| Date |
Text |
| 2008-01-03 18:36:24 | FAILED |
| | |
| | 1) RESPOND TO COMMENTS IN WRITING. |
| | |
| | 2) CORRECTED |
| | |
| | 3) CORRECTED |
| | |
| | 3) CORRECTED |
| | |
| | 4) SHEET A1 SHALL SHOW ALL OF THE LATEST APPROVED |
| | REVISIONS TO THE OVERALL SITE PLAN.STAFF HAS NOT |
| | RECEIVED THE LATEST SITE PLAN FOR MINOR AMENDMENT |
| | APPROVAL. (REPEAT COMMENT) |
| | |
| | 5) CORRECTED |
| | |
| | 6) CORRECTED |
| | |
| | 7) CORRECTED |
| | |
| | 8)CORRECTED |
| | |
| | 9) CORRECTED |
| | |
| | 10) CORRECTED |
| | |
| | 11) CORRECTED |
| | |
| | 12) CORRECTED |
| | |
| | 13) NOT ALL CONDITIONS OF ORD. NO. 3987-06 HAVE BEEN |
| | MET - REPEAT COMMENT.VERIFICATION FROM PALM BEACH |
| | COUNTY SHALL BE PROVIDED TO RELEASE THE TRAFFIC |
| | CONDITIONS.THE USE TABLE ITEMS HAVE NOT BEEN |
| | SUBMITTED.NEW - PER THE ORDINANCE, A MINOR AMENDMENT |
| | IS REQUIRED TO ACCEPT THE NEW COUNTY TRAFFIC LETTER |
| | ISSUED ON OCTOBER 28, 2007.STAFF NEEDS TO MEET WITH |
| | YOU TRAFFIC CONSULTANT TO ADDRESS THE ITEMS BELOW. |
| | |
| | A. THE PROPERTY OWNER SHALL POST SURETY IN THE AMOUNT |
| | OF ONE HUNDRED FIFTY THOUSAND DOLLARS ($150,000.00) |
| | WITHIN TWELVE (12) MONTHS OF THIS DEVELOPMENT ORDER |
| | (DUE BY OCTOBER 10, 2007) IN A FORM ACCEPTABLE TO THE |
| | COUNTY ATTORNEY TO ASSURE THE INSTALLATION OF THE |
| | TRAFFIC SIGNAL WHEN WARRANTED.NO PROOF THIS IS |
| | COMPLETED OR NO LONGER REQUIRED HAS BEEN SUBMITTED. |
| | |
| | B. AT SUCH TIME AS THE PROPERTY OWNER COMPLETES THE |
| | DRAINAGE PLAN FOR THE PROJECT, THE PROPERTY OWNER SHALL |
| | NOTIFY THE COUNTY'S ROADWAY PRODUCTION DIVISION IF THE |
| | PROJECT HAS ANY EXCESS STORMWATER RETENTION CAPACITY |
| | THAT CAN BE MADE AVAILABLE TO THE COUNTY FOR THE |
| | WIDENING OF 45TH STREET FROM TWO (2) LANES TO FOUR (4) |
| | LANES FROM HAVERHILL ROAD TO THE FLORIDA TURNPIKE.IF |
| | THERE IS EXCESS CAPACITY AVAILABLE, THE PROPERTY OWNER |
| | SHALL MAKE THAT CAPACITY AVAILABLE TO THE COUNTY |
| | THROUGH THE DEDICATION OF A TWENTY FOOT (20') DRAINAGE |
| | EASEMENT FROM THE ROAD RIGHT-OF-WAY TO THE ULTIMATE |
| | OUTFALL.THE DRAINAGE EASEMENT SHALL COVER THE ENTIRE |
| | POND. NO PROOF THIS IS COMPLETED OR NO LONGER REQUIRED |
| | HAS BEEN SUBMITTED. |
| | |
| | C. NO MORE THAN 1,146 NEW DAILY TRIPS MAY BE PERMITTED |
| | UNTIL CONTRACT IS LET FOR WIDENING OF HAVERHILL ROAD TO |
| | FIVE (5) LANES, FROM 45TH STREET TO CARIBBEAN |
| | BOULEVARD. PROVIDE PROOF THAT THIS HAS BEEN RELEASED. |
| | |
| | D. NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE |
| | THAT 85 NEW EXTERNAL PM PEAK HOUR TRIPS PRIOR TO |
| | LETTING OF THE CONTRACT FOR THE FOUR (4) LANING OF |
| | HAVERHILL ROAD, FROM BEELINE HIGHWAY TO 45TH STREET. |
| | PROVIDE PROOF THAT THIS HAS BEEN RELEASED. |
| | |
| | E.NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE |
| | THAT 103 NEW EXTERNAL PM PEAK HOUR TRIPS PRIOR TO |
| | LETTING OF THE CONTRACT FOR THE FOLLOWING IMPROVEMENTS |
| | AT THE INTERSECTION OF HAVERHILL ROAD AND ROEBUCK ROAD: |
| | PROVIDE PROOF THAT THESE HAVE BEEN RELEASED. |
| | |
| | 1. ADDITION OF A SECOND EXCLUSIVE NORTHBOUND LEFT TURN |
| | LANE. |
| | |
| | 2. ADDITION OF A SECOND EXCLUSIVE EASTBOUND LEFT TURN |
| | LANE. |
| | |
| | 3. RECONFIGURE THE WESTBOUND APPROACH TO PROVIDE ONE |
| | EXCLUSIVE LEFT TURN LANE, TWO THROUGH LANES AND ONE |
| | EXCLUSIVE RIGHT-TURN LANE. |
| | |
| | F. NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE |
| | THAN 261 NEW EXTERNAL AM PEAK HOUR TRIPS PRIOR TO THE |
| | LETTING OF THE CONTRACT FOR THE ADDITION OF A SECOND |
| | NORTHBOUND THROUGH LANE AT THE INTERSECTION OF |
| | HAVERHILL ROAD AND 45TH STREET.NEW - THE LATEST |
| | TRAFFIC LETTER APPROVES 272 AM TRIPS, YET THE MOST |
| | RECENT TRAFFIC STATEMENT STATES THERE ARE 274 TRIP |
| | ASSOCIATED WITH THE FEDEXS AND BLDGS 1 & 3. |
| | |
| | G. WITHIN SIX (6) MONTHS FROM THE DATE OF THE |
| | DEVELOPMENT ORDER (DUE BY APRIL 10, 2007), THE |
| | DEVELOPER MUST ENTER INTO A PUBLIC FACILITIES AGREEMENT |
| | (PFA) WITH PALM BEACH COUNTY TO FUND AND/OR TO |
| | CONSTRUCT ANY AND ALL IMPROVEMENTS AS THE TERM IS |
| | DEFINED BY THE TRAFFIC PERFORMANCE STANDARDS ORDINANCE. |
| | THE PFA MUST BE IN A FORM ACCEPTABLE TO THE COUNTY |
| | ENGINEER.THE CITY SHALL NOT ISSUE ANY BUILDING |
| | PERMITS ASSOCIATED WITH THE PROJECT UNLESS AND UNTIL |
| | THE PFA HAS BEEN APPROVED BY THE BOARD OF COUNTY |
| | COMMISSIONERS.NEW - THE PROPORTIONATE FAIR SHARE |
| | AGREEMENT WAS PROVIDED, IS THIS THE SAME AS THE PFA? |
| | |
| | H. CORRECTED |
| | |
| | I. A TRAFFIC STATEMENT, PREPARED BY A LICENSED TRAFFIC |
| | ENGINEER, SHALL BE SUBMITTED TO THE PLANNING AND ZONING |
| | AND CONSTRUCTION SERVICES DEPARTMENTS CONCURRENT WITH |
| | ALL BUILDING PERMIT APPLICATIONS OUTLINING THE NUMBER |
| | OF DAILY TRIPS, AM TRIPS AND PM TRIPS GENERATED FOR |
| | EACH USE AND ITS SQUARE FOOTAGE FOR EACH BUILDING.THE |
| | TRAFFIC STATEMENT SHALL INCLUDE THE TRIPS ASSOCIATED |
| | WITH THE SPECIFIC USE AND A CUMULATIVE TABLE FOR ALL OF |
| | THE USES APPROVED IN THE PREMIER PARK OF COMMERCE CPD |
| | PARTIALLY ADDRESSED - COMBINE LETTER FROM FEDEXS AND |
| | BLDGS 1 & 3. |
| | |
| | 14) NEW - SITE/CIVIL PLANS DO NOT MATCH THE LANDSCAPE |
| | PLANS ALONG THE WESTERN ROW OF PARKING BASED ON |
| | REVISIONS MADE SINCE LAST REVIEW. |
| | |
| | 15) NEW - THE PARKING COUNT ON THE FRONT SHEET DOES NOT |
| | MATCH THE ACTUAL NUMBER OF PROVIDED ON THE SITE PLAN. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1435 |