| Date |
Text |
| 2007-11-06 15:30:42 | REVIEW #: 8TH |
| | ACTION: PASSED/DENIED |
| | |
| | FBC 2004 CODE FAMILY W/ 2005 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | THE FOLLOWING PAGES WERE REVIEWED FOR COMPLIANCE, |
| | STAMPED AND INCORPORATED INTO THE PERMIT SET OF PLANS |
| | AS REV 12A: |
| | |
| | M1-1.0, M1-2.0, M1-2.2, M1-3.0, M1-3.1, M1-4.0, M1-4.1, |
| | M1-4.2, M1-5.0, M1-5.1, M1-5.2, M1-6.0, M2-3.0, M3-1.0 |
| | |
| | THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH |
| | PREVIOUS REVIEW COMMENTS AS WELL AS DESIGNER'S WRITTEN |
| | RESPONSES FOR THE PURPOSE OF CONTINUITY. |
| | |
| | REV. 11 COMMENTS: |
| | |
| | 1. REVISION 12A WILL BE REVIEWED FOR CODE COMPLIANCE AS |
| | WELL AS RESPONSES TO PREVIOUS REVIEW COMMENTS FROM |
| | REVISIONS 10 AND 11. |
| | |
| | 2. M1-1.1: AT THE FIRE COMMAND CENTER, A 6X6 TRANSFER |
| | DUCT HAS BEEN RELOCATED. IF THIS ROOM IS STILL ENCLOSED |
| | BY FIRE-RESISTANCE RATED CONSTRUCTION, THIS OPENING IS |
| | REQUIRED TO BE PROTECTED BY A FIRE DAMPER IN ACCORDANCE |
| | WITH FBC,M 607.5. ALSO, THE 50X26 SUPPLY DUCT FROM |
| | CAHU-1 SHOWS A TEE FITTING OVER ALCOVE A1.104. AT THIS |
| | LOCATION THERE ARE TWO DUCTS PENETRATING THE RATED WALL |
| | BUT ONLY ONE DUCT SHOWS OPENING PROTECTIVE FSD |
| | |
| | 3. OK |
| | |
| | 4. OK |
| | |
| | 5. OK |
| | |
| | 5A. M1-1.2: EF-3 DUCT PENETRATING FLOOR/CEILING |
| | ASSEMBLY ABOVE ROOM D1.107, IS THIS DUCT ENTERING A |
| | SHAFT? IF SO, PROVIDE FIRE AND SMOKE DAMPER AS REQUIRED |
| | BY FBC,M 607.5.5.1. |
| | |
| | 6. OK, EXCEPT: KEY NOTE #6 INDICATES ONLY THE TWO |
| | FIRE/SMOKE DAMPERS ON THE SMOKE EXHAUST DUCT AT THE |
| | ?ATRIUM? ARE TO BE CONTROLLED BY THE SMOKE CONTROL |
| | SYSTEM. HAS THERE BEEN A RATIONAL ANALYSIS DONE TO |
| | DETERMINE WHICH DAMPERS SHOULD BE OPENED AND CLOSED |
| | DURING SMOKE CONTROL MODE? OPENINGS IN SMOKE BARRIERS |
| | SHALL BE PROTECTED BY AUTOMATIC-CLOSING DEVICES |
| | ACTUATED BY THE REQUIRED CONTROLS FOR THE MECHANICAL |
| | SMOKE CONTROL SYSTEM IN ACCORDANCE WITH FBC,M 513.5.2. |
| | THIS MAY ALSO APPLY TO THE FIRE/SMOKE DAMPERS IN THE |
| | SMOKE EXHAUST DUCT PENETRATIONS OF THE SHAFT |
| | ENCLOSURES. |
| | |
| | 7. OK |
| | |
| | 8. OK |
| | |
| | 9. OK |
| | |
| | 10. OK |
| | |
| | 11. M1-2.3 WILL BE REVIEWED IN RESPONSE TOPART OF REV |
| | 10 COMMENTS. |
| | |
| | 12. OK |
| | |
| | 13. M1-3.2: HOW WILL THE FIRE/SMOKE DAMPERS BE ACCESSED |
| | FOR SERVICE, MAINTENANCE AND TESTING ABOVE THIS STAIR |
| | CAP? EVEN WITH 4?9? BETWEEN THE CAP AND THE DECK ABOVE, |
| | AT LEAST 2 OF THE DAMPERS MAY BE RENDERED INACCESSIBLE |
| | BY THE ROUTING OF THE DUCTS. ALSO, IF THE STAIR CAP IS |
| | TO BE USED AS A SERVICE PLATFORM, IT SHALL BE REQUIRED |
| | TO MEET THE REQUIREMENTS FOR A SERVICE PLATFORM IN |
| | ACCORDANCE WITH THE FBC. |
| | |
| | 14. M1-3.2: THERE IS ONE DUCT SHOWN PENETRATING |
| | PROGRAM/MEETING ROOM C3.306 TO FEED TWO VAV BOXES. |
| | WHILE THE SIZE OF THE DUCTS FEEDING THE VAV?S IS |
| | DETEMINED BY THE INLET SIZE ON THE VAV, A SIZE NEEDS TO |
| | BE PROVIDED FOR THE DUCT PENETRATING THE WALL BEFORE IT |
| | BRANCHES TO FEED THE TWO VAV?S. PLEASE CLARIFY. FBC,M |
| | 603.1 |
| | |
| | 15. OK |
| | |
| | 16. OK |
| | |
| | 17. OK |
| | |
| | 18. OK |
| | |
| | REV. 10 COMMENTS: |
| | |
| | 1. OK |
| | |
| | 2. OK |
| | |
| | 3. M1-1.3 THROUGH M1-5.3: ACCORDING TO MANUFACTURER?S |
| | INSTALLATION INSTRUCTIONS, THE CO SENSORS ARE GOOD FOR |
| | APPROXIMATELY 5000 SQ FT OR A 40 FT RADIUS. BASED ON |
| | THE LAYOUT SHOWN ON PLANS, THERE ARE AREAS NOT |
| | ADEQUATELY COVERED BY THE SENSORS. SHOW DETECTORS |
| | LOCATED TO PROVIDE FULL COVERAGE OF THE PARKING GARAGE. |
| | FBC,M 304.1 |
| | |
| | 4. OK |
| | |
| | 5. OK PENDING VERIFICATION OF INTAKE LOCATION. |
| | |
| | 6. OK |
| | |
| | 7. OK |
| | |
| | 8. OK |
| | |
| | 9. OK |
| | |
| | 10. OK |
| | |
| | NEW COMMENTS RELATED TO REV. 12A: |
| | |
| | 1. M4-4.0: SEQUENCE OF OPERATION NOTE #1, ACTIVATION OF |
| | THE SMOKE CONTROL SYSTEM SHALL BE IN COMPLIANCE WITH |
| | FBC 909.12.3. |
| | |
| | 2. M4-4.0: SEQUENCE OF OPERATION NOTE #2, THIS NOTE IS |
| | IN CONFLICT WITH THE NOTE ON FLOOR PLANS WHICH |
| | INDICATES SMOKE DAMPERS ARE TO BE CONTROLLED BY DUCT |
| | SMOKE DETECTORS. ALSO, ALL SMOKE DAMPERS WHICH ARE |
| | RELATED TO THE SMOKE CONTROL SYSTEM AND REQUIRED BY THE |
| | SMOKE CONTROL SYSTEM FOR THE ATRIUM AREA SHALL BE |
| | CONTROLLED BY THE SMOKE CONTROL SYSTEM. FBC,M 513.5.2 |
| | |
| | 3. M4-4.0: SEQUENCE OF OPERATION NOTES 2 THROUGH 7: A |
| | RATIONAL ANALYSIS FOR THE DESIGN OF THE SMOKE CONTROL |
| | SYSTEM SHALL BE PROVIDED TO DETERMINE THE ACTUAL |
| | REQUIRED SEQUENCE OF OPERATIONS, INCLUDING SMOKE DAMPER |
| | ACTUATION, RELATED TO THE PROPER OPERATION OF THE SMOKE |
| | CONTROL SYSTEM IN ACCORDANCE WITH FBC,M 513.4. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |