| Date |
Text |
| 2007-01-22 10:07:22 | 2007-01-22 10:07:22 |
| | |
| | ** UNSAT ** |
| | |
| | |
| | ** PLEASE SEE NOTES FROM PREVIOUS REVIEW STILL NEED TO |
| | BE ADDRESSED. |
| | |
| | ** PLEASE SEE THE NOTES BELOW WILL AFFECT NUMEROUS |
| | SHEETS WHICH WILL BE REQUIRED TO BE REVISED. |
| | |
| | ** PLEASE SEE PREVIOUS NOTES WHICH MENTIONED SOME OF |
| | THE COMMENTS WERE *REDLINED* ON PLANS; HOWEVER WERE IN |
| | NO WAY ALL LOCATIONS OR ITEMS. PLEASE SEE ONCE AGAIN |
| | THE PLANS CONTAIN CIRCLES AROUND AREAS IN WHICH |
| | COMMENTS ARE MADE. |
| | PLEASE SEE COMMENTS AS MANY OF THE OLD SHEETS WERE |
| | SUBMITTED BACK IN SETS WITHOUT BEING REVISED. |
| | |
| | |
| | 1) NOTE: PLEASE CORRELATE FP SHEETS WITH THE |
| | SUBMITTALS. PLEASE SEE THE FP SHEET STILL INDICATES AN |
| | ELECTRIC FIRE PUMP FOR ONE OF THE PUMPS. THIS IS THE |
| | 6TH TIME THIS COMMENT HAS BEEN MADE. THIS COMMENT WAS |
| | MADE ON THE 50%, 90%, 1ST 100%,2ND 100%(FIRST UNDER |
| | PERMIT) AND 2ND SUBMITTAL UNDER PERMIT AND NOW THIS |
| | REVIEW. |
| | PLEASE SEE THE SIZES OF THE FIRE PUMPS ON PLANS DO NOT |
| | CORRELATE WITH THE SUBMITTALS. |
| | PLEASE SEE THE SIZE OF ONE OF THE TANKS FOR ONE OF THE |
| | FIRE PUMPS HAS NOW CHANGED TO A *00*SIZE TANK. PLEASE |
| | SEE THE HP RATING OF ONE OF THE PUMPS HAS NOW CHANGED |
| | AND DOES NOT CORRELATE WITH THE SUBMITTALS. PLEASE SEE |
| | THE TYPE AND MANUFACTURE OF THE FIRE PUMP CONTROLLERS |
| | STILL DO NOT CORRELATE. |
| | PLEASE SEE THE SUBMITTAL BOOKS CONTAIN MULTIPLE SPECS |
| | FOR THE TANKS. PLEASE KNOW IF NEW TANKS AND SIZES ARE |
| | GOING TO BE USED, DO NOT LEAVE THE OLD SUBMITTALS IN, |
| | IF THEY ARE INDEED OLD. |
| | PLEASE CORRELATE ALL OF THE ABOVE AND PLEASE CORRECT |
| | FP0-1.0. |
| | 90.7, 110.3, 695 NEC. |
| | 2003 NFPA-20 CHAPTER 9 AND 10. |
| | FBC ADMIN SECTION 106.1, 106.1.2, 106.3.5.1.2 |
| | |
| | |
| | 2) NOTE: PLEASE SEE THE PREVIOUS REVIEW COMMENT WHICH |
| | STATED THE SIGNATURES ON THE FP SHEETS FROM OTHER THAN |
| | MR. JAMES MINDUR DID NOT CORRELATE. PLEASE SEE ALL THE |
| | NEW SHEETS SEEM TO CONTAIN THE SAME SIGNATURE AS SHOWN |
| | ON THE NEW PLUMBING AND MECHANICAL SHEETS. PLEASE SEE |
| | THE OLD/NOT REVISED FP SHEETS DO NOT CONTAIN THIS NEW |
| | SIGNATURE. PLEASE SUBMIT A SIGNED, SEALED, DATED AND |
| | NOTARIZED LETTER FOR LEGAL SIGNATURE VERIFICATION. THIS |
| | WILL BE PLACED IN OUR SIGNATURE FILE FOR ANY FUTURE |
| | REFERENCE. |
| | |
| | 3) NOTE: PLEASE SEE THE SPEC SUBMITTED FOR THE MTS |
| | CONTAIN A COVER SHEET FOR AN ATS. |
| | PLEASE CORRELATE. |
| | 110.3, 90.7, 702.6 NEC. |
| | FBC 106.1.2, 106.3.5.1.2 |
| | |
| | 4) NOTE: PLEASE SEE THE PLANS IN SOME PLACES STILL |
| | INDICATE A SMALLER GENERATOR THAN THAT ON OTHER SHEETS |
| | OF THE PLANS. PLEASE SEE SOME SHEETS AS THEY WERE NOT |
| | REVISED OR UPDATED FOR OTHER COMMENTS OR FOR THE |
| | GENERATOR WHICH ARE THE SAME SHEETS FROM THE PREVIOUS |
| | REVIEWED PLANS. |
| | PLEASE SEE THE SUBMITTALS FOR THE GENERATOR DO NOT |
| | CORRELATE. (PLEASE SEE SOME ARE FOR A *KATOLIGHT* UNIT |
| | WHICH IS A DIFFERENT MANUFACTURE AND DIFFERENT SIZE |
| | ETC. |
| | PLEASE CORRELATE ALL OF THE EQUIPMENT. |
| | 110.3, 90.7, 445 NEC. |
| | NFPA-110 2002 CHAPTERS 5, 6 AND 7. |
| | |
| | 5) NOTE: PLEASE SEE E0-1.0 FOR MAXIMUM TIMES ON DIMMER |
| | DEVICE. |
| | FBC 2004 13-415.1.ABC.1.1 AND .1.2. |
| | |
| | 6) NOTE: PLEASE SEE LOBBY AREAS/SEPARATE SPACES WHICH |
| | DO NOT INDICATE OVER RIDE CONTROLS AS GONE OVER IN |
| | PREVIOUS REVIEW AND IN MEETING. THE RESPONSE LETTER |
| | MENTIONS THE LOBBIES WERE DONE, HOWEVER NOT ALL. PLEASE |
| | SEE OTHER AREAS OF BUILDING WHICH DO NOT INDICATE |
| | CONTROLS FOR SEPARATE SPACES. |
| | PLEASE KNOW THE REDLINED PLANS WHICH WERE REMOVED FROM |
| | 13-415.1.ABC.1.1, .1.2, .1.3. |
| | |
| | 7) NOTE: PLEASE SEE THE ENERGY CALCULATIONS STILL DO |
| | NOT SEEM TO CORRELATE FOR EXTERIOR FIXTURES. THE PLANS |
| | INDICATE A SUBSTANTIAL AMOUNT OF FIXTURES; HOWEVER |
| | THESE CALCULATIONS DO NOT SEEM TO CORRELATE. PLEASE SEE |
| | 13-415.1.AB.1.1, 13-415.2.ABC.1.3 ETC |
| | |
| | 8) NOTE: PLEASE SEE ALL SHEETS IN SETS WHICH ARE THE |
| | *OVERALL* SHEETS FOR FLOORS ETC WHICH WERE NOT REVISED. |
| | PLEASE SEE THEY ARE THE SAME SHEETS FROM THE PREVIOUS |
| | REVIEW. |
| | PLEASE CLARIFY HOW THE PLANS CONTAIN TWO SEPARATE |
| | LAYOUTS. ???? |
| | FBC 106.1.2, 106.3.5.1.2 |
| | |
| | 9) NOTE: PLEASE SEE THE LIGHT POLE SUBMITTALS WHICH DO |
| | NOT ADDRESS PREVIOUS REVIEW COMMENTS. PLEASE SEE THESE |
| | DO NOT CONTAIN WIND LOAD INFORMATION AND NO |
| | CALCULATIONS FOR FIXTURES ON POLES OR POLES AND THE |
| | EFFECTIVE PROJECTED AREA COULD BE LOCATED. AS |
| | PREVIOUSLY STATED, THIS COULD BE DONE AS A PROVISO AND |
| | THIS INFORMATION COULD BE SUBMITTED AT A LATER DATE. |
| | 106.1.2 |
| | |
| | 10) NOTE: PLEASE SEE STAIRS 11 AND 12 ARE NOT COMPLETE |
| | (SEE LATER NOTES FOR STAIR 13). |
| | PLEASE SEE MISSING LIGHTING FOR EMERGENCY EGRESS OR |
| | LIGHTING UNDER NORMAL FOR STAIR 12. PLEASE SEE |
| | PHOTO-METRICS WHICH ARE ALSO STILL MISSING UNDER NORMAL |
| | AND UNDER EMERGENCY. |
| | PLEASE SEE LS 101 7.8.1.3, 7.9.2.2 ETC |
| | PLEASE SEE THAT ALL SHEETS AND ALL OVER-LAYS NEED TO |
| | CORRELATE AND PLEASE SEE THAT THESE SECTIONS FOR |
| | MEZZANINE LEVELS ARE NOT COMPLETE. |
| | FBC 106.1.2 |
| | *PLEASE SEE BUILDING REVIEW NOTES FOR POSSIBLE CONFLICT |
| | FOR DOOR SWINGS (IF APPLICABLE). |
| | |
| | 11) NOTE: PLEASE SEE STAIR AREA FOR STAIR (8) ON |
| | E2-5.0.0. PLEASE SEE THE LIGHTING WAS NOT CHANGED. |
| | PLEASE SEE THAT ALL SHEETS AND OVER-LAYS NEED TO |
| | CORRELATE. FBC 106.1 |
| | |
| | 12) NOTE: PLEASE SEE LIGHTING ON E1-6.3 WAS NOT UPDATED |
| | FOR STAIRS 4 AND 5. PLEASE ALSO SEE NOTES FOR |
| | PHOTO-METRICS. NFPA-101 7.8, 7.9 |
| | FBC 106.1.2, |
| | |
| | 13) NOTE: PLEASE SEE THAT THE LIGHTING POWER DENSITY |
| | CALCULATIONS STILL DO NOT CORRELATE WITH ALL OF THE |
| | AREA AND ROOM DESIGNATIONS ON PLANS. |
| | PLEASE SEE UPPER LEVELS, MISSING ALL OF A-6 |
| | DESIGNATIONS. |
| | FBC 13-415.2 |
| | FBC 106.1.2, 106.3.5.1.2 |
| | |
| | 14) NOTE: PLEASE SEE E2-1.2 WHICH CONTAINS MISSING |
| | CIRCUITING FOR ROOMS FOR MECHANICAL EQUIPMENT. PREVIOUS |
| | NOTES REQUESTED ALL ROOM DESIGNATIONS TO BE COORDINATED |
| | ETC. |
| | PLEASE SEE THESE ARE ROOMS WHICH ARE ELEVATOR EQUIPMENT |
| | ROOMS WHICH DO NOT CONTAIN THE DEDICATED CIRCUITS AS |
| | REQUIRED PER 620.23. |
| | PLEASE SEE DESIGNATIONS FOR ELEVATOR EQUIPMENT ROOMS |
| | SHOULD BE ON PLANS AS LIGHTING IN THESE ROOMS IS BEING |
| | SHOWN FEEDING OTHER AREAS. |
| | ROOMS FOR ELEVATORS 6,7,8, AND 9. |
| | PLEASE SEE NOTES WITH RESPECT TO UPPER EQUIPMENT |
| | ROOM(S). |
| | |
| | 15) NOTE: PLEASE SEE PLANS FOR UPPER EQUIPMENT ROOMS |
| | ARE NOT COMPLETE. THIS WAS GONE OVER IN MEETING, |
| | HOWEVER THE SAME SHEETS WERE SUBMITTED BACK IN FOR |
| | REVIEW. |
| | PLEASE CLARIFY THE AREA/ROOM DESIGNATIONS FOR THE |
| | ELEVATOR EQUIPMENT FOR UNITS 1, 2 AND 3. |
| | WHERE IS THIS ELEVATOR EQUIPMENT ROOM? PLEASE SEE IF |
| | THIS IS THE ROOM LOCATED ON UPPER FLOORS POWER PLANS |
| | E1-6, E1-6.1 WHERE IS THE EQUIPMENT AND THE DEDICATED |
| | BRANCH CIRCUITS ETC. PLEASE ALSO SEE LIGHTING PLANS. |
| | PLEASE SEE 620.22, .23, .24, 51 ETC. |
| | |
| | 16) NOTE: PLEASE LIGHTING AND POWER PLANS FOR THE SAME |
| | FLOOR/AREA AS THE LIGHTING AND CONTROLS STILL INDICATE |
| | SWITCHING OUTSIDE STAIR WALL? PLEASE SEE THE SAME PLANS |
| | WERE SUBMITTED WITH OUT CHANGES TO THE UPPER DOME AREA |
| | FOR LIGHTING CONTROL, EGRESS LIGHTING ETC. |
| | PLEASE SEE THE UPPER AREA PLANS NEED TO BE COORDINATED |
| | AND COMPLETE. |
| | NFPA-101 7.8,7.9, FBC 13-415.1.ABC.1.1, ETC, NEC 620, |
| | 408, 310.16, 240.4 ETC |
| | FBC 106.1.2, 106.3.5.1.2 ** PLEASE CALL TO GO OVER |
| | THESE SHEETS. |
| | |
| | 17) NOTE: PLEASE SEE STILL MISSING BATTERY BACK LIGHT |
| | FIXTURES OF SOME KIND ON MECHANICAL EQUIPMENT ROOMS, |
| | ELEVATOR EQUIPMENT ROOMS.THIS IS FOR MULTIPLE ROOMS |
| | LS 101 7.8, 7.9, NEC 700.16, 700.12E ETC. |
| | PLEASE SEE REDLINED SHEETS. |
| | |
| | 18) NOTE: PLEASE STILL MISSING THE MANUFACTURES |
| | SPECS/CUT SHEETS FOR THE TANK LESS WATER HEATERS. |
| | 110.3, 90.7. THIS COULD BE DONE AS A *PROVISO* ALTHOUGH |
| | IT WAS ALSO STATED IN PLUMBING REVIEW COMMENTS. |
| | |
| | 19) NOTE: PLEASE SEE PHOTO-METRICS. PLEASE CORRELATE |
| | ALL STAIRS AND AREAS FOR EGRESS. PLEASE SEE PREVIOUS |
| | NOTE ABOVE WHICH MENTIONS TO COMPLETE STAIRS 11, 12 |
| | ETC. |
| | PLEASE SEE THERE ARE SEVERAL SHEETS WHICH THE |
| | TABLE/INFORMATION IS NOT PRINTED. |
| | PLEASE SEE SHEETS E8-5.1 THRU 8-6.4 WHICH STILL |
| | INDICATE LIGHTING PHOTO-METRIC INFORMATION STILL |
| | PENDING. |
| | PLEASE SEE SHEETS E9-5.1 THRU 9-5.2 WHICH ALSO INDICATE |
| | INFORMATION STILL PENDING. |
| | PLEASE COMPLETE AT THIS TIME AS REQUESTED. |
| | |
| | 20) NOTE: PLEASE SEE STAIRS ARE STILL BEING NUMBERED |
| | WITH NUMERICAL DESIGNATIONS WHICH DO NOT CORRELATE WITH |
| | THE PLANS. STAIR 1, STAIR 4, STAIR 8, ETC. |
| | 106.1, 106.1.2, 106.3.5.1.2 |
| | LS 101 |
| | PLEASE CLARIFY. |
| | |
| | 21) NOTE: PLEASE SEE SOME BATHROOMS STILL MISSING |
| | BATTERY TYPE BACK UP LIGHT. PLEASE SEE LIBRARY MEN?S |
| | AND WOMEN?S ON E2-1.2 |
| | |
| | 22) NOTE: PLEASE SEE STAIR 1 ON OVER ALL PLANS ON |
| | E2-5.0 AND 2-5.1 FIXTURE TYPE, WHERE IS THE E2? PLEASE |
| | ALSO CLARIFY WHERE THIS STAIR CONTINUES UP. |
| | |
| | |
| | * ** IMPORTANT** |
| | ONCE ALL REVIEWS ARE DONE AND PLANS ARE |
| | PICKED UP FOR CORRECTIONS, PLEASE BE |
| | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED |
| | SHEETS AND ONLY INSERT NEW REVISED |
| | SHEETS INTO TWO COMPLETE SETS FOR REVIEW |
| | AND STAMPING. DO NOT LEAVE ANY |
| | OLD/VOIDED SHEETS IN SETS. |
| | PLEASE KNOW ONLY ONE SET OF THE |
| | OLD/VOIDED SHEETS SHOULD BE SUBMITTED |
| | FOR REFERENCE. |
| | THIS WILL HELP IN THE REVIEW PROCESS AND |
| | AVOID ANY DELAYS. |
| | |
| | ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR |
| | COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF |
| | THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, |
| | NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO |
| | NOT HESITATE IN CONTACTING THIS OFFICE AND THIS |
| | REVIEWER. |
| | |
| | |
| | |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | CONSTRUCTION SERVICES DEPT. |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |
| 2007-01-22 06:31:13 | 2007-01-22 06:31:13 |
| | IN PROGRESS |
| 2007-01-21 19:09:40 | 2007-01-21 19:09:40 |
| | ELECTRICAL REVIEW COMPLETED. |
| | THE PLANS WILL BE GOING INTO A "F" STATUS AND NOTES ARE |
| | TO FOLLOW ONCE THEY ARE COMPLETED. |