECTED OUTSIDE
 AIR DUCT PENETRATIONS THROUGH RATED FIRE BARRIERS FROM
 CORRIDOR INTO A/C CLOSETS. PLEASE SHOW HOW THESE
 OPENINGS ARE TO BE PROTECTED PER FBC,M 607.5.2.
  
 22. M1.03: PLAN SHOWS COMBINED 2230 CFM OUTSIDE AIR
 FROM BOTH RISERS. RISER DIAGRAM SHOWS 2600 CFM
 COMBINED. PLEASE CLARIFY.
  
 23. M1.05 PLEASE SHOW SIZE OF LOUVER AND OUTSIDE AIR
 DUCT IN BUILDING MAINTENANCE ROOM FOR AHU #10.
  
 24. GENERAL NOTE: PLEASE SHOW TYPE OF AIR DISTRIBUTION
 TO BE USED ON ALL COMMON AREA AHU'S PER FBC 106.1.1.
  
 25. M2.01-M2.04: PLEASE SHOW HOW THE REQUIREMENTS OF
 FBC,M 504.6.1 WILL BE MET. MOST, IF NOT ALL DRYER
 EXHAUST DUCTS EXCEED THE MAXIMUM ALLOWED LENGTH.
  
 26. M2.01: BEDROOM 2 RETURN AIR TRANSFER DUCT IS NOT
 DESIGNED TO MEET THE BALANCED R/A EXCEPTIONS OF FBC,M
 601.4. IF THE TRANSFER DOES NOT MEET THE EXCEPTIONS, A
 FIELD TEST WILL BE REQUIRED AT FINAL INSPECTION TO
 DEMONSTRATE A PRESSURE DIFFERENTIAL OF 0.01" WC OR LESS
 AS REQUIRED BY THIS SECTION.
  
 27. M2.01-M2.04 AND M5.01: UNIT 3 HAS ONLY ONE DUCT
 DESIGN SHOWN, BUT THERE ARE TWO DIFFERENT UNIT 3'S ON
 SPLIT SYSTEM SCHEDULE, EACH WITH DIFFERENT SIZE
 EQUIPMENT AND CFM REQUIREMENTS. PLEASE SHOW LAYOUTS FOR
 BOTH UNIT 3N AND #S WITH THEIR CORRESPONDING EQUIPMENT
 DESIGNATIONS AND DUCT DESIGNS WITH CFM'S MATCHING THE
 SCHEDULE. ALSO, PLEASE SEE RELATED COMMENT #30. FBC
 106.3.5.1.4
  
 28. M2.01 UNIT 3: 4" ROUNDFLEX IN LAUNDRY ROOM IS
 MISSING GRILL SIZE AND CFM DESIGNATION. FBC
 106.3.5.1.4
  
 29. M2.03 UNIT 12: ROUND FLEX DUCT DROP IN GUEST
 BATHROOM IS MISSING DUCT SIZE, GRILL SIZE AND CFM
 DESIGNATION. FBC 106.3.5.1.4
  
 30. M2.01-M2.04: THE FOLLOWING UNITS HAVE DUCT DESIGNS
 AND CFM DESIGNATIONS WHICH DO NOT CORRESPOND WITH
 EQUIPMENT DESIGN CFM AS STATED ON SPLIT SYSTEM SCHEDULE
 (M5.01):
 UNIT 3 (SEE CMMENT #27), WITH 1360 CFM ON FLOOR PLAN
 AND EITHER 625 OR 850 ON SCHEDULE.
 UNIT 6, WITH 1080 CFM ON FLOOR PLAN AND 850 ON
 SCHEDULE.
 UNIT 8, WITH 1040 CFM ON FLOOR PLAN, 945 ON SCHEDULE.
 UNITS 9 AND L9, WITH 720 CFM ON FLOOR PLAN AND 625 ON
 SCHEDULE.
 UNIT 11, WITH 1000 CFM ON FLOOR PLAN AND 815 ON
 SCHEDULE.
 UNIT 12, WITH 790 CFM ON FLOOR PLAN AND 625 ON
 SCHEDULE.
 PLEASE CORRECT EITHER THE DUCT DESIGN OR SCHEDULE AS
 NEEDED FOR PROPER DESIGN. PLEASE ENSURE ENERGY
 CALCULATIONS ARE ADJUSTED AS NEEDED TO REFLECT ANY
 CHANGES MADE TO COMPLY WITH THIS REVIEW COMMENT.
  
 31. M4.02: I AM UNABLE TO LOCATE SUFFICIENT DETAIL IN
 ARCHITECTURAL OR STRUCTURAL PLANS TO DETERMINE CLEAR
 OPENINGS IN SHAFTS FOR OAR 1 &2. PLEASE PROVIDE OR HELP
 ME LOCATE THIS INFORMATION TO ENSURE ADEQUATE SPACE FOR
 OA DUCT WITH INSULATION, ESPECIALLY ON UPPER FLOORS
 WHERE DUCT+INSULATION DIMENSIONS WILL BE 48X26.
  
 32. M5.01: COMMON AREA UNITS SCHEDULE: AHU-11 DOES NOT
 HAVE A CORRESPONDING CONDENSING UNIT. WHAT IS THE AREA
 SERVED BY THIS EQUIPMENT?
  
 33. M5.01 AHU 4,5 AND 10 ALL SHOW SAME MODEL # BUT HAVE
 DIFFERING CFM DESIGNATIONS, CONDENSERS AND ELECTRICAL
 RATINGS. ALSO, AHU-10 IS PAIRED ON SCHEDULE WITH CU-5.
 PLEASE CLARIFY, ENSURING THAT EQUIPMENT CORRESPONDS
 WITH THE AREA BEING SERVED AND DESIGN REQUIREMENTS. FBC
 106.1.1.
  
 34. M5.02 O.A. CALCULATIONS NOTES 1 &2: PLEASE
 REFERENCE ASHRA 62-04 AND VERIFY COMPLIANCE WITH THE
 CURRENT STANDARD. ASHRAE 62-04 STANDARD WAS ADOPTED AS
 PART OF THE 2006 REVISIONS TO THE FBC 2004.
  
 35. M6.01 FIRE DAMPER DETAIL: FIRE DAMPERS, SMOKE
 DAMPERS AND COMBINATION FIRE/SMOKE DAMPERS ARE TO BE
 INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS AND THEIR LISTING PER FBC,M
 607.2. PLEASE PROVIDE MANUFACTURER'S INSTRUCTIONS AND
 REMOVE ANY PORTION OF FIRE DAMPER DETAILS WHICH
 CONFLICT WITH SAME.
  
 36. M6.01 EXTERIOR WALL CAP DETAIL: IS IT THE INTENTION
 OF THIS DETAIL TO HAVE AN INLINE BACKDRAFT DAMPER AND A
 BACKDRAFT DAMPER IN THE WALL CAP? AN INLINE DAMPER AS
 WELL AS AN ACCESS PANEL IN THE DRYER EXHAUST DUCT IS
 PROHIBITED PER FBC,M 504.6 AS A SMOOTH INTERIOR SURFACE
 IS REQUIRED. PLEASE CLARIFY THE INTENT OF THIS DETAIL.
  
 37. M6.01 VIBRATION CURB DETAIL: OUTDOOR EQUIPMENT IS
 TO BE INSTALLED TO MEET WIND LOAD REQUIREMNTS PER FBC,M
 301.13. PROVIDE SUFFICIENT STRUCTURAL DETAILS WITH WIND
 LOAD CALCULATIONS FOR A BUILDING PLAN REVIEW TO
 DETERMINE COMPLIANCE WITH FBC CH 16.
  
 38. M6.01 TYPICAL VERTICAL A/C UNIT DIMENSIONAL DETAIL:
 PLEASE SHOW HOW REFRIGERANT PIPING WILL MEET THE
 REQUIREMENTS OF ASHRAE 15-810.3
  
 39. M6.02 DWELLING UNIT EXHAUST FAN DETAIL: EXHAUST
 DUCTS UNDER POSITIVE PRESSURE SHALL NOT PASS THROUGH A
 PLENUM PER FBC,M 601.3.
  
 40. M6.02 DUCT AND COONDENSING UNIT ROOF DETAIL: SEE
 COMMENT #37 REGARDING WIND LOADS AND OUTDOOR
 EQUIPMENT.
  
 41. M6.02 FIRESTOP DETAIL: HOW WILL THESE TWO SYSTEMS
 BE USED IN THIS APPLICATION GIVEN THE MAXIMUM ANNULAR
 SPACE ALLOWED IN THE FIRST DETAIL? HOW WILL THE 2ND
 DETAIL APPLY WHEN IT DOES NOT ALLOW FOR INSULATED PIPE
 AND ALLOWS ON 3 PIPES PER FIRE BARRIER OPENING?
  
 42. M6.02 AHU HANGING DETAIL: PLEASE SHOW MEANS OF
 SECONDARY/AUXILIARY DRAIN PROTECTION PER FBC,M 307.2.3.
 ALSO, SERVICE CLEARNCE IS TO COMPLY WITH FBC,M 306.3,
 NEC 110.26(A) AND MANUFACTURER'S INSTALLATION
 INSTRUCTIONS.
  
 43. M6.02 TYPICAL VERTICAL AHU DETAIL:
 A) PLEASE SHOW MEANS OF AUXILIARY/SECONDARY DRAIN
 PROTECTION PER FBC,M 307.2.3.
 B) FLOOR DRAIN MAY NOT BE LOCATED IN A PLENUM PER FBC,M
 602.
 C) IF CPVC IS TO BE USED FOR CONDENSATE, PLEASE PROVIDE
 SUBMITTAL DATA SHOWING CLEAR INSIDE DIMENSION OF PIPE
 (MIN. 3/4" I.D. PER FBC,M 307.2.2) AND SLAME
 SPREAD/SMOKE DEVELOPEMENT RATING PER FBC,M 602.2.1.
  
 44. PLEASE SEE ELECTRICAL COMMENT #4 REGARDING THE
 ENGINEER'S SIGNATURE.
  
 45. M0.00 EQUIPMENT IDENTIFICATION: IF PLASTIC
 NAMEPLATES ARE TO BE USEDIN PLENUMS, PLEASE PROVIDE
 FLAME SPREAD/SMOKE DEVELOPMENT RATING PER FBC,M
 602.2.1.
  
 46. M0.00 SMOKE CONTROL NOTE: FBC 412.5 DOES NOT RELATE
 TO SMOKE CONTROL OR HIGH-RISE CONSTRUCTION. PLEASE
 REMOVE OR CORRECT.
  
 47. PLEASE PROVIDE DETAIL SHOWING MEANS OF SUPPORT FOR
 DUCTS IN RISERS. FBC 106.1.1.
  
 48. M1.01 & M1.02: ARE GARAGE EXHAUST FANS TO RUN
 CONTINUOUS OR INTERMITTANTLY, CONTROLLED BY C.O.
 SENSORS? PLEASE SEE THE REQUIREMENTS OF FBC,M 404.
  
 PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY
 QUESTIONS:
  
 REVIEWED BY:
 RONALD J REGUEIRO
 561.805.6719
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved