Date Text
2007-10-18 19:50:23FAILED
  
 1) RESPOND TO COMMENTS IN WRITING.
  
 2) ADA PARKING DETAILS DO NOT MEET CITY CODE (SHEET A3)
 - REPEAT COMMENT.THE DETAIL ON THE BOWYER SINGLETON
 PLANS SHEET 13 OF 29 IS CORRECT AND SHOULD BE USED.
 WHEEL STOPS AND HC SYMBOL LOCATIONS NEED CORRECTING ON
 A3.
  
 3) THE LANDSCAPE AREA FOR THE LONE DUMPSTER BEHIND THE
 BUILDING IS NOT SHOWN ON BOWYER SINGLETON PLANS SHEET 9
 OF 29 - PARTIAL REPEAT COMMENT.
  
 4) THE ELEVATIONS APPROVED BY ORDINANCE NO. 3987-06 AND
 SHOWN ON SHEET A6 DO NOT MATCH THE ELEVATIONS ON SHEET
 A7 AND THE SECTIONS SHOWN ON SHEETS A8 AND A14 -
 PARTIAL REPEAT COMMENT.
  
 A. THE DOORWAY TOWERS ON SHEET A6 DO NOT ALL HAVE THE
 SAME SCORE LINE IN LINE WITH THE ROOF - EASTERN MOST
 TOWER, AND TOWER SHOWN ON NORTH AND EAST ELEVATION.
  
 B. REVISION DELTA 3 WAS NOT MADE ON SHEET A7.
  
 C. USE ELEVATIONS AS SHOWN ON SHEET A6.
  
 D. SHEET A6 SHOWS CONCRETE MOLDING, BUT SECTIONS ON
 SHEET A8 SHOWS EIFS - THESE NEED TO SHOW SAME TYPE OF
 PRECAST.
  
 E. SHEET A8 SHOWS REVELS AT DIFFERENT SIZES THAN CALLED
 OUT ON SHEET A6 (4 INCH VS. 6 INCH).
  
 F. SHEET A8 (SECTION 4/A-8) DOES NOT SHOW THE MOLDING
 IN LINE WITH THE TOP OF THE BAHAMA SHUTTERS OR THE
 BAHAMA SHUTTERS THEMSELVES.
  
 G. SHEET A14 (SECTION DETAIL 3/A14) DOES NOT SHOW THE
 HORIZONTAL SCORE LINE THROUGH THE SQUARES AS THE
 ELEVATION SHOWN ON A6 DOES.
  
 H. WHERE ARE THE BAHAMA SHUTTER DETAILS.
  
 5) SHEET A1 SHALL SHOW ALL OF THE LATEST APPROVED
 REVISIONS TO THE OVERALL SITE PLAN.
  
 6) BOWYER SINGLETON SHEETS 3 AND 9 OF 29 ARE NOT THE
 MOST RECENT AS THEY STILL SHOW THE EASTERNMOST SIGN ON
 THE BUILDING #1 PARCEL, WHICH IS NOT APPROVED.
  
 7) D-CURBS OR WHEEL STOPS ARE REQUIRED ALONG ALL
 LANDSCAPE AREAS.THE PLANS SHALL CALL OUT ALL CURBING
 AS SUCH.
  
 8) A PHOTOMETRIC PLAN IS REQUIRED.THE ILLUMINATION
 SHALL NOT EXCEED ONE FOOT CANDLE AT THE BOUNDARY OF THE
 PLANNED DEVELOPMENT.
  
 9)MOST OF THE LIGHT POLES ARE WITHIN 5 FEET OF LIVE
 OAKS OR OTHER TREES.THE TREES OR THE LOCATION OF THE
 LIGHT POLES SHALL BE ADJUSTED SO THAT TREES TO NOT GROW
 INTO THE LIGHT POLES, MAKING THEM INEFFECTIVE.
  
 10) SOME OF THE FIRE HYDRANTS CONFLICT WITH THE TREE
 PLACEMENT.FIRE HYDRANTS MAY NOT BE LOCATED IN THE 12'
 WIDE FUTURE ROAD RIGHT-OF-WAY AREA.
  
 11) NO BUILDING PERMITS WILL BE ISSUED FOR BUILDING #1
 UNTIL UNTIL THE DEVELOPER FINALIZES THE PROPORTIONATE
 SHARE AGREEMENTS WITH PALM BEACH COUNTY.
  
 12) NOT ALL CONDITIONS OF ORD. NO. 3987-06 HAVE BEEN
 MET - REPEAT COMMENT.VERIFICATION FROM PALM BEACH
 COUNTY SHALL BE PROVIDED TO RELEASE THE TRAFFIC
 CONDITIONS.THE USE TABLE ITEMS HAVE NOT BEEN
 SUBMITTED.
  
 A. THE PROPERTY OWNER SHALL POST SURETY IN THE AMOUNT
 OF ONE HUNDRED FIFTY THOUSAND DOLLARS ($150,000.00)
 WITHIN TWELVE (12) MONTHS OF THIS DEVELOPMENT ORDER
 (DUE BY OCTOBER 10, 2007) IN A FORM ACCEPTABLE TO THE
 COUNTY ATTORNEY TO ASSURE THE INSTALLATION OF THE
 TRAFFIC SIGNAL WHEN WARRANTED.
  
 B. AT SUCH TIME AS THE PROPERTY OWNER COMPLETES THE
 DRAINAGE PLAN FOR THE PROJECT, THE PROPERTY OWNER SHALL
 NOTIFY THE COUNTY'S ROADWAY PRODUCTION DIVISION IF THE
 PROJECT HAS ANY EXCESS STORMWATER RETENTION CAPACITY
 THAT CAN BE MADE AVAILABLE TO THE COUNTY FOR THE
 WIDENING OF 45TH STREET FROM TWO (2) LANES TO FOUR (4)
 LANES FROM HAVERHILL ROAD TO THE FLORIDA TURNPIKE.IF
 THERE IS EXCESS CAPACITY AVAILABLE, THE PROPERTY OWNER
 SHALL MAKE THAT CAPACITY AVAILABLE TO THE COUNTY
 THROUGH THE DEDICATION OF A TWENTY FOOT (20') DRAINAGE
 EASEMENT FROM THE ROAD RIGHT-OF-WAY TO THE ULTIMATE
 OUTFALL.THE DRAINAGE EASEMENT SHALL COVER THE ENTIRE
 POND.
  
 C. NO MORE THAN 1,146 NEW DAILY TRIPS MAY BE PERMITTED
 UNTIL CONTRACT IS LET FOR WIDENING OF HAVERHILL ROAD TO
 FIVE (5) LANES, FROM 45TH STREET TO CARIBBEAN
 BOULEVARD.
  
 D. NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE
 THAT 85 NEW EXTERNAL PM PEAK HOUR TRIPS PRIOR TO
 LETTING OF THE CONTRACT FOR THE FOUR (4) LANING OF
 HAVERHILL ROAD, FROM BEELINE HIGHWAY TO 45TH STREET.
  
 E.NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE
 THAT 103 NEW EXTERNAL PM PEAK HOUR TRIPS PRIOR TO
 LETTING OF THE CONTRACT FOR THE FOLLOWING IMPROVEMENTS
 AT THE INTERSECTION OF HAVERHILL ROAD AND ROEBUCK
 ROAD:
  
 1. ADDITION OF A SECOND EXCLUSIVE NORTHBOUND LEFT TURN
 LANE.
  
 2. ADDITION OF A SECOND EXCLUSIVE EASTBOUND LEFT TURN
 LANE.
  
 3. RECONFIGURE THE WESTBOUND APPROACH TO PROVIDE ONE
 EXCLUSIVE LEFT TURN LANE, TWO THROUGH LANES AND ONE
 EXCLUSIVE RIGHT-TURN LANE.
  
 F. NO BUILDING PERMITS FOR DEVELOPMENT GENERATING MORE
 THAN 261 NEW EXTERNAL AM PEAK HOUR TRIPS PRIOR TO THE
 LETTING OF THE CONTRACT FOR THE ADDITION OF A SECOND
 NORTHBOUND THROUGH LANE AT THE INTERSECTION OF
 HAVERHILL ROAD AND 45TH STREET.
  
 G. WITHIN SIX (6) MONTHS FROM THE DATE OF THE
 DEVELOPMENT ORDER (DUE BY APRIL 10, 2007), THE
 DEVELOPER MUST ENTER INTO A PUBLIC FACILITIES AGREEMENT
 (PFA) WITH PALM BEACH COUNTY TO FUND AND/OR TO
 CONSTRUCT ANY AND ALL IMPROVEMENTS AS THE TERM IS
 DEFINED BY THE TRAFFIC PERFORMANCE STANDARDS ORDINANCE.
 THE PFA MUST BE IN A FORM ACCEPTABLE TO THE COUNTY
 ENGINEER.THE CITY SHALL NOT ISSUE ANY BUILDING
 PERMITS ASSOCIATED WITH THE PROJECT UNLESS AND UNTIL
 THE PFA HAS BEEN APPROVED BY THE BOARD OF COUNTY
 COMMISSIONERS.
  
 H. A USE CHART SHALL BE SUBMITTED TO THE PLANNING AND
 ZONING AND CONSTRUCTION SERVICES DEPARTMENTS CONCURRENT
 WITH ALL BUILDING PERMIT AND/OR OCCUPATIONAL LICENSE
 APPLICATIONS STATING THE SQUARE FOOTAGE DEVOTED TO THE
 USES WITHIN BUILDINGS 1, 2 AND 3.THE SPECIFIC SQUARE
 FOOTAGE USE WITHIN EACH BUILDING MAY NOT EXCEED THE
 ALLOWANCES OUTLINED IN THE BUILDING USE SQUARE FOOTAGE
 TABLE (EXHIBIT F), UNLESS THE PROPERTY OWNER PROVIDES A
 TRAFFIC EQUIVALENCY STATEMENT, PREPARED BY A LICENSED
 TRAFFIC ENGINEER, DEMONSTRATING THAT THE APPROVED
 TRAFFIC CONCURRENCY FOR THE PROJECT IS NOT EXCEEDED.
  
 I. A TRAFFIC STATEMENT, PREPARED BY A LICENSED TRAFFIC
 ENGINEER, SHALL BE SUBMITTED TO THE PLANNING AND ZONING
 AND CONSTRUCTION SERVICES DEPARTMENTS CONCURRENT WITH
 ALL BUILDING PERMIT APPLICATIONS OUTLINING THE NUMBER
 OF DAILY TRIPS, AM TRIPS AND PM TRIPS GENERATED FOR
 EACH USE AND ITS SQUARE FOOTAGE FOR EACH BUILDING.THE
 TRAFFIC STATEMENT SHALL INCLUDE THE TRIPS ASSOCIATED
 WITH THE SPECIFIC USE AND A CUMULATIVE TABLE FOR ALL OF
 THE USES APPROVED IN THE PREMIER PARK OF COMMERCE CPD.
  