| 2006-12-19 11:39:10 | *** DENIED *** |
| | 1) DM&L ENGINEERING CORP. NEED THEIR CERTIFICATE OF |
| | AUTHORIZATION NUMBER IN THE TITLE BLOCK, SEE FAC |
| | 61G15-23.002. |
| | |
| | 2) MANUAL J CALCULATIONS ARE CALLING FOR 13,331 |
| | SENSIBLE BTU'S., THE MECHANICAL PLANS ARE CALLING FOR |
| | 26,200 SENSIBLE BTU'S., THE PLANS CAN ONLY CALL FOR 20% |
| | MORE THAN THE MANUAL J CAL'S., SEE 2004 FBC |
| | 13-607.ABC.1.1. |
| | |
| | 3) ENERGY CALCULATIONS ARE CALLING FOR 10,000 BTU |
| | COOLING SYSTEM AND 10,000 BTU (=2.9 KW) HEATING SYSTEM, |
| | THE MECHANICAL PLANS ARE CALLING FOR 34,000 BTU COOLING |
| | AND 10 KW (=34,000 BTU) HEATING. THE ENERGY CAL'S. AND |
| | MECHANICAL PLANS MUST COINCIDE, PLEASE CORRECT. |
| | |
| | 4) THE RETURN AIR TRANSFER GRILLS TO THE BEDROOMS ARE |
| | TO SMALL, |
| | BALANCED RETURN AIR MAY BE ACHIEVED BY. |
| | (B)TRANSFER GRILLES SHALL USE 50 |
| | SQUARE INCHES (OF GRILLE AREA) TO 100 |
| | CFM (OF SUPPLY AIR) FOR SIZING |
| | THROUGH-THE-WALL TRANSFER GRILLES AND |
| | USING AN UNRESTRICTED 1-INCH |
| | UNDERCUTTING OF DOORS TO ACHIEVE PROPER |
| | RETURN AIR BALANCE |
| | (C)HABITABLE ROOMS ONLY SHALL BE |
| | REQUIRED TO MEET THESE REQUIREMENTS FOR |
| | PROPER BALANCED RETURN AIR EXCLUDING |
| | BATHROOMS, CLOSETS, STORAGE ROOMS AND |
| | LAUNDRY ROOMS, EXCEPT THAT ALL SUPPLY |
| | AIR INTO THE MASTER SUITE SHALL BE |
| | INCLUDED. PER 2004 FBC/R M1602.4 . |
| | |
| | MECHANICAL PLAN REVIEW BY; |
| | TOM GORDON (561) 805-6729. |