| 2007-06-08 16:10:21 | FAILED |
| | |
| | 1) RESPOND TO COMMENTS IN WRITING. |
| | |
| | 2) DUMPSTER AND ADA PARKING DETAILS DO NOT MEET CITY |
| | CODE (SHEET A3) - REPEAT COMMENT. |
| | |
| | 3) WHERE IS THE LANDSCAPE AREA FOR THE LONE DUMPSTER |
| | BEHIND THE BUILDING - REPEAT COMMENT. |
| | |
| | 4) THE ELEVATIONS DO NOT MATCH THOSE APPROVED BY |
| | ORDINANCE NO. 3987-06. |
| | |
| | 5) SIGNS ARE TO BE UNDER A SEPARATE PERMIT. |
| | |
| | 6) WHERE IS THE LANDSCAPE PLAN? |
| | |
| | 7) THE 12 FOOT EASEMENT ALONG THE 45TH STREET FRONTAGE |
| | IS TO BE FOR FUTURE ROAD WIDENING, NOT UTILITY PURPOSES |
| | AS STATED ON THE SITE PLAN. |
| | |
| | 8) NOT ALL CONDITIONS OF ORD. NO. 3987-06 HAVE BEEN |
| | MET: |
| | |
| | A) THE PROPERTY OWNER SHALL POST SURETY IN THE AMOUNT |
| | OF ONE HUNDRED FIFTY THOUSAND DOLLARS ($150,000.00) |
| | WITHIN TWELVE (12) MONTHS OF THIS DEVELOPMENT ORDER |
| | (DUE BY OCTOBER 10, 2007) IN A FORM ACCEPTABLE TO THE |
| | COUNTY ATTORNEY TO ASSURE THE INSTALLATION OF THE |
| | TRAFFIC SIGNAL WHEN WARRANTED. |
| | |
| | B) AT SUCH TIME AS THE PROPERTY OWNER COMPLETES THE |
| | DRAINAGE PLAN FOR THE PROJECT, THE PROPERTY OWNER SHALL |
| | NOTIFY THE COUNTY?S ROADWAY PRODUCTION DIVISION IF THE |
| | PROJECT HAS ANY EXCESS STORMWATER RETENTION CAPACITY |
| | THAT CAN BE MADE AVAILABLE TO THE COUNTY FOR THE |
| | WIDENING OF 45TH STREET FROM TWO (2) LANES TO FOUR (4) |
| | LANES FROM HAVERHILL ROAD TO THE FLORIDA TURNPIKE.IF |
| | THERE IS EXCESS CAPACITY AVAILABLE, THE PROPERTY OWNER |
| | SHALL MAKE THAT CAPACITY AVAILABLE TO THE COUNTY |
| | THROUGH THE DEDICATION OF A TWENTY FOOT (20?) DRAINAGE |
| | EASEMENT FROM THE ROAD RIGHT-OF-WAY TO THE ULTIMATE |
| | OUTFALL.THE DRAINAGE EASEMENT SHALL COVER THE ENTIRE |
| | POND. |
| | |
| | C) NO MORE THAN 1,146 NEW DAILY TRIPS MAY BE PERMITTED |
| | UNTIL CONTRACT IS LET FOR WIDENING OF HAVERHILL ROAD TO |
| | FIVE (5) LANES, FROM 45TH STREET TO CARIBBEAN |
| | BOULEVARD. |
| | |
| | D) NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE |
| | THAT 85 NEW EXTERNAL PM PEAK HOUR TRIPS PRIOR TO |
| | LETTING OF THE CONTRACT FOR THE FOUR (4) LANING OF |
| | HAVERHILL ROAD, FROM BEELINE HIGHWAY TO 45TH STREET. |
| | |
| | E) NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE |
| | THAT 103 NEW EXTERNAL PM PEAK HOUR TRIPS PRIOR TO |
| | LETTING OF THE CONTRACT FOR THE FOLLOWING IMPROVEMENTS |
| | AT THE INTERSECTION OF HAVERHILL ROAD AND ROEBUCK |
| | ROAD: |
| | |
| | 1. ADDITION OF A SECOND EXCLUSIVE NORTHBOUND LEFT TURN |
| | LANE. |
| | |
| | 2. ADDITION OF A SECOND EXCLUSIVE EASTBOUND LEFT TURN |
| | LANE. |
| | |
| | 3. RECONFIGURE THE WESTBOUND APPROACH TO PROVIDE ONE |
| | EXCLUSIVE LEFT TURN LANE, TWO THROUGH LANES AND ONE |
| | EXCLUSIVE RIGHT-TURN LANE. |
| | |
| | F) NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE |
| | THAN 261 NEW EXTERNAL AM PEAK HOUR TRIPS PRIOR TO THE |
| | LETTING OF THE CONTRACT FOR THE ADDITION OF A SECOND |
| | NORTHBOUND THROUGH LANE AT THE INTERSECTION OF |
| | HAVERHILL ROAD AND 45TH STREET. |
| | |
| | G) WITHIN SIX (6) MONTHS FROM THE DATE OF THE |
| | DEVELOPMENT ORDER (DUE BY APRIL 10, 2007), THE |
| | DEVELOPER MUST ENTER INTO A PUBLIC FACILITIES AGREEMENT |
| | (PFA) WITH PALM BEACH COUNTY TO FUND AND/OR TO |
| | CONSTRUCT ANY AND ALL IMPROVEMENTS AS THE TERM IS |
| | DEFINED BY THE TRAFFIC PERFORMANCE STANDARDS ORDINANCE. |
| | THE PFA MUST BE IN A FORM ACCEPTABLE TO THE COUNTY |
| | ENGINEER.THE CITY SHALL NOT ISSUE ANY BUILDING |
| | PERMITS ASSOCIATED WITH THE PROJECT UNLESS AND UNTIL |
| | THE PFA HAS BEEN APPROVED BY THE BOARD OF COUNTY |
| | COMMISSIONERS. |
| | |
| | H)A USE CHART SHALL BE SUBMITTED TO THE PLANNING AND |
| | ZONING AND CONSTRUCTION SERVICES DEPARTMENTS CONCURRENT |
| | WITH ALL BUILDING PERMIT AND/OR OCCUPATIONAL LICENSE |
| | APPLICATIONS STATING THE SQUARE FOOTAGE DEVOTED TO THE |
| | USES WITHIN BUILDINGS 1, 2 AND 3.THE SPECIFIC SQUARE |
| | FOOTAGE USE WITHIN EACH BUILDING MAY NOT EXCEED THE |
| | ALLOWANCES OUTLINED IN THE BUILDING USE SQUARE FOOTAGE |
| | TABLE (EXHIBIT F), UNLESS THE PROPERTY OWNER PROVIDES A |
| | TRAFFIC EQUIVALENCY STATEMENT, PREPARED BY A LICENSED |
| | TRAFFIC ENGINEER, DEMONSTRATING THAT THE APPROVED |
| | TRAFFIC CONCURRENCY FOR THE PROJECT IS NOT EXCEEDED. |
| | |
| | I)A TRAFFIC STATEMENT, PREPARED BY A LICENSED TRAFFIC |
| | ENGINEER, SHALL BE SUBMITTED TO THE PLANNING AND ZONING |
| | AND CONSTRUCTION SERVICES DEPARTMENTS CONCURRENT WITH |
| | ALL BUILDING PERMIT APPLICATIONS OUTLINING THE NUMBER |
| | OF DAILY TRIPS, AM TRIPS AND PM TRIPS GENERATED FOR |
| | EACH USE AND ITS SQUARE FOOTAGE FOR EACH BUILDING.THE |
| | TRAFFIC STATEMENT SHALL INCLUDE THE TRIPS ASSOCIATED |
| | WITH THE SPECIFIC USE AND A CUMULATIVE TABLE FOR ALL OF |
| | THE USES APPROVED IN THE PREMIER PARK OF COMMERCE CPD. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1435 |