| Date |
Text |
| 2006-11-05 08:23:11 | **** UNSAT **** |
| | |
| | 1) NOTE: PLEASE INCLUDE THE FOLLOWING CODES ALSO |
| | RELEVANT TO DESIGN. |
| | 2003 NFPA-101 AND POSSIBLE NFPA-72 2002. |
| | |
| | 2) NOTE: PLEASE SEE LUNCH ROOM ON FIRST FLOOR WHICH |
| | APPEARS TO SHOW COUNTER SPACE IN FRONT OF ALL THE |
| | ELECTRICAL PANELS ON THE FIRST FLOOR? PLEASE SEE |
| | 110.26, IF THIS CONDITION EXISTS THESE WILL BE REQUIRED |
| | TO BE REMOVED. |
| | 110.26 |
| | |
| | 3) NOTE: PLEASE VERIFY ROOMS BEING SHOWN AS SERVER/IT |
| | ROOMS? PLEASE SEE NFPA-75 AND PLEASE SEE NEC 645.10 |
| | ETC. |
| | PLEASE PROVIDE A BREAK DOWN OF ROOM AND EQUIPMENT BEING |
| | INSTALLED. PLEASE SUBMIT ALL MANUFACTURE SPECS/CUT |
| | SHEETS FOR THE EQUIPMENT BEING INSTALLED IN THESE |
| | ROOMS. |
| | 110.3, 90.7. |
| | |
| | 4) NOTE: PLEASE VERIFY NEW OR EXISTING REQUIRED |
| | CIRCUITS PER 620.23, 620.24 |
| | |
| | 5) NOTE: PLEASE KNOW SOME SORT OF BATTERY BACK UP |
| | FIXTURES FOR THE FOLLOWING ROOMS WILL BE REQUIRED IF |
| | NOT EXISTING.( ELEVATOR EQUIPMENT ROOM, AND NEW |
| | ACCESSIBLE BATHROOMS. PLEASE ALSO SEE ANY FIRE REVIEW |
| | COMMENTS WHICH MAY ALSO REQUIRE FIXTURES TO BE ADDED TO |
| | PROVIDE ADEQUATE COVERAGE FOR LIFE SAFETY PER LS 101 |
| | 7.8, 7.9. |
| | |
| | 6) NOTE: PLEASE SEE NOTES ON PLANS MENTIONS COMPLIANCE |
| | WITH CHAPTER 13, PLEASE SUBMIT THE SPECS AND SHOW |
| | DETAIL ON THE PROPOSED SYSTEM WHICH IS BEING INSTALLED. |
| | PLEASE SEE SOME LARGER AREAS SEEM TO BE USING AN M |
| | SWITCH (WAREHOUSE ETC) WHICH DOES NOT SEEM TO PROVIDE |
| | COVERAGE? PLEASE ALSO INDICATE OVER RIDE TIMES ON THE |
| | TYPE OF DEVICES BEING INSTALLED. (MOTION/OCCUPANT TYPE |
| | SENSORS 30MINS MAX, TIMER TYPE 4HRS MAX ON OVER RIDES.) |
| | 13-415.1.ABC.1.1, .1.2, .1.3. |
| | PLEASE SEE NOTE MENTIONS TO MEET WATTAGE USAGE HOWEVER |
| | THIS WOULD NEED TO BE SHOWN AT THIS TIME. |
| | PLEASE SEE 13?415.2.ABC.1, TABLES 415.2.C.1 |
| | |
| | 7) NOTE: PLEASE SEE FIRST FLOOR LUNCH ROOM WHICH |
| | MENTIONS TO INSTALL NEW LIGHTING PANEL "IL", HOWEVER A |
| | 2ND PANEL IS BEING SHOWN, BUT NO DESIGNATION IS BEING |
| | SHOWN? |
| | PLEASE COMPLETE. |
| | FBC 106.1.2 ADMIN SECT. |
| | |
| | 8) NOTE: PLEASE SEE TWO PANELS "TNT" SHOWN ON RISER, |
| | HOWEVER THESE ARE NOT BEING FED FROM ANYWHERE? UNABLE |
| | TO REVIEW AT THIS TIME. |
| | FBC 106.1.2, NEC 215.5, 240.4, 310.16. |
| | |
| | 9) NOTE: PLEASE SUBMIT AND COMPLETE LOAD CALCULATIONS. |
| | PLEASE SEE MDP WHICH DOES NOT INDICATE ALL LOADS, ONLY |
| | THE TWO NEW PANELS. THE LOAD SUMMARY ON THE RISER SHEET |
| | WAS NOTED, HOWEVER ALL LOADS FOR NEW AND EXISTING |
| | SHOULD BE INCLUDE ON THE NEW PROPOSED MDP. |
| | 220, 215.3, 230.42 ETC. |
| | |
| | 10) NOTE: PLEASE INDICATE ALL CONTINUOUS LOADS AT |
| | 125%. |
| | 215.3, 230.42 ETC. |
| | |
| | 11) NOTE; PLEASE SEE POSSIBLE MISPRINT FOR THE MDP, |
| | SHOWS 1220 MLO IN ONE LOCATION, HOWEVER SHOW 120- MLO |
| | IN ANOTHER. (REDLINED ON ONE SET OF PLANS) |
| | |
| | 12) NOTE: PLEASE PROVIDE ALL ROOM AND AREA DESIGNATIONS |
| | ON ELECTRICAL PLANS. PLEASE CORRELATE WITH CIRCUITING |
| | ON PANEL SCHEDULES. ROOM "X", CIRCUIT # 23, ETC. FCB |
| | 106.1.2, NEC 408.4, ETC |
| | |
| | 13) NOTE: PLEASE SEE VERIFY MODULAR FURNITURE BEING |
| | SHOWN WITH 50A OCP ON #6 AWG?? PLEASE SUPPLY |
| | MANUFACTURE SPECS/CUT SHEETS FOR THESE AS THIS TYPE OF |
| | FURNITURE AT THIS SIZE AND LOAD AHS NOT BEEN SEEN |
| | BEFORE. PLEASE SEE 210.21(B)3. |
| | |
| | 14) NOTE: PLEASE SEE POSSIBLE FIRE REVIEW COMMENTS AND |
| | VERIFY IF THERE IS A FA SYSTEM IN BUILDING OR ONE GOING |
| | TO BE PROPOSED? |
| | PLEASE KNOW, IF ONE IS GOING TO BE INSTALLED, PLEASE |
| | SEE FBC 11-4.28.2, 11-4.28.3(4) FOR MINIMUM LEVELS TO |
| | BE SHOWN FOR AUDIBLE AND VISUAL. |
| | |
| | 15) NOTE: PLEASE SEE NEW PANEL SCHEDULE FOR MDP WHICH |
| | SHOWS TWO "F1" PANELS? PLEASE SEE THE TWO NEW PANELS |
| | BEING PROPOSED DO NOT SEEM TO CORRELATE WITH THE SAME |
| | DESIGNATIONS. |
| | 408.4, |
| | FBC 106.1.2 |
| | |
| | 16) NOTE: PLEASE SEE VALUE FOR COMPLETE SCOPE OF WORK |
| | SEEMS LOW. THIS VALUE SHALL BE BASED ON ALL LABOR AND |
| | MATERIALS EVEN IF ANY MATERIALS OR EQUIPMENT IS BEING |
| | OWNER SUPPLIED. PLEASE KNOW, IF AN APPROPRIATE VALUE IS |
| | NOT ADJUSTED, ONE WILL BE ADJUSTED BY THE TABLES FROM |
| | THE FBC. |
| | FBC 108.3 ADMIN SECTION AS ADOPTED BY THE CITY OF WEST |
| | PALM BEACH USING THE MARSHAL'S & SWIFT GUIDE AT A MIN |
| | AND TABLES AS SET-FORTH IN THE BLDG CODE. |
| | |
| | 17) NOTE: PLEASE SEE MDP/ MLO, WHICH SHOWS A FEED TO A |
| | HOUSE PANEL AS 100A, YET ON RISER THE "H" PANEL IS |
| | SHOWN WITH 3/0'S , YET THERE IS AND PANEL WITH A ??? , |
| | WHICH INDICATES A 225A PANEL WITH #3'S?? |
| | PLEASE CORRELATE. |
| | 240.4, 310.16 ETC. |
| | |
| | 18) NOTE: PLEASE SEE PANEL MDP WHICH IS BEING SHOWN AS |
| | MLO, CONTAINS MORE THAN SIX SPACES WHICH IS NOT |
| | PERMITTED. PLEASE SEE THERE IS POSSIBILITY OF AN |
| | ADDITIONAL 3 SP BREAKERS OR A 2P AND 1P BRKR BEING |
| | INSTALLED WHICH WOULD CREATE MORE THAN 6 MEANS OF |
| | DISCONNECT. PLEASE SEE 230.70, 230.71, 230.72 PLEASE |
| | INSTALLEDA 1200A MCB IN PANEL OR NOTE AND BE SURE THE |
| | ADDITIONAL SPACE IS SHIPPED AND MANUFACTURED WITH A |
| | PERMANENT DEAD FRONT WHICH WILL NOT PERMIT ADDITIONAL |
| | BREAKERS TO BE INSTALLED. |
| | |
| | |
| | ** PLEASE KNOW AT THIS TIME, THERE ARE ITEMS NOT YET |
| | SHOWN WHICH CAN NOT BE REVIEWED AT THIS TIME WHICH MAY |
| | CREATE NEW COMMENTS ON NEXT REVIEW. |
| | |
| | * ** IMPORTANT** |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| | PICKED UP FOR CORRECTIONS, PLEASE BE |
| | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| | SHEETS AND ONLY INSERT NEW REVISED |
| | SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| | AND STAMPING. DO NOT LEAVE ANY |
| | OLD/VOIDED SHEETS IN SETS. |
| | PLEASE KNOW ONLY ONE SET OF THE |
| | OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| | FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND |
| | AVOID ANY DELAYS. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE DO NOT HESITATE TO CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |
| | |
| 2006-11-05 07:06:57 | REVIEW IN PROGRESS |
| 2006-11-05 07:06:33 | IN ELEC FOR REVIEW,,, |