| Plan Review Notes For Permit 06100574 |
| Permit Number |
06100574 |
|
| Review Stop |
G |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2007-02-17 17:14:28 | PASSED/PROVISO | | | | | | GAS RISER DIAGRAM SHOWS 128' FROM GENERATOR TO LAST | | | FUTURE GENERATOR. THIS SCALES OUT TO ABOUT 30' ON THE | | | PLANS. THE PIPING SHALL BE SIZED FOR 200' MAXIMUM. A | | | REVISION WILL BE REQUIRED SHOWING THE CORRECT DISTANCE | | | FROM THE FIRST GENERATOR TO THE LAST.--THE MANUF. | | | SPECIFICATIONS SHALL BE REQUIRED SHOWING THE MAXIMUM | | | BTU LOAD AT 100% CAPACITY WHEN APPLYING FOR THE | | | REQUIRED GAS PERMIT. |
|