| 2007-02-16 14:27:51 | PLEASE PROVIDE FOLLOWING INFO: |
| | |
| | 1. STANDARD NOTES OF CITY OF WPB ARE MINIMUM STANDARDS. |
| | YOU CAN UPGRADE CITY'S STANDARDS BUT, STILL WE WOULD |
| | LIKE YOU TO SAY ON THE DRAWING THAT YOU WILL MEET |
| | MINIMUM CITY'S STANDARDS FOR SIDEWALK WIDTH , ITS |
| | SLOPE, DRIVEWAY, PARKING, HANDICAP PARKING, PAINT ETC. |
| | PER CITY CODES OR BETTER APPROVED BY THE CITY., MUST |
| | MEET PER ADA,,ETC., |
| | 2.DUMPSTER LOCATION MUST BE ACCESSIBLE FOR PICKUP |
| | TRUCK. |
| | 3. PLEASE PROVIDE A COPY OF SFWMD PERMIT OR MODIFIED |
| | PERMIT, |
| | 4. YOU SAID IN YOUR RESPONSE THAT YOU SENT STORM WATER |
| | CALCULATION TO WINDEL PALMER. WINDEL PALMER DOES NOT |
| | REVIEW STORM WATER. EITHER MYSELF OR STEVE SARLEY |
| | REVIEW STORM WATER. I TALKED TO STEVE SARLEY HE DOES |
| | NOT HAVE STORM WATER CALCULATION FOR THIS PROJECT. |
| | PLEASE PROVIDE STORM WATER CALCULATIONS FOR WATER |
| | QUALITY. WHAT CRITERIA YOU ASSUMEDFOR RUNOFF CAL.,, |
| | LIKE 1" OVER ENTIRE SITE OR2.5"CRITERIA, ? |
| | PERVIOUS AREA, LIKE GREEN, LAKES, ETC,IMPERVIOUS AREA |
| | CAL., |
| | 5. WHAT IS THE SITE AREA, YOU ARE DEVELOPING FOR THIS |
| | PROJECT ONLY ? SO, WE CAN CHECK PERVIOUS, IMPERVIOUS |
| | CAL. |
| | 6. PLEASE SHOW DETAIL OF THE CONTROL STRUCTURES WITH |
| | ELEVATIONS, NOTCHES, BLEEDING ELEVATION, ETC DID YOU |
| | USE EXFILTRATION TRENCH ? |
| | 7. POLLUTION PREVENTION DETAILS,HEIGHT OF THE SILT |
| | FENCE, CLOTHES USED FOR SILT ETC., PLANS SHOWING SILT |
| | FENCE AROUND THE SITE |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |