2007-04-20 09:35:26*** DENIED ***
 1) ENERGY CALCULATIONS NEED TO BE ON FORM 600C-04R
 "SOUTH ZONE 7 8 9", PER 2004 FBC 13-600.3.C (12-8-06
 REVISION).
  
 2) CLOTHES DRYER VENT TERMINATION MAY NOT DISCHARGE
 NEAR THE A/C CONDENSER UNIT, SEE 2004 FBC/M 501.2 .
 PLEASE CORRECT.
  
 3) AS REQUESTED IN LAST REVIEW 2-13-07 NOTE 3, THE 8"
 RETURN AIR TRANSFER DUCT TO BEDROOM #3 NEEDS TO BE 9",
 SEE YELLOW HIGH LIGHTS ON MECHANICAL PLANS PAGE 5. SEE
 2004 FBC/R M1602.4 (A). PLEASE CORRECT.
  
 4) AS REQUESTED IN LAST REVIEW 2-13-07 NOTE 4, THE 10"
 RETURN AIR TRANSFER DUCT TO THE MASTER SUITE NEEDS TO
 BE 14", SEE YELLOW HIGH LIGHTS ON MECHANICAL PLANS PAGE
 5. SEE 2004 FBC/R M1602.4 (A) AND (C) EXCEPT. PLEASE
 CORRECT.
  
 5)ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND
 ACCOMPANYING DATA SHALL BEAR THE PRINTED NAME AND
 SIGNATURE OF THE PERSON RESPONSIBLE FOR THE DESIGN. PER
 FBC 104.2.1 .
  
 *** 2004 FBC/R M1602.4 BALANCED RETURN AIR MAY BE
 ACHIEVED BY.
 (A)TRANSFER DUCTS MAY ACHIEVE THIS BY INCREASING THE
 RETURN TRANSFER ONE AND ONE HALF TIMES THE CROSS
 SECTIONAL AREA (SQUARE INCHES) OF THE SUPPLY DUCT
 ENTERING THE ROOM OR SPACE IT'S SERVING AND THE DOOR
 HAVING AT LEAST AN UNRESTRICTED 1 INCHUNDERCUT TO
 ACHIEVE PROPER RETURN AIR BALANCE.
 (C)HABITABLE ROOMS ONLY SHALL BE REQUIRED TO MEET
 THESE REQUIREMENTS FOR PROPER BALANCED RETURN AIR
 EXCLUDING BATHROOMS, CLOSETS, STORAGE ROOMS AND LAUNDRY
 ROOMS, EXCEPT THAT ALL SUPPLY AIR INTO THE MASTER SUITE
 SHALL BE INCLUDED.
  