| 2009-03-17 09:40:55 | ** NOTES REDLINED ** REVISIONS DENIED |
| | |
| | |
| | 1) NOTE: COORDINATION STUDY OVER ALL IS OK AND MEETS |
| | CODE FOR 700 AND 701 SYSTEMS. |
| | THERE ARE OVER LAPS SHOWN ON THE TIME CURVE |
| | COORDINATION STUDY BASED ON ALL TRANSFORMERS WHICH IS |
| | TYPICAL PER ENGINEER. THERE IS ALSO OVERLAPPING ON TWO |
| | BREAKERS ON THE OPTIONAL STAND-BY SYSTEM. THESE |
| | BREAKERS ARE RATED FOR THE AVAILABLE FAULT CURRENT |
| | HOWEVER THEY ARE NOT SELECTIVELY COORDINATED. THE CODE |
| | DOES NOT ADDRESS OPTIONAL STAND-BY FOR SELECTIVE |
| | COORDINATION. THIS IS EQUIPMENT WHICH IS NOT LIFE |
| | SAFETY/EMERGENCY OR LEGALLY REQUIRED STAND-BY. |
| | |
| | 2) NOTE: THE REVISED PLANS ARE BEING SENT BACK AS ALL |
| | CIRCUITING ON PLANS AND PANEL SCHEDULES NEED TO |
| | COORDINATE BEFORE THE FINAL CO OF BUILDING. AS THERE |
| | ARE STILL SEVERAL CIRCUITS ON PANELS AND PLANS WHICH |
| | HAVE NOT BEEN UPDATED THIS NEEDS TO BE DONE. BASED ON |
| | THE CIRCUITING OF THE POWER PLANS AND LIGHTING PLANS |
| | THERE ARE CIRCUITS FOR EXAMPLE SHOWN AS LIGHTING WHICH |
| | ON THE PANEL SCHEDULE THEY ARE MOTOR CONTROL CENTERS? |
| | THE REVIEW WILL REMAIN IN FAILED STATUS BASED ON THE |
| | REVISED PLANS STILL NEEDING TO BE FINALIZED. |
| | IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT |
| | TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO |
| | CONTACT THIS REVIEWER. |
| | |