Plan Review Notes
Plan Review Notes For Permit 06101056
Permit Number 06101056
Review Stop E
Sequence Number 3
Notes
Date Text
2007-06-19 15:06:17*** UNSAT 3RD REVIEW ***
  
 1) NOTE: PLEASE SEE THE ENERGY CALCULATIONS ARE NOW
 SUBMITTED WITHOUT THE INPUT DATA REPORTS SHEETS WHICH
 ARE REQUIRED. PLEASE SEE STATEMENT ON COVER SHEET EVEN
 MENTIONS THIS.
 FBC 113-415.1.C.
  
 2) NOTE: PLEASE SEE THE FA NOTE NOW MENTIONS THE CODE
 SECTION HOWEVER IT DOES INDICATE THE MINIMUM LEVELS AS
 NEEDED. MAY NOT QUOTE THE CODE IN LIEU OF THE SPECIFIC
 REQUIREMENT.
 FBC 11-4.28.1,.2, AND .3(4).
  
 3) NOTE: PLEASE SEE PLANS NOW INDICATE A NEW 6-POLE
 CONTACTOR AND LIGHTING CONTROLS HOWEVER NO DETAILS FOR
 THIS IS SHOWN ON PLANS. NO TIME FOR SCHEDULING, NO
 TIMES FOR OVER RIDE DEVICES, NO TIMES ON DEVICES WHERE
 COMPLIANCE WITH FBC CHAPTER 13 IS BEING NOTED.
 PLEASE CLARIFY AND PROVIDE MORE INFORMATION.
  
 4) NOTE: PLEASE SEE THE PREVIOUS TITLE BLOCKS CONTAINED
 PRINTED NAME AND PRINTED LICENSE NUMBER OF THE ENGINEER
 HOWEVER IT WAS IN THE *PRINTED SEAL* WHICH WAS PLACED
 ON PLANS IN LIEU OF THE RAISED SEAL. NOW PLANS ARE
 COMING BACK WITHOUT THE PRINTED SEAL AND ONLY THE
 PRINTED NAME IS SHOWN. PLEASE BE SURE THE PRINTED
 LICENSE NUMBER IS ON PLANS. FAC 61G15-23.002
 PLEASE ALSO CLARIFY WHY THE EXPIRATION DATE FROM FEB 07
 IS BEING SHOWN ON TITLE BLOCKS UNDER ENGINEERS SEAL. AS
 THE EXPIRATION DATE HAS SINCE PAST THIS WOULD NOT BE
 VALID. THIS LICENSE HAS BEEN VERIFIED WITH THE STATE AS
 NOT EXPIRED ON THIS DATE AS NOTED.
  
  
 ** PLEASE SEE ANY POSSIBLE COMMENTS FROM OTHER TRADES
 WHICH MAY AFFECT ELECTRICAL PLANS.
  
 ** IMPORTANT**
 ONCE ALL REVIEWS ARE DONE AND PLANS ARE
 PICKED UP FOR CORRECTIONS, PLEASE BE
 SURE TO COMPLETELY REMOVE ALL OLD/VOIDED
 SHEETS AND ONLY INSERT NEW REVISED
 SHEETS INTO TWO COMPLETE SETS FOR REVIEW
 AND STAMPING. DO NOT LEAVE ANY
 OLD/VOIDED SHEETS IN SETS.
 PLEASE KNOW ONLY ONE SET OF THE
 OLD/VOIDED SHEETS SHOULD BE SUBMITTED
 FOR REFERENCE.
 THIS WILL HELP IN THE REVIEW PROCESS AND
 AVOID ANY DELAYS.
  
 ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR
 COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF
 THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY,
 NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO
 NOT HESITATE IN CONTACTING THIS OFFICE AND THIS
 REVIEWER.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPT.
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved