| Date |
Text |
| 2007-03-08 16:07:36 | PLEASE PROVIDE FOLLOWING INFO: |
| | |
| | 1. PLEASE SHOW STANDARDS NOTES OF CITY OF WPB ON |
| | DRAWINGSFOR SIDEWALK WIDTH , ITS SLOPE, DRIVEWAY, |
| | PARKING, HANDICAP PARKING, PAINTPER CITY CODES ETC.,, |
| | MUST MEET PER ADA,,ETC.,YOU CAN GET STANDARD NOTES OF |
| | CITY OF WPB IN A C.D. FROM 1000 45TH STREET. WE SHOULD |
| | HAVE THOSE NOTES ON YOUR DRAWINGS. |
| | 2. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE |
| | DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION |
| | MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| | 3. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| | SIDEWALK ELEVATION MUST MEET FL BLDG CODE, & FLOOD |
| | ZONE,FIRST FLOOR ELEVATION MUST MEET THESE |
| | MINIMUMREQUIREMENTS. |
| | 4. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, & GEO TECH |
| | REPORT. |
| | 5.PLEASE SHOW STORM WATER CALCULATIONS, WHAT CRITERIA |
| | YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" OVER ENTIRE SITE |
| | OR2.5"CRITERIA, ? |
| | 6. WHAT IS THE SITE AREA, YOU ARE DEVELOPING FOR THIS |
| | PROJECT ONLY ?ALSO, WHAT IS TOTAL PERVIOUS,& IMPERVIOUS |
| | AREA FOR THIS PROJECT. |
| | 7. HOW YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| | SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| | AROUND YOUR SITE SO, WE CANSEE THE BEST PIPE TO |
| | CONNECT WITH THE STORM WATERFROM ALL OTHER STORM |
| | WATER PIPES. PLEASE SHOW DETAIL OF THE CONTROL |
| | STRUCTURES WITH ELEVATIONS, NOTCHES, BLEEDING |
| | ELEVATION, ETC DID YOU USE EXFILTRATION TRENCH ? 8. |
| | POLLUTION PREVENTION DETAILS,CLOTHES USED FOR SILT |
| | ETC., PLANS SHOWING SILT FENCE AROUND THE SITE |
| | 9. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED 10. |
| | ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND YOUR |
| | SITE FOR STORM WATER DRAIN. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |