| Date |
Text |
| 2008-11-17 10:57:12 | REVISION DENIED |
| | REFERENCE: FBC-2004 PLUMBING |
| | FBC-2004 CHAPTER 1 |
| | |
| | 1. SHT P1-1.0U REVISION INDEX & FLOOR PLAN FROM |
| | PREVIOUS SHEET SIGNED, SEALED & DATED ON 9-17-08 |
| | INDICATES REVISION 193R3 DATED 9-16-08. NEW REVISIED |
| | SHEET SUBMITTED DELETED REVISION 193R3 AND NOW SHOWS |
| | REVISION 193R4 DATED 10-30-08 BUT NO CLOUD FOR NEW |
| | REVISION. PER SECTION 106.1.3 COMPLETE REVISION RECORD |
| | IS REQUIRED AND ALL NEW REVISIONS SHALL BE INDIDCATED |
| | WITH A CLOUD AND REVISION NUMBER SHOWING WHERE THE NEW |
| | REVISION CAN BE LOCATED. |
| | |
| | 2. SHT P1-1.0U 2-WAY CLEANOUTS ARE REQUIRED AS THE |
| | GREASE LINE EXITS THE BUILDING AND BEFORE THE INLET OF |
| | THE GREASE INTERCEPTOR AND ON THE OUTLET OF THE GREASE |
| | INTERCEPTOR. THE GREASE INTERCEPTOR PRIOR TO THE GREASE |
| | INTERCEPTOR OUTLET CAN BE USED FOR BOTH THE INLET |
| | REQUIREMENT AND THE REQUIREMENT AS THE GREASE LINE |
| | EXITS THE BUILDING. SECTION 708.3.5 & UTILITY DEPT |
| | GREASE INTERCEPTOR STANDARD. |
| | |
| | 3. SHT 1-1.0U 2-WAY CLEANOUTS ARE REQUIRED ON THE INLET |
| | AND OUTLET OF THE GREASE INTERCEPTOR. UTILITY DEPT |
| | GREASE INTERCEPTOR STANDARD. |
| | |
| | 4. SHT P1-1.0 REVISION INDEX & FLOOR PLAN FROM PREVIOUS |
| | SHEET SIGNED, SEALED & DATED ON 9-17-08 INDICATES |
| | REVISION 193R3 DATED 9-16-08. NEW REVISIED SHEET |
| | SUBMITTED DELETED REVISION 193R3 AND NOW SHOWS REVISION |
| | 193R4 DATED 10-30-08 BUT NO CLOUD FOR NEW REVISION. PER |
| | SECTION 106.1.3 COMPLETE REVISION RECORD IS REQUIRED |
| | AND ALL NEW REVISIONS SHALL BE INDIDCATED WITH A CLOUD |
| | AND REVISION NUMBER SHOWING WHERE THE NEW REVISION CAN |
| | BE LOCATED. |
| | |
| | 5. SHT P1-1.0 CHANGES TO THE CONDENSATE HAVE BEEN FOUND |
| | WITHOUT CLOUDS OR INDICATED BY REVISION NUMBERS. SHOW |
| | ALL CHANGES WITH CLOUDS AND REVISION NUMBERS. SECTION |
| | 106.1.3. PLEASE INDICATE ALL CHANGES/REVISIONS ON THE |
| | SHEET WITH A CLOUD AND A REVISION NUMBER. |
| | |
| | 6. SHT P1-1.2U 2-WAY CLEANOUTS ARE REQUIRED ON THE |
| | INLET AND OUTLET OF THE GREASE INTERCEPTOR. UTILITY |
| | DEPT GREASE INTERCEPTOR STANDARD. |
| | |
| | 7. SHT P1-1.2 THE 2" GOOSENECK VENT FOR THE GREASE |
| | INTERCEPTOR IS NOT REQUIRED AS THE INLET LINE TO THE |
| | INTERCEPTOR IS A VENTED LINE. IF THE VENT IS INSTALLED |
| | IT SHALL BE TERMINATED PER SECTIONS 904.5 & 904.6. |
| | |
| | 8. SHT P2-1.0 DETAIL 5 SHOWS CHANGES WITH NO CLOUDS OR |
| | REVISION NUMBERS INDICATING THE LOCATION OF THE |
| | REVISIONS. REVISIONS 1 & 2 WERE DELETED AND A REVISION |
| | DATED 12-06-07 IS INDICATED WITHOUT A REVISION NUMBER. |
| | PLEASE CLARIFY. SECTION 106.1.3. PLEASE INDICATE ALL |
| | CHANGES/REVISIONS ON THE SHEET WITH A CLOUD AND A |
| | REVISION NUMBER. |
| | |
| | 9. SHT P2-1.0U DETAIL 5 SHOWS CHANGES WITH NO CLOUDS OR |
| | REVISION NUMBERS INDICATING THE LOCATION OF THE |
| | REVISIONS. REVISIONS 1 & 2 WERE DELETED PLEASE CLARIFY. |
| | SECTION 106.1.3. PLEASE INDICATE ALL CHANGES/REVISIONS |
| | ON THE SHEET WITH A CLOUD AND A REVISION NUMBER. |
| | |
| | 10. SHT P3-1.0 A CLEANOUT IS REQUIRED NEAR THE JUNCTION |
| | OF THE BUILDING GREASE DRAIN AND THE BUILDING SEWER |
| | GREASE PER SECTION 708.3.5. PLEASE SHOW ON THE RISER |
| | DIAGRAM. |
| | |
| | WHEN RESUBMITTING PLANS PLEASE INDICATE |
| | THE REVISION & REMOVE & REPLACE ANY |
| | PAGES AS NECESSARY. A TRANSMITTAL LETTER |
| | LISTING THE ORIGINAL REVIEW COMMENT NUMBER, |
| | WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION |
| | PAGE WHERE THE CHANGES CAN BE FOUND |
| | WILL HELP TO EXPEDITE YOUR PERMIT. REMOVE |
| | ALL VOID SHEETS FROM ALL PLANS AND PLACE |
| | ONE SET OF THEM LOOSELY ON TOP OF THE |
| | COLLATED PLANS TO BE REVIEWED. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | |
| | |
| | |