| 2007-02-03 14:54:36 | DENIED; |
| | PLUMBING REVIEW COMMENTS ON 12/19/06 WERE NOT |
| | ADDRESSED; |
| | 1. (SECOND REQUEST) PAGE A-1.0 SANITARY PLUMBING PIPES |
| | TO BE REMOVED BACK TO THE BUILDING DRAIN. NO DEAD ENDS |
| | PERMITTED IN THE DRAINAGE SYSTEM. FBC-2004 PLUMBING |
| | SECTION704.5. ADD NOTE TO DEMO PLAN "ALL PLUMBING DEMO |
| | WORK TO BE DONE BY A LICENSED PLUMBING CONTRACTOR |
| | PERMIT AND INSPECTIONS REQUIRED". |
| | 2. (SECOND REQUEST) PAGE A-3.0 SANITARY RISER DIAGRAM. |
| | FUTURE SINKBRANCH DRAIN TO BE INSTALLED DOWN STREAM |
| | OF THE BATHROOM GROUO. SECTION 909.1. |
| | 3. (SECOND REQUEST) PER TABLE 403.1 (6) M MINIMUM |
| | NUMBER OF FIXTURES REQUIRED, A DRINKING FOUNTAINIS |
| | REQUIRED. THE DRINKING FOUNTAIN MUST MEET THE |
| | REQUIREMENTS OF FBC-2004 BUILDING CHAPTER 11 SECTION |
| | 11-4.1.3(10) HANDICAP AND FOR PEOPLE WITH BAD BACKS. |
| | SECTION 11-4.15.2 SPOUT HEIGHT, 11-4.15.3 SPOUT |
| | LOCATION, 11-4.15.4 CONTROLS, AND 11-4.15.5 CLEARANCES. |
| | SHOW ELEVATION ON DRAWINGS. |
| | 4. (SECION REQUEST) PAGE A-3.0 WATER RISER DIAGRAM AIR |
| | CHAMBERS ARE NOT AN ENGINEER PRODUCT. REMOVE THE PLANS. |
| | WATER HAMMER ARRESTORS CAN BE INSTALLED AS REQUIRED PER |
| | SECTION 604.9 LIST MANUFACTURE AND MODEL NUMBER. WATER |
| | HAMMER ARRESTORS ARE TO BE INSTALL PER MANUFACTURE |
| | INSTALLATION INSTRUCTIONS AS CLOSE TO THE FIXTURE AS |
| | PERMITED NOT IN THE CEILING. |
| | 5. (NEW COMMENTS) PLANS ARE BEING REVIEWED UNDER THE |
| | 2004 CODE CORRECT UNDER GENERAL NOTES. |
| | 6. (NEW COMMENT) PAGE A-3.0 BATHROOM WALL FINISH PAINT |
| | IS NOT A HARD SURFACE. SEE 2004 BUILDING SECTION |
| | 12.10.2 |
| | PLUMBING PLAN REVIEW BY; |
| | JOHN LEECH |
| | 805-6695 |