| Plan Review Notes For Permit 06120253 |
| Permit Number |
06120253 |
|
| Review Stop |
E |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2007-01-12 06:47:18 | 1) NEED TO SHOW THE GROUNDING DETAIL FOR THE 5KW | | | TRANSFORMER. | | | | | | 2) NEED A DETAILED PANEL SCHEDULE FOR PANEL L1. | | | | | | 3) THE CONTROL PANEL BY OTHERS PLEASE SHOW DETAILS, | | | SIZE, MAKE. ECT. ECT. | | | | | | 4) NEED THE AIC RATINGS FOR THE MAIN, SUB PANEL, AND | | | CONTROL PANEL. | | | | | | 5) YOU HAVE CREATED A PARALLEL PATH FOR THE NEUTRAL | | | FROM THE METER TO THE 100A MAIN. |
|