| Date |
Text |
| 2007-03-05 09:41:13 | ----------------DENIED------------------ |
| | |
| | FLORIDA BUILDING CODE 2004 |
| | FLORIDA BUIDLING CODE, MECHANICAL 2004 |
| | NFPA 96-01 |
| | |
| | 1. PG M-1 INFECTION CONTROL PLAN: NOTES CALL FOR |
| | EX-AHU-3 TO PROVIDE 100% OUTDOOR AIR FOR AREA BEING |
| | RENOVATED. THERE IS NO AHU-3 SHOWN ON THIS PLAN. PLEASE |
| | CLARIFY PER FBC 106.1.1. |
| | |
| | 2. PG A3.0 DETAIL D4 NOTES: REFERS TO PG A13.2 AND |
| | A13.5 FOR ADDITIONAL INFO. NO SUCH PAGES WERE INCLUDED |
| | IN PLAN. PLEASE CLARIFY PER FBC 106.1.1. |
| | |
| | 3. PG A5.1 WHAT PROVISIONS ARE BEING MADE TO MAINTAIN |
| | FIRE RATED SEPARATION BETWEEN GROUND FLOOR AND FIRST |
| | FLOOR WHILE SHAFT IS REMOVED FOR REPLACEMENT OF DUCTS? |
| | |
| | 4. PG A1.0 AND A3.0 SHOW TEMPORARY CONTAINMENT BARRIER |
| | TO BE 1-HOUR RATED. ARE REQUIRED WHERE DUCTS (OUTSIDE |
| | AIR FROM EX-AHU-3 AND TEMPORARY EF) PENETRATE THE RATED |
| | ASSEMBLY PER FBC,M 607.5. |
| | |
| | 5. PG M-2 PLAN NOTE #5: NO INFORMATION REGARDING THE |
| | REMOVAL OF A THROUGH-WALL FAN COULD BE FOUND IN |
| | ARCHITECTURAL DRAWINGS. PLEASE CLARIFY PER FBC |
| | 106.1.1. |
| | |
| | 6. PG M-1 FAN SCHEDULE SHOWS EX-EF-1 MOVING 13,700 CFM. |
| | PG M-5 KITCHEN AIR BALANCE SCHEDULE SHOWS EX-EF-1 |
| | MOVING 2530 CFM. THESE TWO SCHEDULES DO NOT MATCH. IT |
| | ALSO APPEARS THAT THERE IS AN EXTRA 2530 CFM IF EXHAUST |
| | IN THE KITCHEN AIR BALANCE SCHEDULE SINCE EX-EF-1 IS |
| | ALREADY BEING USED BY THE COMBINED HOODS TO PRODUCE THE |
| | 13,700 CFM LISTED AT THE TOP OF THE SCHEDULE. PLEASE |
| | CLARIFY PER FBC 106.1.1. |
| | |
| | 7. PLEASE INDICATE ON PLAN THE THICKNESS OF THE |
| | STAINLESS STEEL EXHAUST DUCTS TO SHOW COMPLIANCE WITH |
| | FBC,M 506.3.1.1. |
| | |
| | 8. PG X1.1 PLEASE REFERENCE SMACNA-95 HVAC DUCT |
| | CONSTRUCTION STANDARDS - METAL AND FLEXIBLE TO SHOW |
| | COMPLIANCE WITH FBC,M 603.3. |
| | |
| | 9. GREASE DUCTS TO BE SLOPED TOWARD THE HOOD AT NOT |
| | LESS THAN 1/4 UNIT VERTICAL IN 12 UNITS HORIZONTAL PER |
| | FBC,M 506.3.7. |
| | |
| | 10. THERE ARE NO CLEANOUTS SHOWN ON HORIZONTAL GREASE |
| | DUCTS IN KITCHEN AREA. CLEANOUTS LOCATED ON HORIZONTAL |
| | DUCTS SHALL BE SPACED NOT MORE THAN 20' APART PER FBC,M |
| | 506.3.9. |
| | |
| | 11. GREASE DUCTS FOR TYPE I HOODS SHALL NOT BE |
| | INTERCONNECTED UNLESS THEY MEET ALL THE REQUIREMENTS OF |
| | FBC,M 506.3.5. THIS DESIGN CALLS FOR THE GREASE DUCTS |
| | FROM HOODS 1,2 AND 7 TO INTERCONNECT AFTER ENTERING THE |
| | RATED SHAFT ASSEMBLY. THIS DOES NOT COMPLY WITH |
| | REQUIREMENT #3 OF THIS SECTION. |
| | |
| | 12. DUCT ENCLOSURE FOR GREASE DUCTS SHALL SERVE ONLY A |
| | SINGLE GREASE EXHAUST DUCT SYSTEM AND SHALL MEET THE |
| | MINIMUM AND MAXIMUM CLEARANCE REQUIREMENTS OF FBC,M |
| | 506.3.10. MAKE-UP AIR DUCTS MAY NOT USE THE SAME SHAFT |
| | ENCLOSURE AS THE GREASE DUCT. |
| | |
| | 13. DUCTS PENETRATING A SHAFT ENCLOSURE SHALL BE |
| | PROTECTED WITH APPROVED FIRE AND SMOKE DAMPERS |
| | INSTALLED IN ACCORDANCE WITH THEIR LISTING PER FBC,M |
| | 607.5.5.1. THIS APPLIES ONLY TO THE MAKE-UP AIR DUCTS. |
| | |
| | 14. DRAWING SK-1 SHOWS METAL STRAPS OVER TOP OF FAN |
| | HOUSINGS FOR THE PURPOSE OF ROOF ATTACHMENT. THESE |
| | STRAPS SHOULD NOT HAVE TO BE REMOVED FOR EQUIPMENT |
| | SERVICE PANEL ACCESS PER FBC,M 306.1. |
| | |
| | NOTE: A SEPARATE PERMIT WILL BE NEEDED FOR THE REQUIRED |
| | MECHANICAL HOOD SUPPRESSION SYSTEM. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE FEEL FREE TO CONTACT |
| | ME. |
| | |
| | RONALD J REGUEIRO |
| | 561-805-6719 |
| | [email protected] |