| Plan Review Notes For Permit 06101137 |
| Permit Number |
06101137 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2006-12-07 11:36:16 | DENIED | | | REFERENCE: FBC-2004 CHAPTER 4 SECTION 424.1 | | | | | | 1. SHT 7 OF 10. INDICATE THE LOCATION OF THE SPA JETS. | | | (6 INDICATED ON THE SCHEDULE). SECTION 106.1.1. | | | | | | 2. SHT 8 OF 10. INDICATE THE LOCATION OF THE HOSE BIBB | | | REQUIRED IN THE EQUIPMENT ROOM. SECTION 424.1.5.9. | | | | | | 3. SHT 8A OF 10. OVERFLOW FROM THE POOL AND SPA | | | COLLECTING TANKS SHALL CONNECT TO THE STORM SYSTEM, NOT | | | THE SANITARY. PLEASE INDICATE ON THE PLANS. | | | | | | 4. A SOLAR BLANKET WILL BE REQUIRED PER SECTION | | | 13-612.1.ABC.2.3.2. - MANUF. SPECIFICATION SHEETS DO | | | NOT INDICATE IF THE REQUIREMENT CAN BE EXEMPT FROM THIS | | | REQUIREMENT. (SEE SECTION BELOW). | | | | | | 13-612.1.ABC.2.3.2 COVERS REQUIRED. | | | SPAS AND HEATED SWIMMING POOLS SHALL BE EQUIPPED WITH A | | | COVER DESIGNED TO MINIMIZE HEAT LOSS. | | | EXCEPTION : OUTDOOR POOLS DERIVING OVER 70 PERCENT OF | | | THE ENERGY FOR HEATING FROM NONDEPLETABLE ON | | | SITE-RECOVERED SOURCES COMPUTED OVER AN OPERATING | | | SEASON ARE EXEMPT FROM THIS REQUIREMENT. | | | | | | REVIEW BY KEN STEVENS | | | (561) 805-6721 | | | FAX (561) 805-6731 | | | E-MAIL [email protected] |
|