| 2008-07-11 13:32:34 | PLEASE PROVIDE FOLLOWING INFO: |
| | |
| | 1. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| | SIDEWALK ELEVATION MUST MEET FL BLDG CODE, PLEASE SHOW |
| | ON THE DRAWINGS. |
| | YOUR RESPOSEFOR REV 2 NOT ENOUGH,YOU NEED TO PROVE |
| | IN A DOCUMENTS/CALCULATIONS THATYOU HAVE CONSIDERED |
| | FLOOD ZONE OF THISAREA,&5, 10, 25, 100 YEARRAIN |
| | FLOOD CRITERIA, AND CROWN OF THE ROAD HAVE BEEN |
| | CONSIDERED. FIRST FLOOR ELEVATION SHOULD BE HIGHER THAN |
| | CROWN OF THE ROAD BY ATLEAST 1 FOOT. ORIGINAL PLANS |
| | WERE APROVED IN 1970'S PER YOUR LETTER BUT THAT IS, |
| | TOO LONG TIME TO CONTINUE IN EFFECT, NORMALLYITIS A |
| | 5 YEAR PERMIT LIMIT. IF YOU DO NOT BUILD IN 5 YEARS YOU |
| | NEED TO RE APPLY UNLESS YOU HAVE A LETTER ALLOWING YOU |
| | TO BUILD ANY TIME. |
| | |
| | OUR RESPONSE FOR REV 3FOR YOUR LETTER OF 5/28/08 FROM |
| | DOUG WINTER COMP., INC.WE NEED A RESPONSE FROM MOCK |
| | ROOS FOR YOUR LETTER OF 5/13/08 TO MOCK ROOS. |
| | |
| | 2. PLEASE PROVIDE A COPY OF SFWMD PERMIT, GEO TECH |
| | REPORT., |
| | OUR RESPONSE FOR REV 2 :AGAIN,SFWMD PERMIT IS GOOD |
| | FOR FIVE YEARS. |
| | |
| | OUR RESPONSE FOR REV 3 FOR YOUR LETTER 5/28/08: SINCE |
| | MOCK ROOS IS REVIEWING STORM WATER CALS, LET MOCK ROOS |
| | DECIDE. |
| | |
| | |
| | 3.PLEASE SHOW STORM WATER CALCULATIONS, WHAT CRITERIA |
| | YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" OVER ENTIRE SITE |
| | OR2.5"CRITERIA, ? PLEASE SHOW ON DRAWINGPERVIOUS |
| | AREA, LIKE GREEN, LAKES, ETC,IMPERVIOUS AREA. |
| | |
| | OUR RESPONSEFOR REV 2:AGAIN YOU ARE SAYING IN YOUR |
| | LETTER THAT IT IS PART OF THE MASTER PLAN OF 1970'S. |
| | WELL,1970 IS WAY TOO BACK.PLEASE PROVIDE THE STORM |
| | WATER QUALITY CALCULATIONS. WE NEED EX-FILTRATION |
| | TRENCH CALCULATION ALSO. |
| | |
| | OUR RESPONSE FOR REV 3 FOR YOUR LETTER 5/28/08: WE NEED |
| | STORM WATER QUALITY CALS.MOCK-ROOS REVIEWS IT. YOU |
| | NEED TO SUBMIT STORM WATER QUALITY CALS TO 1000 45TH |
| | STREET ENGINEERING, SO THEY COULD GIVE IT TO MOCK ROOS |
| | FOR REVIEW.WE DO NOT ISSUE PERMIT UNTIL 1000 45TH |
| | ST. ENGINEERING APPROVES. |
| | |
| | 4WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED. |
| | |
| | OUR RESPONSEFOR REV 3: MANNY G. PUT ARED STAMP WITH |
| | HIS SIGNATURE WHEN HE APPROVES YOUR DRAWINGS. WE DID |
| | NOT SEE STAMPS ON YOUR DRAWINGS YET. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |