Plan Review Notes
Plan Review Notes For Permit 06120650
Permit Number 06120650
Review Stop G
Sequence Number 2
Notes
Date Text
2007-02-09 15:13:09DENIED 2ND TIME
 REFERENCE: FBC-2004 FUEL GAS
  
 PLEASE SEE THERE ARE ITEMS FROM THE PREVIOUS REVIEW
 WHICH STILL NEED TO BE ADDRESSED ALONG WITH NEW
 COMMENTS BASED ON CHANGES IN PLANS AND NEW INFORMATION
 AND/OR CHANGES MADE TO PLANS.
  
 ****IMPORTANT**** PLEASE SEE THE NOTES BELOW ARE TAKEN
 DIRECTLY FROM THR PREVIOUS REVIEW WITH A (NO). (OK) OR
 (NO/OK).
  
 A) A (NO), WILL CONTAIN A FURTHER EXPLANATION AS TO
 WHY THE COMMENT MAY NOT HAVE BEEN FULLY ADDRESSED WITH
 THE PREVIOUS REVIEW NOTE BELOW WITH **PREVIOUS REVIEW
 NOTE #1.
  
 B) A (OK), WILL HAVE NO COMMENTS EXCEPT PERHAPS A
 REFERENCE TO SEE **NEW NOTES** THE PREVIOUS REVIEW NOTE
 WILL BE REMOVED.
  
 C) A (NO/OK), WILL HAVE FURTHER EXPLANATION AS PART OF
 THE COMMENT MAY HAVE BEEN ADDRESSED, HOWEVER NOT ALL.
 THE PREVIOUS REVIEW WILL BE NOTED **PREVIOUS REVIEW
 NOTE#1**
  
 D) NEW NOTES WILL BE ADDED TO THE END AND BE LABELED
 **NEW NOTES**
  
 1. (NO)SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
 NOTE: NOT ALL CUT SECTIONS OF PIPE HAVE CORRESPONDING
 LENGTHS INDICATED ON SHEET 3.0P GAS RISER. PLEASE
 CORRECT AND RESUBMIT.
  
 2. (OK)
  
 3. (NO)SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4).
 NOTE: NOW THAT THE GAS TYPE IS INDICATED AS LP, PLEASE
 INDICATE ON THE RESUBMITTED DRAWINGS THE TANK LOCATION,
 LOCATION OF 1ST AND 2ND STAGE REGULATORS AND ALL
 RELATED PIPING WITH CUT LENGTHS AND SIZES.
  
 4. (NO)SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
 NOTE:PLEASE SUBMIT MANUFACTURER SPECIFICATION SHEETS
 FOR THE GAS APPLIANCES TO VERIFY BTU LOADS, THE
 EMERGENCY SHUT OFF VALVE TO VERIFY COMPLIANCE AND THE
 1ST AND 2ND STAGE REGULATORS TO VERIFY COMPLIANCE.
  
 **NEW COMMENT**
  
 5. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
  
 6. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES
 PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
  
 **********IMPORTANT INFORMATION
 **IN ORDER TO EXPIDITE PLAN REVIEW: WHEN RESUBMITTING,
 PLEASE REPLACE ONLY SHEETS
 WHICH HAVE CHANGED AND PROVIDE ONE COPY
 OF ALL OLD/VOIDED SHEETS FOR REFERENCE
 ONLY. NOTE: ONLY ONE CORRECTED DRAWING
 IN RED INK FOR REFERENCE FOR
 RESUBMITTAL.
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721
  
  