| Date |
Text |
| 2007-02-05 14:51:40 | -------------------DENIED----------------- |
| | |
| | 1. PLEASE PROVIDE DETAIL SHOWING METHOD OF ATTACHMENT |
| | FOR ALL OUTDOOR EQUIPMENT, SUCH AS ROOFTOP UNITS |
| | (ROOF-TO-CURB AND CURB-TO-EQUIPMENT), DUCT SUPPORTS AND |
| | GROUND MOUNTED UNITS PER FBC,M 301.13. AN ENGINEERED |
| | SYSTEM IS REQUIRED TO MEET WIND LOAD REQUIREMENTS. |
| | NOTE: THE CITY OF WEST PALM BEACH IS IN THE 140MPH WIND |
| | ZONE. PLEASE INDICATE ON PLANS THE WIND ZONE FOR WHICH |
| | THE SYSTEM IS DESIGNED. |
| | |
| | 2. EXHAUST FANS: APPLIANCES REQUIRING SERVICE ON A ROOF |
| | HAVING A SLOPE OF 3:12 (25%) OR GREATER WILL REQUIRE |
| | CATWALKS FOR ACCESS AND LEVEL SUPPORT PLATFORMS PER |
| | FBC,M 306.5 ? 306.6. THIS CONDITION EXISTS IN SEVERAL |
| | LOCATIONS AS SHOWN ON PAGE A-106. |
| | |
| | 3. ROOFTOP UNIT DETAIL NOTE CITES IMC. PLEASE REFERENCE |
| | 2004 FBC,M. |
| | |
| | 4. ROOFTOP UNIT DETAIL SHOWS UNITS WITH DOWN DISCHARGE |
| | AND AN OPEN SPACE INSIDE THE CURB BEING USED FOR |
| | AIRFLOW. THE SUPPLY DUCT IS SHOWN ATTACKING TO THE CURB |
| | RATHER THAN TO THE UNIT. PLEASE CLARIFY. |
| | |
| | 5. FIRE DAMPER DETAIL: FIRE DAMPERS SHALL MEET THE |
| | REQUIREMENTS OF UL 555 AND BE INSTALLED PER THE |
| | MANUFACTURER?S INSTALLATION INSTRUCTIONS AND THEIR |
| | LISTING PER FBC,M 607.2. A POTENTIAL CONFLICT CAN BE |
| | AVOIDED BY REMOVING THE CURRENT DETAIL AND REPLACING IT |
| | WITH A NOTE THAT THE DAMPERS ARE TO BE INSTALLED PER |
| | MANUFACTURER?S INSTALLATION INSTRUCTIONS. THESE |
| | INSTRUCTIONS SHOULD BE SUBMITTED (3 COPIES) WITH PLANS |
| | AS WELL AS BE MADE AVAILABLE IN THE FIELD FOR |
| | INSPECTION PURPOSES. |
| | |
| | 6. HORIZONTAL FAN COIL UNIT DETAIL SHOWS SECONDARY |
| | DRAIN FROM AUXILIARY DRAIN PAN PIPED TO A CONDENSATE |
| | PUMP. A SECONDARY DRAIN OR AUXILIARY DRAIN PROTECTION |
| | IS TO BE INSTALLED PER THE REQUIREMENTS OF FBC,M |
| | 307.2.3. |
| | |
| | 7. VERTICAL FAN COIL UNIT DETAIL (IF USED) DOES NOT |
| | SHOW ANY SECONDARY DRAIN OR AUXILIARY DRAIN PROTECTION |
| | SYSTEM. PLEASE SHOW COMPLIANCE WITH FBC,M 307.2.3. |
| | |
| | 8. M-101 KEY NOTES # 1 & 2: CONDENSATE DRAIN IS TO RUN |
| | ABOVE THE CEILING TO THE NEAREST DOWNSPOUT. SOME AREAS |
| | WHERE THIS IS NOTED DO NOT HAVE CEILINGS WHERE THIS |
| | DRAIN LINE CAN BE CONCEALED. PLEASE CLARIFY. |
| | |
| | 9. M-101 SHOWS FCUS WITH DUCT SMOKE DETECTORS INSTALLED |
| | ON RETURN SIDE. DUCT SMOKE DETECTORS ARE TO BE LOCATED |
| | ON SUPPLY DUCTS PER FBC,M 606.2.1. |
| | |
| | 10. PLEASE INDICATE ON PLAN TYPE OF MATERIAL TO BE USED |
| | FOR CONDENSATE DRAIN LINES. SEVERAL AREAS ABOVE CEILING |
| | ARE SHOWN TO BE PLENUMS AND ALL MATERIALS WITHIN |
| | PLENUMS MUST MEET THE REQUIREMENTS OF FBC,M 602.2.1. |
| | |
| | 11. CONTAMINATION PREVENTION: EXHAUST DUCTS |
| | (BATH,DRYER) UNDER POSITIVE PRESSURE SHALL NOT EXTEND |
| | INTO OR PASS THROUGH DUCTS OR PLENUMS. |
| | |
| | 12. PLEASE SEE ELECTRICAL PLAN REVIEW COMMENTS 2-4 |
| | REGARDING ENGINEER/ARCHITECT STAMP, SIGNATURE AND TITLE |
| | BLOCK REQUIREMENTS. |
| | |
| | |
| | RONALD J REGUEIRO |
| | 561-805-6719 |
| | [email protected] |