| 2007-07-24 10:31:06 | ***FAILED**** PLEASE PROVIDE THE FOLLOWING: |
| | |
| | 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI). |
| | PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR |
| | NOI. |
| | YOU CAN GET NOI INFO FROM |
| | WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/ |
| | NOTICE OF INTENT DEP FORM 62-621.300(4)(B), |
| | EFFECTIVE MAY 1, 2003 |
| | 2. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| | SIDEWALK ELEVATION MUST MEET FLOOD ZONE AREA OF YOUR |
| | SITE, & 5,10, 25, 100 YEAR FLOOD CRITERIATO DETERMINE |
| | THE FIRST FLOOR ELEVATION, HOW DID YOU COME UP THE |
| | FIRST FLOOR ELEVATION,PLEASE SHOW THATIN YOUR STORM |
| | WATER CALCULATION.WE COULD NOT FIND WATER QUALITY |
| | CALS THAT YOU SAID YOU HAVE SUBMITTED. WE NEED A |
| | SEPARATE COPY OF WATER QUALITY CALS FOR THIS PROJECT TO |
| | KEEP IN THIS FILE. |
| | 3. MAKE SURE THESE SITE AREAS SHOWN ON DRAWINGS MUST |
| | MATCH WITH AREAS USED IN STORM WATER QUALITY |
| | CALCULATIONS. |
| | 4.WE COULD NOT FIND A COPY OF SFWMD PERMIT & A WATER |
| | QUALITY CALS THAT YOU SAID YOU SUBMITTED THIS TIME. WE |
| | SAW YOUR GEO TECH REPORT BUT WE COULD NOT FIND SOIL |
| | CONDUCTIVITY USED IN EXFILTRATION TRENCH. PLEASE |
| | RESUBMIT REVISED GEO TECH REPORT. |
| | 5. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED |
| | 6. PLEASE PROVIDE LATEST COPY OF SET OF CIVIL DRAWINGS |
| | WHEN YOU RESUBMIT. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |