| 2007-03-12 10:04:24 | *** DENIED *** |
| | 1) SEE MECHANICAL PLANS PAGE MEP-2 OF 2 "A/C NOTES", |
| | 10,000 TOTAL, 1410KW, AND 13,331 SENS, IS INCORRECT FOR |
| | A THREE TON A/C SYSTEM, PLEASE OBTAIN THE |
| | MANUFACTURER'S SPECIFICATION'S AND INTER THE CORRECT |
| | INFORMATION. |
| | |
| | 2) COULD NOT FIND THE TRANE A/C SYSTEM LISTED ON THE |
| | PLANS IN THE ARI DIRECTORY, PLEASE SUBMIT DETAILED |
| | MANUFACTURER'S SPECIFICATION'S AND INSTALLATION |
| | INSTRUCTIONS FOR A/C SYSTEM TO BE INSTALLED. |
| | |
| | 3) AS NOTED IN LAST REVIEW 12/19/06 NOTE #2. PLEASE SEE |
| | THE MANUAL J CALCULATIONS ARE CALLING FOR A SMALLER A/C |
| | SYSTEM THEN THE MECHANICAL PLANS ARE, THEIR FORTHE |
| | PLANS WOULD NEED TO LIST A SMALLER A/C SYSTEM TO BE |
| | INSTALLED, SEE 2004 FBC 13-607.ABC.1.1. |
| | |
| | 4) AS NOTED IN LAST REVIEW 12/19/06 NOTE #3. THE ENERGY |
| | CALCULATIONS SUBMITTED ARE INCORRECT, PLEASE SUBMIT |
| | CORRECTED ENERGY CALCULATIONS, SEE 2004 FBC 13-101.2. |
| | |
| | 5) SEE ENERGY CALCULATIONS #15 IS TAKING THE CF CREDIT, |
| | ELECTRICAL PLANS SHOW FUTURE FANS, CREDIT MAY NOT BE |
| | TAKEN FOR FUTURE WORK. |
| | |
| | 6) PLEASE SEE YELLOW HIGH LIGHTS ON ENERGY CALCULATIONS |
| | AND MECHANICAL PLANS, PLEASE CORRECT. |
| | |
| | 7) AS NOTED IN LAST REVIEW 12/19/06 NOTE #4.THE 12X6 |
| | RETURN AIR TRANSFER GRILLS TO THE BEDROOMS ARE TO |
| | SMALL. BALANCED RETURN AIR MAY BE ACHIEVED BY. |
| | (A)TRANSFER DUCTS MAY ACHIEVE THIS BY INCREASING THE |
| | RETURN TRANSFER ONE AND ONE HALF TIMES THE CROSS |
| | SECTIONAL AREA (SQUARE INCHES) OF THE SUPPLY DUCT |
| | ENTERING THE ROOM OR SPACE IT'S SERVING AND THE DOOR |
| | HAVING AT LEAST AN UNRESTRICTED 1 INCHUNDERCUT TO |
| | ACHIEVE PROPER RETURN AIR BALANCE. |
| | (B)TRANSFER GRILLES SHALL USE 50 SQUARE INCHES (OF |
| | GRILLE AREA) TO 100 CFM (OF SUPPLY AIR) FOR SIZING |
| | THROUGH-THE-WALL TRANSFER GRILLES AND USING AN |
| | UNRESTRICTED 1-INCH UNDERCUTTING OF DOORS TO ACHIEVE |
| | PROPER RETURN AIR BALANCE |
| | (C)HABITABLE ROOMS ONLY SHALL BE REQUIRED TO MEET |
| | THESE REQUIREMENTS FOR PROPER BALANCED RETURN AIR |
| | EXCLUDING BATHROOMS, CLOSETS, STORAGE ROOMS AND LAUNDRY |
| | ROOMS, EXCEPT THAT ALL SUPPLY AIR INTO THE MASTER SUITE |
| | SHALL BE INCLUDED. PER 2004 FBC/R M1602.4 . |
| | |
| | 8) MECHANICAL PLANS NOW SHOW NEW 12X12 GRILLS AND |
| | UNKNOWN DUCTS (YELLOW HIGH LIGHTED) IN EACH ROOM, |
| | PLEASE REMOVE OR CORRECT. |
| | |
| | 9) SEE TITLE BLOCK ON PLANS IS SHOWING D M & L |
| | ENGINEERING CORP. "C.O.A. #10784" . CHECKED DBPR WEB |
| | SITE AND FOUND NO C. O. A. NUMBER OR COMPANY LISTED. |
| | SEE FAC 61G15-23.002 (2) AND COMPLY. |
| | |
| | MECHANICAL PLAN REVIEW BY; |
| | TOM GORDON (561) 805-6729. |