Plan Review Notes
Plan Review Notes For Permit 06111071
Permit Number 06111071
Review Stop M
Sequence Number 2
Notes
Date Text
2007-04-14 13:41:092ND REVIEW: DENIED
  
 THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH
 PREVIOUS COMMENTS/RESPONSES FOR THE PURPOSE OF
 CONTINUITY.
  
 1. STRUCTURAL PLAN ONLY PROVIDES DETAIL FOR RTU'S.
 A) DETAIL FOR RTU'S: ARE THERE NO REQUIREMENTS CURB
 ATTACHMENT TO STRUCTURE? EQUIPMENT TO CURB? BY WHAT
 MEANS ARE THE 16GAUGE STRAPS TO BE ATTACHED TO THE 4X4
 ANGLES? STRAPS OVER RTU'S WILL NOT BE PERMITTED FOR
 WIND LOAD REQUIREMENTS IF THEY INTERFERE WITH SERVICE
 ACCESS OR REDUCE CLEAR SPACE FOR SERVICE ACCESS IN ANY
 WAY. FBC,M 306.1.
 B) NO STRUCTURAL DETAIL COULD BE FOUND FOR ANY OTHER
 ROOFTOP EQUIPMENT SUCH AS: EXHAUST FANS, CONDENSING
 UNITS, ELEVATOR SHAFT VENT CAPS, ROOFTOP DUCT, ANY
 RELATED SUPPORTS AND CURBS.
  
 2. OK
  
 3. OK
  
 4. IF CURB IS TO BE USED AS A DUCT, PLEASE PROVIDE
 MANUFACTURER'S SUBMITTAL DATA SHOWING CURB IS DESIGNED
 TO MEET THE MINIMUM INSULATION REQUIREMENTS OF FBC,M
 603.8. THE CURB SHALL BE INSULATED TO MINIMUM R-8 FOR
 OUTDOOR DUCT PER FBC TABLE 13-410.1.ABC.2.2.
  
 5. OK
  
 6. OK
  
 7. OK
  
 8. OK PENDING PLUMBING APPROVAL.
  
 9. OK
  
 10. OK
  
 11. OK PENDING FIELD INSPECTOR'S APPROVAL.
  
 12. OK
  
 THE FOLLOWING ARE NEW COMMENTS:
  
 A. NO INFORMATION WAS SHOWN REGARDING DRYER EXHAUST FOR
 GUEST LAUNDRY ROOM. FBC,M 504.6.2.
  
 B. SMOKE DAMPERS (COMBINATION FIRE/SMOKE DAMPERS WOULD
 MEET BOTH REQUIREMENTS) REQUIRED AT CORRIDOR WALL
 PENETRATIONS PER FBC,M 607.5.4.
  
 C. SHAFT ENCLOSURES PERMITTED TO BE PENETRATED BY DUCTS
 SHALL BE PROTECTED WITH APPROVED FIRE AND SMOKE DAMPERS
 PER FBC,M 607.5.5.1. THIS APPLIES TO FRESH AIR DUCTS
 FROM RTU'S INTO CORRIDORS.
  
 D. BATH EXHAUST RISERS: A METAL RISER DUCT IS REQUIRED
 INSIDE THE SHAFT, TO BE PENETRATED BY THE SUBDUCT PER
 FBC,M 501.4 (ALL EXHAUST DUCT TO BE METAL) AND FBC,M
 603.4.1 (GYPSUM SHAFTS ARE LIMITED TO CONVEYING RETURN
 AIR ONLY). SMOKE DAMPERS ARE ALSO REQUIRED AT BATH
 EXHAUST DUCT PENETRATIONS INTO SHAFTS PER FBC,M
 607.5.5.1. PLEASE SEE THAT EXCEPTION 1.1 RELATED TO
 SUBDUCTS ONLY REMOVES THE REQUIREMENT FOR FIRE DAMPERS
 WHILE LEAVING IN PLACE THE REQUIREMENT FOR SMOKE
 DAMPERS.
  
 E. PLEASE PROVIDE SIZES OF O.A. BRANCH DUCTS FEEDING
 THE 48X4 GRILLS IN CORRIDORS. ALSO, PLEASE SHOW SIZES
 OF RETURN DUCTS FOR FCU'S 1,2,3.
  
 REVIEWED BY:
 RONALD J REGUEIRO
 561.805.6719
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved