| Plan Review Notes For Permit 06101156 |
| Permit Number |
06101156 |
|
| Review Stop |
ENG |
| Sequence Number |
7 |
|
| Notes |
| Date |
Text |
| 2009-11-30 14:48:14 | PLANS ARE APPROVED AS-NOTED THRU ESD DATED 11/30/09 | | | 1) FOR EACH INLET , PROVIDE A 12" DIA WEEP HOLE AS | | | SHOWN ON THE DETAIL ON SHT 3 OF 3. UNDER THE WEEP HOLE | | | INSTALL HARDWARE CLOTH (SS) ON | | | 2' X 2' X 6" OF WASHED ROCK WRAPPED ALL AROUND WITH | | | FABRIC. | | | 2) FOR EACH INLET , PROVIDE A POLLUTION CONTROL BAFFLE | | | (PCB) AT EACH PIPE OUTLET TO EXFILTRATION TRENCH (6 | | | TOTAL ). | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | ENGINEERING SERVICES DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | MOBILE: (561) 644-7301 | | | EMAIL: [email protected] | | | WWW.WPB.ORG/ENGINEERING | | | |
|