| Date |
Text |
| 2007-07-26 11:35:29 | |
| | ** REVIEW FOR REV #8 AND REV #10. |
| | |
| | |
| | *** PROVISO /UNSAT *** |
| | |
| | ** PLEASE SEE CONDITIONS ARE STILL GIVEN FOR SOME ITEMS |
| | NOT SUBMITTED AND FOR SOME ITEMS ON PLANS FOR |
| | COORDINATION ETC. SOME SHEETS ARE STAMPED AND PROVISO |
| | NOTES FOLLOW BELOW. |
| | |
| | ** PLEASE SEE THE FAILURE COMMENTS AT THE END OF |
| | *PROVISO* NOTES FOR SHEETS WHICH WERE NOT STAMPED.. |
| | |
| | |
| | |
| | |
| | 1) NOTE: PLEASE SEE THE OVER ALL SHEET E1-1.0 DOES NOT |
| | MATCH WITH NEW LAYOUT FOR MECHANICAL ROOM AT GARAGE AND |
| | HALLWAY AREA. |
| | PLEASE SEE NOTES ON REVIEW OF PHOTO-METRIC PLANS |
| | REVIEW. |
| | |
| | 2) NOTE: PLEASE SEE E2-2.2 MEN AND WOMEN RESTROOMS ON |
| | UPPER LEFT HAND CORNER WHICH STILL SEEM TO INDICATE BY |
| | HASHED LINES MORE THAN THE TWO EM LTS. |
| | PLEASE SEE SOME OF THESE ARE SHOWN ON OTHER SHEETS AND |
| | FOR OTHER BATHROOMS. |
| | PLEASE SEE COMMENTS WITH RESPECT TO PHOTO-METRICS. |
| | |
| | 3) NOTE: PLEASE SEE SHEET E2-4.2 WHICH WILL REMAIN |
| | REDLINED AS ROOF-TOP ACCESS AND WHETHER OR NOT STAIRS |
| | WILL BE REQUIRED IS STILL IN QUESTION. |
| | |
| | 4) NOTE: PLEASE KNOW THAT UPDATED POWER PLANS FOR |
| | CHANGES AND CORRECTIONS WILL STILL BE NEEDED. |
| | |
| | 5) NOTE: PLEASE SEE THE UPPER PART OF THE ELECTRICAL |
| | RISER DIAGRAM WAS NOT SUBMITTED. THIS SHEET ALONG WITH |
| | SOME OTHERS SHOWING THE CHANGES FOR THE GENERATOR ETC |
| | WILL STILL BE NEEDED. |
| | PLEASE SEE THAT THE SPECIFICATIONS ON THE GENERATOR AND |
| | FIELD MODIFICATIONS FOR BI-FUEL ARE STILL NEEDED FOR |
| | REVIEW. |
| | 700,701, 110.3, 90.7. |
| | |
| | 6) NOTE: PLEASE SEE PANEL 5LEB TOTAL FOR VA HAS NOT |
| | BEEN CORRECTED AS NOTED ON PREVIOUS REVIEW AND REDLINED |
| | ON PREVIOUS REVIEWED #8 REVISIONS. |
| | THE TOTAL LOAD ON PANEL DOES NOT CORRELATE WITH THE |
| | TOTAL ON LOAD SUMMARY OF PANEL. |
| | |
| | 7) NOTE: PLEASE SEE SHEET E6-1.0 WHICH STILL INDICATES |
| | A 825KW GENERATOR. AS THIS GENERATOR AHS CHANGED SIZE |
| | SEVERAL TIMES, PLEASE COORDINATE ALL SHEETS WITH |
| | REFERENCE TO THIS UNIT. PLEASE SEE COMMENTS ON |
| | PHOTO-METRIC SHEETS AS THESE CONTAIN SEVERAL OTHER |
| | REFERENCES. |
| | |
| | 8) NOTE: PLEASE SEE NOTE #6 ABOVE AS THE LOADS ADJUSTED |
| | ON 5LEB NEED TO BE CARRIED THROUGH TO ALL OTHER PANELS. |
| | 5HEB ETC. |
| | FBC 106.3.5.1.2 NEC 220. |
| | |
| | 9) NOTE: PLEASE SEE SHEET E1-6.0 AS THE LAYOUT FOR THE |
| | GENERATORS AND EQUIPMENT DOES NOT CORRELATE WITH |
| | PLANS. |
| | PLEASE SEE ROOF TOP MECH ROOM AND CONTROLS FOR LIGHTING |
| | WHICH HAVE NOT BEEN CORRECTED TO COORDINATE WITH |
| | PLANS. |
| | |
| | 10) NOTE: PLEASE KNOW THE IT ROOM HAS NOT BEEN |
| | SUBMITTED FOR PERMITTING TO DATE ALONG WITH ANY LOW |
| | VOLTAGE SYSTEMS FOR THE BUILDING. |
| | |
| | ALL ELECTRICAL SHEETS SUBMITTED WILL BE STAMPED WITH |
| | THE EXCEPTION OF PHOTO-METRICS. |
| | |
| | |
| | |
| | ** UNSAT ** |
| | |
| | 1) NOTE: PLEASE SEE THE PHOTO-METRIC PLANS SUBMITTED |
| | STILL NEED SOME COORDINATION. |
| | PLEASE SEE THERE ARE SEVERAL SHEETS WHERE LIGHTING |
| | FIXTURES ARE MISSING ALTHOUGH THEY ARE ACTUALLY ON THE |
| | ELECTRICAL LIGHTING PLANS. |
| | PLEASE SEE MANY AREAS ARE REDLINED WITH CIRCLES FOR |
| | MISSING FIXTURES AND OR MULTIPLE FIXTURES WHEN THE |
| | PLANS SHOW LESS OR MORE. |
| | PLEASE SEE THAT MANY OF THESE ARE THE EMERGENCY |
| | PHOTO-METRIC SHEETS.PLEASE SEE SOME OF THESE SHEETS |
| | IN ONE SET ACTUALLY CONTAINS A *CHECK* AS THESE ARE OK, |
| | HOWEVER CHANGES ON OTHER SHEETS FOR COORDINATION MAY |
| | AFFECT THESE. |
| | PLEASE SEE THE FOLLOWING SHEETS FOR EXAMPLE WHICH ARE |
| | MISSING FIXTURES, LOCATIONS ARE INCORRECT OR ARE |
| | SHOWING FIXTURES NOT ON LIGHTING PLANS. |
| | 8-1.1, |
| | 8-1.2, |
| | 8-1.3, |
| | 8-3.2, |
| | 8-4.1, |
| | 8-4.2, |
| | 8-5.2 MISSING FC AVG. FOR STAIRS. |
| | 8-6.0 3-GENERATORS SHOWN, 3-400KW GENERATORS. |
| | 8-6.3 3-GENERATORS SHOWN, 2-FUTURE AND 1-825KW GEN. |
| | 9-1.0 |
| | ** PLEASE BE SURE TO COORDINATE THE SHEETS AS THE |
| | LEVELS OF LIGHTING MAY CERTAINLY CHANGE WHEN FIXTURES |
| | ARE ADDED OR DELETED. |
| | PLEASE BE SURE TO SEE ANY ROOMS AND AREAS (MECH |
| | ELECTRICAL ROOM IN GARAGE). |
| | PLEASE SEE LS 101 7.8 AND 7.9. |
| | PLEASE SEE FAC 61G15-33.004 |
| | |
| | |
| | |
| | IF THERE ARE ANY QUESTIONS, PLEASE CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW II |
| | CONSTRUCTION SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |
| | |