| Date |
Text |
| 2007-01-03 09:53:04 | DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 FUEL GAS |
| | FBC-2004 CHAPTER 1 |
| | FBC-2004 CHAPTER 11 |
| | |
| | 1. SHT C-1 INDICATES "NEW CONVENIENCE STORE/PROPOSED |
| | BUILDING", BUT NOTES ON SHT A-1 INDICATE AN EXISTING |
| | BUILDING. PLEASE CLARIFY. SECTION 106.1.1. |
| | |
| | 2. SUBMIT A DETAIL FOR THE TOILET ROOM. SHOW COMPLIANCE |
| | WITH SECTIONS 11-4.16, 11-4.19, 11-4.22 AND ALL |
| | SUBSECTIONS. |
| | |
| | 3. A GREASE INTERCEPTOR MAY BE REQUIRED. PLEASE CONTACT |
| | LYNN MASSON, ENVIRONMENTAL COMPLIANCE MANAGER, PHONE |
| | NUMBER (561) 822-2271, FAX (561) 822-2279, OR E-MAIL |
| | [email protected]. WASTE ORD. 3434. |
| | |
| | 4. PER TABLE 403.1 A DRINKING FOUNTAIN IS REQUIRED. |
| | PLEASE INDICATE THE LOCATION ON THE FLOOR PLAN. SUBMIT |
| | A DETAIL SHOWING COMPLIANCE WITH SECTION 11-4.15 AND |
| | ALL SUBSECTIONS AS WELL AS SECTION 11-4.1.3(10)(A) |
| | PROVISIONS FOR THOSE WHO HAVE DIFFICULTY BENDING OR |
| | STOOPING. SHOW DRINKING FOUNTAIN ON THE SANT. AND WATER |
| | RISER DIAGRAMS. |
| | |
| | 5. SHT A-1 GENERAL NOTES #1. THE CODE ADOPTED IS |
| | FBC-2004 NOT FBC-2001 AS INDICATED. PLEASE UPDATE YOUR |
| | NOTES TO REFLECT THE CODE IN EFFECT. |
| | |
| | 6. SHT P-1THE SANITARY PLUMBING RISER DOES NOT MEET |
| | CODE. HORIZONTAL DRY VENTS ARE NOT APPROVED. SECTION |
| | 905.3. - THE 3" VENT UPSTREAM OF THE W/C IS NOT |
| | REQUIRED. THE 2" VENT AT THE LAV IS SUFFICIENT. |
| | |
| | 7. SHT P-1 THE GREASE PLUMBING RISER DOES NOT MEET |
| | CODE. THE 3 COMPARTMENT SINK AND THE HAND SINK ARE NOT |
| | VENTED. (MISLABELED AS LAVS). ALSO EQUIPMENT AND |
| | FIXTURES UTILIZED FOR THE STORAGE, PREPARATION AND |
| | HANDLING OF FOOD SHALL DISCHARGE THROUGH AN INDIRECT |
| | PIPE BY MEANS OF AN AIR GAP. (A FLOOR SINK WOULD BE |
| | REQUIRED). SECTIONS 802.1.1 AND 901.2.1. |
| | |
| | 8. SUBMIT A WATER RISER DIAGRAM. SHOW ALL PIPE SIZES, |
| | VALVES, AND REQUIRED WATER HAMMER ARRESTORS, (ICE |
| | MACHINE). SECTIONS 106.3.5.1.3 & 604.9. |
| | |
| | 9. AN RPZV BACKFLOW IS REQUIRED ON THE WATER SERVICE TO |
| | THE BUILDING. SECTION 608.13.2. |
| | |
| | 10. SHT A-1 INDICATES GAS EQUIPMENT IN THE KITCHEN. A |
| | SEPARATE GAS PERMIT IS REQUIRED. SUBMIT THE FOLLOWING |
| | INFORMATION: |
| | |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. |
| | |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE IF BEING USED. |
| | |
| | C. TYPE OF GAS, (LP OR NATURAL). |
| | |
| | D. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). |
| | |
| | E. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | |
| | F. SUBMIT CALCULATIONS FOR COMBUSTION |
| | AIR (IF APPLICABLE) PER FBC-2004 FUEL |
| | GAS CODE SECTION 304. |
| | |
| | G. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. IF 2 PSI SHOW THE |
| | LOCATION OF THE REGULATORS, SUBMIT MANUF. |
| | SPECIFICATIONS FOR THE REGULATORS AND IF THE REGULATORS |
| | ARE VENTED, INDICATE THE MATERIAL OF THE VENT AND SHOW |
| | THE PIPING LOCATION. |
| | |
| | H. SUBMIT A DETAIL SHOWING THE TYPE, |
| | LOCATION, SIZE AND TERMINATION OF THE |
| | GAS VENTS PER FBC-2004 FUEL GAS CODE |
| | SECS. 502 THRU 505. |
| | |
| | I. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | |
| | J. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | |
| | K. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES |
| | PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | |
| | L. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| | VALVE TO BE BELOW CEILING. MANUAL SHUT |
| | OFF VALVE TO BE UPSTREAM. UNION TO BE |
| | DOWN STREAM OF MANUAL VALVE. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |