| 2006-11-17 15:51:48 | I REVIEW ONLY THE FOLLOWING.SOPLEASE PROVIDE |
| | FOLLOWING INFO FOR COMPLETE REVIEW: |
| | 1.NEEDS SEAL & SIGN FOR ALL CIVIL DWGSBYP.E.AS |
| | YOU PROVIDED |
| | 2. PLEASE SHOW STANDARDS NOTES OF CITY OF WPB ON |
| | DRAWINGSFOR SIDEWALK WIDTH , ITS SLOPE, DRIVEWAY, |
| | PARKING, HANDICAP PARKING, PAINTPER CITY CODES ETC.,, |
| | MUST MEET PER ADA,,ETC., |
| | 3. PLEASE SHOW ON DRAWINGSDUMPSTER & ITS ENCLOSURE |
| | DETAILS PER CITY OF WPB, &LOCATION ON DWG, LOCATION |
| | MUST BE ACCESSIBLE FOR PICKUP TRUCK. |
| | 4. FIRST FLOOR ELEVATION, CENTER LINE OF ROAD , |
| | SIDEWALK ELEVATION MUST MEET FL BLDG CODE, PLEASE SHOW |
| | ON THE DRAWINGS. |
| | 5. PLEASE PROVIDE A COPY OF SFWMD PERMIT,& GEOTECHNICAL |
| | REPORT |
| | 6.PLEASE SHOW STORM WATER CALCULATIONS, WHAT CRITERIA |
| | YOU ASSUMEDFOR RUNOFF CAL.,, LIKE 1" OVER ENTIRE SITE |
| | OR2.5"CRITERIA, ?PERVIOUS AREA, LIKE GREEN, |
| | LAKES, ETC,IMPERVIOUS AREA CAL., |
| | 7. WHAT IS THE SITE AREA, YOU ARE DEVELOPING FOR THIS |
| | PROJECT ONLY ? SO, WE CAN CHECK PERVIOUS, IMPERVIOUS |
| | CAL. |
| | 8. HOW YOU CONNECT TO THE STORM WATER PIPES IN YOUR |
| | SITE? ITS DETAILS.PLEASE SHOW ALL STORM WATER PIPES |
| | AROUND YOUR SITE SO, WE CANSEE THE BEST PIPE TO |
| | CONNECT WITH THE STORM WATERFROM ALL OTHER STORM |
| | WATER PIPES. PLEASE SHOW DETAIL OF THE CONTROL |
| | STRUCTURES WITH ELEVATIONS, NOTCHES, BLEEDING |
| | ELEVATION, ETC DID YOU USE EXFILTRATION TRENCH ? |
| | 9. POLLUTION PREVENTION DETAILS,CLOTHES USED FOR SILT |
| | ETC., PLANS SHOWING SILT FENCE AROUND THE SITE |
| | 10. WATER & SEWER PLANS MUST BE APPROVED FROM 45TH |
| | STREET (MANNY G.), UTILITY DEPT BEFORE WE APPROVED |
| | 11. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| | YOUR SITE FOR STORM WATER DRAIN. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |