| Date |
Text |
| 2006-12-01 10:29:05 | UNSAT |
| | REFERENCE: FBC-2004 FUEL GAS AND FBC-2004 CHAPTER 1 |
| | |
| | THE FOLLOWING CORRECTIONS ARE REQUIRED FOR GAS PLAN |
| | REVIEW TO MEET CODE COMPLIANCE: |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. |
| | NOTE: THE SUBMITTED DRAWINGS ARE NOT AN ISOMETRIC |
| | DRAWING AND DO NOT CLEARLY SHOW ALL CUT SECTIONS OF |
| | PIPE AND CORRESPONDING LENGTHS. THE ONLY CORRESPONDING |
| | LENGTH INDICATED IS THE UNDERGROUND PE. THE ABOVE |
| | GROUND CORRESPONDING LENGTHS MUST ALSO BE INDICATED ON |
| | DRAWINGS AS WELL AS THE TWO UNDER GROUND TANKS AND HOW |
| | THE TANKS WILL BE PIPED AND THE LOCATION OF THE FIRST |
| | AND SECOND STAGE REGULATORS. |
| | |
| | 2. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | NOTE: PLEASE INDICATE THE ABOVE GROUND PIPING MATERIAL |
| | AND SIZES. |
| | |
| | 3. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO |
| | VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2 |
| | NOTE: PLEASE SUBMIT MANUFACTURE SHEETS OF POOL HEATER. |
| | THE MASTER PERMIT NUMBER INDICATED ON THE PERMIT |
| | APPLICATION IS CLOSED AND THERE IS NO RECORD ON FILE OF |
| | THE POOL HEATER. |
| | |
| | 4. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | NOTE: THE SUBMITTED SITE DRAWINGS INDICATE ONE UNDER |
| | GROUND TANK,BUT THE PERMIT APPLICATION INDICATES TWO |
| | UNDERGROUND TANKS. PLEASE CORRELATE THE TWO FOR THE |
| | RESUBMITTAL. THERE IS NO INDICATION OF THE TANK TYPE |
| | (DOT OR ASME) IN THE SUBMITTALS. PLEASE CORRECT THIS IN |
| | THE RESUBMITTAL. |
| | |
| | 5. FBC-2004 CHAPTER 1,SECTION 106.3.4.2: |
| | THE PERSON RESPONSIBLE FOR THE DESIGN OF |
| | THE DRAWING SHALL CLEARLY PRINT AND SIGN |
| | NAME, AND ALSO DATE DRAWING. PLEASE DO |
| | THIS PRIOR TO RESUBMITTING. |
| | |
| | |
| | **IN ORDER TO EXPIDITE PLAN REVIEW: WHEN RESUBMITTING, |
| | PLEASE REPLACE ONLY SHEETS |
| | WHICH HAVE CHANGED AND PROVIDE ONE COPY |
| | OF ALL OLD/VOIDED SHEETS FOR REFERENCE |
| | ONLY. NOTE: ONLY ONE CORRECTED DRAWING |
| | IN RED INK FOR REFERENCE FOR |
| | RESUBMITTAL. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY MIKE PERSON |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | UNDER SUPERVISION OF K.STEVENS |
| | (561) 805-6721 |