Plan Review Notes
Plan Review Notes For Permit 06110144
Permit Number 06110144
Review Stop B
Sequence Number 2
Notes
Date Text
2007-01-11 10:19:48BUILDING PLAN REVIEW
 PERMIT: 06110144
 ADD: 500 AUSTRALIAN AVE SUITE# 910
 CONT: KARL CORP CONSTRUCTION SERVICES
 TEL: (561)718-3799
 FL BLD CODE= 2004 FLORIDA BUILDING CODE
 * WEST PALM BEACH AMENDMENTS
  
 1STREVIEW
 ACTION: DENIED
  
 1)--- VERY IMPORTANT STATEMENT ---
 PLEASE DO NOT IGNORE!
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUM-
 BER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICA
 TION PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. THANK
 YOU FOR YOUR ANTICIPATED COOPERATION.
  
 2) NOT CAUGHT ON THE FIRST REVIEW SEE SHEET
 M-1 STAIR TOWER # 1.
 1019.1.2 PENETRATIONS.
 PENETRATIONS INTO AND OPENINGS THROUGH AN EXIT
 ENCLOSURE ARE PROHIBITED EXCEPT FOR REQUIRED EXIT
 DOORS, EQUIPMENT AND DUCTWORK NECESSARY FOR INDEPENDENT
 PRESSURIZATION, SPRINKLER PIPING, STANDPIPES,
 ELECTRICAL RACEWAY FOR FIRE DEPARTMENT COMMUNICATION
 AND ELECTRICAL RACEWAY SERVING THE EXIT ENCLOSURE AND
 TERMINATING AT A STEEL BOX NOT EXCEEDING 16 SQUARE
 INCHES (0.010 M 2 ). SUCH PENETRATIONS SHALL BE
 PROTECTED IN ACCORDANCE WITH SECTION 712 . THERE SHALL
 BE NO PENETRATIONS OR COMMUNICATION OPENINGS, WHETHER
 PROTECTED OR NOT, BETWEEN ADJACENT EXIT ENCLOSURES.
  
 1019.1.3 VENTILATION.
 EQUIPMENT AND DUCTWORK FOR EXIT ENCLOSURE VENTILATION
 SHALL COMPLY WITH ONE OF THE FOLLOWING ITEMS:
 1.SUCH EQUIPMENT AND DUCTWORK SHALL BE LOCATED
 EXTERIOR TO THE BUILDING AND SHALL BE DIRECTLY
 CONNECTED TO THE EXIT ENCLOSURE BY DUCTWORK ENCLOSED IN
 CONSTRUCTION AS REQUIRED FOR SHAFTS.
 2.WHERE SUCH EQUIPMENT AND DUCTWORK IS LOCATED
 WITHIN THE EXIT ENCLOSURE, THE INTAKE AIR SHALL BE
 TAKEN DIRECTLY FROM THE OUTDOORS AND THE EXHAUST AIR
 SHALL BE DISCHARGED DIRECTLY TO THE OUTDOORS, OR SUCH
 AIR SHALL BE CONVEYED THROUGH DUCTS ENCLOSED IN
 CONSTRUCTION AS REQUIRED FOR SHAFTS.
 3.WHERE LOCATED WITHIN THE BUILDING, SUCH
 EQUIPMENT AND DUCTWORK SHALL BE SEPARATED FROM THE
 REMAINDER OF THE BUILDING, INCLUDING OTHER MECHANICAL
 EQUIPMENT, WITH CONSTRUCTION AS REQUIRED FOR SHAFTS.
 IN EACH CASE, OPENINGS INTO THE FIRE-RESISTANCE-RATED
 CONSTRUCTION SHALL BE LIMITED TO THOSE NEEDED FOR
 MAINTENANCE AND OPERATION AND SHALL BE PROTECTED BY
 SELF-CLOSING FIRE-RESISTANCE-RATED DEVICES IN
 ACCORDANCE WITH CHAPTER 7 FOR ENCLOSURE WALL OPENING
 PROTECTIVES.
 EXIT ENCLOSURE VENTILATION SYSTEMS SHALL BE INDEPENDENT
 OF OTHER BUILDING VENTILATION SYSTEMS.
  
 BUILDING PLAN REVIEW
 JIM WITMER C. B. O.
  
 TEL: (561)805-6715
 FAX: (561)659-8026
 E-MAIL: [email protected]
  