| Date |
Text |
| 2007-02-06 10:30:31 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 CHAPTER 1 |
| | |
| | 1. SHT P-1 UNIT A SANITARY RISER DIAGRAM. THE AUTOMATIC |
| | CLOTHES WASHER FIXTURE SHALL CONNECT TO A BRANCH DRAIN |
| | OR DRAINAGE STACK A MINIMUM OF 3" IN DIAMETER. SECTION |
| | 406.3.--THE FITTING SHOWN AT THE TOP OF THE STACK |
| | IS NOT APPROVED. THERE SHOULD BE A WYE DOWNSTREAM AND A |
| | SWEEP ABOVE THE WYE TO CONNECT THE THREE BATHROOM |
| | GROUPS. (SEE RED LINE EXAMPLE ON ONE SET OF PLANS). |
| | |
| | 2. SHT P-1 WATER HEATER DETAIL, IF A BACKFLOW PREVENTOR |
| | IS REQUIRED, THEN THERMAL EXPANSION CONTROL WILL BE |
| | REQUIRED PER SECTION 607.3.2. |
| | |
| | 3. SHT P-2 UNIT B SANITARY RISER DIAGRAM. THE AUTOMATIC |
| | CLOTHES WASHER FIXTURE SHALL CONNECT TO A BRANCH DRAIN |
| | A MINIMUM OF 3" IN DIAMETER. SECTION 406.3.--THE |
| | TUB AND THE WATER CLOSET AT THE BASE OF THE STACK ARE |
| | NOT VENTED. SECTION 901.2.1.--ONLY THE FIXTURES |
| | WITHIN THE BATHROOM GROUP SHALL CONNECT TO THE |
| | WET-VENTED HORIZONTAL BRANCH DRAIN. ANY ADDITIONAL |
| | FIXTURES SHALL DISCHARGE DOWNSTREAM OF THE WET VENT. |
| | SECTION 909.1. THE SECOND FLOOR MASTER BATH & BATH #2 |
| | SHALL CONNECT DOWNSTREAM OF THE BATHROOM FIXTURES IN |
| | OPTIONAL BATHROOM #4. THE AAV FOR OPTIONAL BATHROOM #4 |
| | SHALL BE INSTALLED FOR THE BRANCH LINE FOR THE BATHROOM |
| | ONLY. AS SHOWN IT IS VENTING ONLY THE LAV. (SEE RED |
| | LINE EXAMPLES ON ONE SET OF PLANS). |
| | |
| | 4. MORE INFORMATION IS REQUIRED. ARE THE UNITS TO BE |
| | INDIVIDUALLY METERED? IF THERE IS A SINGLE WATER METER, |
| | AN RPZV BACKFLOW WILL BE REQUIRED. SECTION 608.13.2. |
| | PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 5. SUBMIT WATER RISER DIAGRAMS FOR EACH UNIT TYPE. SHOW |
| | ALL PIPE SIZES, VALVES AND WATER HAMMER ARRESTORS |
| | REQUIRED BY SECTION 604.9. (WASH MACHINES, DISH |
| | WASHERS, & ICE MAKERS). WATER HAMMER ARRESTORS SHALL BE |
| | LOCATED IN AN "EFFECTIVE RANGE", (NOT IN THE CEILING), |
| | PER PDI-WH 201 AND MANUF. INSTALLATION INSTRUCTIONS. |
| | SECTION 106.3.5.1.3(3)(13) |
| | |
| | 6. SUBMIT PLUMBING FLOOR PLANS FOR EACH UNIT SHOWING |
| | THE SANITARY, WATER, P/T DISCHARGE LINE, EMERGENCY W/H |
| | PAN DRAIN LINE, THE WATER SERVICE, AND SANITARY SEWER |
| | LOCATIONS. SECTION 106.3.5.1.3(4)(10). |
| | |
| | 7. AN IRRIGATION PERMIT AND PLANS ARE REQUIRED. SECTION |
| | 105.1. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |