| 2007-02-01 09:11:58 | PLEASE PROVIDE FOLLOWING INFO: |
| | |
| | 1.PLEASE MAKE SURE ALL STANDARDS NOTES ON DRAWINGS MUST |
| | MEET CITY OF WPB, & ADA REQUIREMENTS FOR SIDEWALK WIDTH |
| | , ITS SLOPE, DRIVEWAY, PARKING, HANDICAP PARKING, PAINT |
| | PER CITY CODES ETC.,, |
| | 2. PLEASE MAKE SURE DUMPSTER & ITS ENCLOSURE LOCATION |
| | ON DWG, MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| | 3. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| | SIDEWALK ELEVATION MUST MEET FL BLDG CODE, PLEASE SHOW |
| | ON THE DRAWINGS. |
| | 4. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, GEO TECH |
| | REPORT. |
| | 5.PLEASE SHOW STORM WATER CALCULATIONS, WHAT CRITERIA |
| | YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" OVER ENTIRE SITE |
| | OR2.5"CRITERIA, ?PERVIOUS AREA, LIKE GREEN, |
| | LAKES, ETC,IMPERVIOUS AREA CAL., |
| | 6. WHAT IS THE SITE AREA, YOU ARE DEVELOPING FOR THIS |
| | PROJECT ONLY ? SO, WE CAN CHECK PERVIOUS, IMPERVIOUS |
| | CAL. |
| | 7. HOW YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| | SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| | AROUND YOUR SITE SO, WE CANSEE THE BEST PIPE TO |
| | CONNECT WITH THE STORM WATERFROM ALL OTHER STORM |
| | WATER PIPES. PLEASE SHOW DETAIL OF THE CONTROL |
| | STRUCTURES WITH ELEVATIONS, NOTCHES, BLEEDING |
| | ELEVATION, ETC DID YOU USE EXFILTRATION TRENCH ? |
| | 8.ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| | YOUR SITE FOR STORM WATER DRAIN. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL IN A LETTER & ON |
| | DRAWINGS AS REVISIONS TO EXPEDITE YOUR PERMITTING |
| | PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |