| 2006-11-25 20:22:32 | **** CITY CENTER ******* |
| | |
| | |
| | REVIEW OF 100% ELECTRICAL PLANS SUBMITTED ON NOVEMBER |
| | 7TH, 2006. |
| | |
| | PLEASE SEE THE FOLLOWING COMMENTS ARE BASED ON THESE |
| | PLANS AS NOTED ABOVE AND NOT THE 100% PLANS SUBMITTED |
| | ON OCTOBER 17TH, 2006. |
| | |
| | 1) NOTE: PLEASE KNOW WHEN SUBMITTING FOR FINAL |
| | PERMITTING AND STAMPING, A THIRD SET OF SIGNED, DATED |
| | AND SEALED PLANS WILL BE REQUIRED. |
| | PLEASE SEE FBC ADMINISTRATIVE SECTION AS ADOPTED BY THE |
| | CITY OF WEST PALM BEACH, 106.1.2106.1.3, 109.3.6 FOR |
| | THRESHOLD BUILDINGS. THIS IS WILL BE REQUIRED FOR ALL |
| | DOCUMENTATION AND PLANS AND FOR ALL TRADES WHETHER OR |
| | NOT COMMENT IS MADE BY OTHER TRADES. |
| | |
| | 2) NOTE: PLEASE SEE FBC CHAPTER 13. PLEASE SEE |
| | 13-415.1.ABC.1.1, .1.2 AND .1.3. |
| | PLEASE BE SURE ALL DEVICE ON PLANS CORRELATE WITH THE |
| | DEVICE SYMBOL LEGEND. |
| | PLEASE BE SURE MAX TIME OF OVER -RIDES ARE SHOWN. IF |
| | TIMER TYPE, (4HRS MAX), IF OCCUPANCY SENSOR TYPE (30 |
| | MINS MAX). |
| | PLEASE SEE ADDITIONAL COMMENTS FOR CONTROLS AND SYSTEM |
| | BEING PROPOSED. |
| | |
| | 3) NOTE: PLEASE PLACE A NOTE ON PLANS FOR ALL "TASK" |
| | LIGHTING WHICH MAY NOT BE SHOWN ON PLANS AT THIS TIME. |
| | 13-415.1.ABC.1.3 |
| | |
| | 4) NOTE: PLEASE SUBMIT COMPLETED ENERGY CALCULATIONS |
| | FOR THE ENTIRE BUILDING FOR REVIEW OF ALL TRADES. |
| | PLEASE KNOW AS NONE WERE SUBMITTED AT THIS TIME THERE |
| | ARE MANY ITEMS WHICH CAN NOT BE VERIFIED WITH THE |
| | PLANS, EQUIPMENT AND LIGHTING. |
| | PLEASE SEE 13-415.1.AB.1. |
| | |
| | 5) NOTE: PLEASE SEE 13-415.2, 13-415.2ABC.1 FOR MINIMUM |
| | AND MAXIMUM PERFORMANCE CALCULATIONS. PLEASE SEE THE |
| | CALCULATIONS SUBMITTED SHOWING THE LIGHTING POWER |
| | DENSITIES (LPD) ARE NOT COMPLETE AND/OR THERE ARE ITEMS |
| | WHICH DO NOT CORRELATE WITH SAID PLANS. |
| | PLEASE SEE THERE ARE MANY ROOMS INDICATED ON PLANS |
| | WHICH COULD NOT BE LOCATED IN CALCULATIONS OR THERE ARE |
| | ROOMS ON CALCULATIONS WHICH COULD NOT BE LOCATED ON |
| | PLANS. |
| | PLEASE CORRELATE AND PLEASE SEE SOME OF THE LPD'S SEEM |
| | TO BE VERY HIGH FOR SOME OF THE ROOMS AND AREAS AS |
| | NOTED AND SHOWN. |
| | PLEASE SEE OFFICE IN PARKING GARAGE FOR INSTANCE. |
| | PLEASE SEE SOME OTHERS WHICH BASED ON THE TABLES AS |
| | SET-FORTH IN THE CODE MAY ALLOW 1.7, THE CALCULATIONS |
| | MAY SHOW 10.5 ETC. |
| | PLEASE REVIEW ALL AND RE-ADJUST AS REQUIRED AND |
| | NEEDED. |
| | |
| | 6) NOTE: PLEASE SEE 13-415.2.ABC.1.3 FOR ALL EXTERIOR |
| | LIGHTING ALLOWANCES, INCLUDING THAT WHICH IS |
| | DECORATIVE. PLEASE SEE THERE ARE EXCEPTIONS FOR SOME |
| | AREAS; HOWEVER THESE AREAS AS LISTED WOULD BE REQUIRED |
| | BY SECTIONS AS LISTED. PLEASE SEE 13-415.0(3) |
| | (EXCEPTS). |
| | |
| | 7) NOTE: PLEASE SEE PLANS SHALL INDICATE THE ACTUAL |
| | PANEL BEING USED FOR LIGHTING CONTROLS. PLEASE SEE |
| | THERE ARE SEVERAL PANELS INDICATE IN THE MANUFACTURE |
| | SPECS/CUT SHEETS SUBMITTED AND THE ACTUAL UNIT NEEDS TO |
| | BE HIGH-LIGHTED IN SPECS. PLANS SHALL ALSO BE REQUIRED |
| | TO PROVIDE THE TECHNICAL INFORMATION AT EACH LIGHTING |
| | CONTROL PANEL. (LCP) |
| | ** PLEASE KNOW AS REFERENCE TO LIGHTING CONTROL PANELS |
| | IN NOTES HERE ON WILL BE DESIGNATED AS "LCP'S". PLEASE |
| | SEE RISER INDICATES LCP'S AS 225A RATED, WHICH IS OK, |
| | HOWEVER PLEASE BE SURE THE INFORMATION AS SHOWN ON |
| | CUT/SPEC SHEETS IS BROUGHT OVER TO THE PLANS AND LISTED |
| | ON EACH LCP. |
| | |
| | 8) NOTE: PLEASE KNOW THERE IS CONCERN OVER THE TYPE OF |
| | SYSTEM BEING PROPOSED AND CONTROLS OF SAID SYSTEM. |
| | PLANS CALL FOR A "SWEEP" EACH HOUR FOR THE SYSTEM OUT |
| | OF NORMAL BUSINESS HOURS AND THIS WILL TURN OFF ANY AND |
| | ALL DEVICES. THE DEVICES WILL THEN HAVE THE ABILITY TO |
| | OVER RIDE THE SYSTEM IN ANY PARTICULAR AREA WHICH THE |
| | CIRCUIT/SWITCH IS DESIGNATED TO. PLEASE KNOW THIS |
| | BUILDING IN SEVERAL SECTIONS WILL BE OCCUPIED OUT OF |
| | THE NORMAL BUSINESS HOURS WHICH ARE SET UP AND WILL |
| | CAUSE DARKNESS EACH HOUR EVEN WHEN OCCUPIED. PLEASE SEE |
| | SPECS SHEETS AS SUBMITTED SPEAK OF THE INCLUSION OF AN |
| | OCCUPANT SENSOR TYPE DEVICE TO ALLEVIATE THIS. |
| | (UNINTENDED BLACK-OUTS). PLEASE SEE AREAS LIKE THE |
| | LIBRARY, COMMISSIONS CHAMBERS, OFFICE DESIGNATED FOR |
| | POLICE, AND OTHER AREAS. |
| | PLEASE SEE THE CODE ON THE OTHER HAND FOR ALL AREAS |
| | WHICH DURING NORMAL BUSINESS HOURS WHICH WILL REQUIRE |
| | ROOMS TO BE OFF. PLEASE SEE 13-415.1.ABC.1.2, FOR ALL |
| | ROOMS CONTAINING FLOOR TO CEILING HEIGHT PARTITIONS |
| | WHICH WILL REQUIRED SEPARATE CONTROL. PLEASE SEE AS |
| | SHOWN ON PLANS, THESE ROOMS WILL COME "ON" AT THE SET |
| | BUSINESS HOUR TIMES AND WILL REMAIN ON UNTIL AFTER THE |
| | "ONE HOUR SWEEP" AFTER THE NORMAL OPERATIONAL TIMES |
| | HAVE PASSED. |
| | PLEASE SEE CLOSETS, OFFICES, STORAGE AREAS ETC. THERE |
| | ARE FAR TOO NUMEROUS ROOMS TO LIST. |
| | PLEASE SEE THERE ARE MANY ROOMS ON PLANS WHICH DO |
| | INDICATE "OC" TYPE DEVICES; HOWEVER THERE IS NOT DETAIL |
| | ON THE LIGHTING CONTROL RISER HOW THESE WILL BE |
| | CONNECTED OR TIED IN. |
| | PLEASE SEE BATHROOMS ETC. |
| | PLEASE KNOW THIS TYPE OF DEVICE WILL WORK IN MANY AREAS |
| | IN THIS BUILDING; HOWEVER THERE ARE AREAS WHICH WILL |
| | NOT MEET CODE OR THE INTENT IN SEPARATE SPACES. PLEASE |
| | KNOW AT THIS TIME, AS SHOWN THERE ARE SEVERAL ITEMS |
| | WHICH WILL BE REQUIRED TO BE ADJUSTED. PLEASE ALSO |
| | OBTAIN A LETTER FROM THE "SENTRY SWITCH" MANUFACTURE |
| | WHICH PERMITS THIS TYPE OF DEVICE TO BE USED WITH THE |
| | LUTRON GRAFIK PANEL. |
| | 110.3, 90.7 NEC. |
| | |
| | 9) NOTE: PLEASE SEE THERE ARE SEVERAL ROOM NUMERICAL |
| | DESIGNATIONS ON CALCULATIONS WHICH COULD NOT BE LOCATED |
| | ON PLANS. PLEASE SEE GARAGE PLANS. |
| | PLEASE SEE SOME WHERE THE ROOM DESIGNATION IS THERE |
| | HOWEVER IT SEEMS TO BE VERY LIGHT IN COLOR AND CAN NOT |
| | BE EASILY READ. PLEASE SEE OTHER AREAS WHICH THE |
| | FIXTURE DESIGNATION COVERS THE ROOM IDENTIFICATION OR |
| | VICE VERSA, THE FIXTURE TYPE COULD NOT BE SEEN DUE TO |
| | THE OVER LAY OF THE NUMERICAL DESIGNATION. |
| | PLEASE COORDINATE. A1-116-2-1.610 ETC |
| | FBC ADMIN SECTION 106.1.2, 106.1.3 |
| | |
| | 10) NOTE: PLEASE BE SURE ALL INFORMATION IS PROVIDED ON |
| | ALL FIXTURES AS SHOWN ON PLANS ON THE FIXTURE LEGEND. |
| | PLEASE KNOW THAT THE WATTAGE, TYPE ETC SHALL BE |
| | SPECIFIED AT THIS TIME. THESE CAN ALWAYS BE REVISED AT |
| | A LATER DATE. |
| | FBC 106.1.2,NEC 110.3, ETC |
| | |
| | 11) NOTE: PLEASE SEE THAT BATTERY BACK UP FIXTURES OF |
| | SOME TYPE WILL BE REQUIRED FOR THE FOLLOWING LOCATIONS. |
| | SOME ARE SHOWN ALREADY, HOWEVER NOT ALL. THE MAIN |
| | ELECTRICAL ROOM, THE FIRE COMMAND CENTER, BOTH FIRE |
| | PUMP ROOMS, ELEVATOR EQUIPMENT ROOM, AND AT THE |
| | LOCATION OF THE ROOF TOP GENERATOR WILL ALL REQUIRE |
| | THIS. PLEASE SEE THAT ALL STAIR TOWERS AND EGRESS PATHS |
| | SHALL ALSO INCLUDE SOME SORT OF BATTERY BACK UP |
| | FIXTURE. THERE ARE MANY LOCATIONS WHICH INCLUDE THIS; |
| | HOWEVER AS SOME OF THE FIXTURE INFORMATION IS NOT CLEAR |
| | AT THIS TIME THIS CAN NOT BE VERIFIED. THIS BUILDING IS |
| | EXPECTED TO BE OCCUPIED IN THE TIME OF POWER OUTAGES |
| | AND IN THE EVENT OF THE TRIPPING OF A SINGLE MEANS OF |
| | OVER CURRENT PROTECTION (EMSB1) OR GEN MAIN, THIS WILL |
| | PLACE MANY AREAS IN COMPLETE DARKNESS WHICH IS NOT |
| | PERMITTED. NEC 700.12E, 700.16, LS 101 7.9. |
| | |
| | 12) NOTE: PLEASE SEE LIGHTING CONTROL RISER WHICH |
| | INDICATES ALL LCP'S BEING FED FROM THE SAME PANEL? |
| | 1HA/LCP1A PLEASE ADJUST. |
| | |
| | 13) NOTE: PLEASE CORRELATE ALL LCP'S WITH THE HOUSE |
| | PANELS AND THE CIRCUITS FROM THE HOUSE PANELS WHICH |
| | FEED THESE LCP'S AND CIRCUITS. PLEASE SEE NUMEROUS |
| | CIRCUITS WHICH CONTAIN THE DESIGNATION OF "LC" NEXT TO |
| | THE CIRCUIT HOWEVER MANY WHICH DO GO THROUGH THE PANEL |
| | DO NOT? PLEASE COORDINATE. |
| | FBC106.1.2 ADMIN SECT. |
| | |
| | 14) NOTE: PLEASE SEE FIXTURE "E", PLEASE SEE IT APPEARS |
| | TO BE BATTERY BACK UP, BUT NOT ENOUGH INFORMATION IS |
| | PROVIDED. PLEASE SEE FIXTURES, Z,ETC. |
| | |
| | 15) NOTE: PLEASE SEE CIRCUITING FOR ATM ROOM/AREA AND |
| | THE CIRCUITING FOR THE FIRE COMMAND CENTER. PLEASE SEE |
| | PANEL SCHEDULE FOR 1LB2, 29 AND 31, ETC. PLEASE PROVIDE |
| | THE CORRECTED IDENTIFICATION FOR THE CIRCUITS AND |
| | DESIGNATIONS. |
| | FBC 106.1.2 ADMIN SECT. |
| | |
| | 16) NOTE: PLEASE PROVIDE ALL MINIMUM WIND LOADING FOR |
| | SITE LIGHTING LIGHT POLES, AND THAT OF THE POLES ON |
| | GARAGE ROOF STRUCTURE. PLEASE KNOW A DETAIL ON HOW |
| | THESE WILL BE ATTACHED ON PARKING DECK OF THE GARAGE |
| | AND POLE DETAIL FOR GROUND MOUNTED/BURIED POLES WILL BE |
| | REQUIRED. PLEASE KNOW ALL SHOW MEET THE FBC 140MPH |
| | (3SEC GUST) 120MPH SUSTAINED. |
| | THE STRUCTURAL CALCULATIONS WILL BE REVIEWED BY THE |
| | BUILDING PLAN REVIEWER. |
| | FBC 106.1.2 ADMIN SECT. |
| | |
| | 17) NOTE: PLEASE CLARIFY THE LOAD FOR THE LIGHTING IN |
| | THE COURTYARD AREA FOR FIXTURES SA1. PLEASE SEE 1GHEA |
| | INDICATES A LOAD OF 7500VA, YET THE 10 FIXTURES AT 400 |
| | EACH DO NOT CORRELATE TO THIS. PLEASE CLARIFY IN |
| | RESPONSE OF THE TOTAL LOAD IS BE FIGURED BASED ON THE |
| | INVERTER AT 7500/ |
| | FBC 106.1.2 |
| | |
| | 18) NOTE: PLEASE SEE OTHER SITE LIGHTING FIXTURES SB, |
| | WHICH IS 24 FIXTURES AT 70W'S EACH, YET THE LOAD ON THE |
| | PANEL SCHEDULE IS ACTUALLY HIGHER THAN THIS? PLEASE SEE |
| | 1GHA-18. |
| | |
| | 19) NOTE: PLEASE PROVIDE THE VOLTAGE DROP ON THIS SAME |
| | CIRCUIT AS NOTED ABOVE IN NOTE # 18, PLEASE SEE FIXTURE |
| | SA INDICATE #8?S, AND YET SB WHICH CONTAIN A LONGER RUN |
| | AND MORE FIXTURES ONLY INCREASE UP TO A #10 AWG. PLEASE |
| | SEE FBC 13-413.1.ABC.1.2. |
| | |
| | 20) NOTE: PLEASE PROVIDE A WORST CASE FOR BOTH FEEDER |
| | AND BRANCH CIRCUIT. |
| | 13-413.1ABC.1. |
| | IT IS NOTEDTHAT ON MANY OF THE PANEL SCHEDULES A VD % |
| | IS ALREADY SHOWN, HOWEVER PLEASE BE SURE TO INDICATE |
| | THE ABOVE. (CAN BE DONE ON A SIMPLE TYPICAL TABLE). FBC |
| | 106.1.2. |
| | |
| | 21) NOTE: PLEASE SEE THE 100% FIRE SPRINKLER PLANS |
| | SUBMITTED DO NOT CORRELATE WITH THE FA OR ELECTRICAL |
| | PLANS SUBMITTED WITH RESPECT TO THE FIRE PUMPS. PLEASE |
| | SEE THE FS SHEETS WHICH INDICATE ELECTRIC, ELECTRICAL/ |
| | DIESEL AND DIESEL. PLEASE SEE THE ELECTRICAL PLANS AND |
| | THE MANUFACTURE SPECS/CUT SHEETS SUBMITTED ONLY |
| | INDICATE DIESEL. |
| | PLEASE SEE THE MINIMUM FUEL TANK SIZE SHALL BE |
| | SUFFICIENT FOR A MINIMUM OF 8HRS AT 100% LOADS. IF |
| | ELECTRICAL AND BEING DRIVEN BY THE BACK UP POWER OF AN |
| | EMERGENCY GENERATOR, THE ON-SITE FUEL SUPPLY SHALL BE |
| | BASED ON THE 100% LOAD OF THE FIRE PUMP AND ALL OTHER |
| | LEGAL AND EMERGENCY STAND-BY LOADS AT 100% FOR TIMES |
| | REQUIRED. |
| | PLEASE SEE 2002 NFPA-110, TEXT EXTRACTED FORM THE |
| | CODE: |
| | 9.6.2.2 THE FUEL SUPPLY CAPACITY SHALL BE SUFFICIENT |
| | TO PROVIDE 8 HOURS OF FIRE PUMP OPERATION AT 100 |
| | PERCENT OF THE RATED PUMP CAPACITY IN ADDITION TO THE |
| | SUPPLY REQUIRED FOR OTHER DEMANDS. |
| | PLEASE SEE NFPA-20 2003 IF DIESEL DRIVEN AND THE SAME |
| | AMOUNT OF FUEL REQUIRED WHICH EQUALS 1GAL PER HP PER |
| | HOUR PLUS 5% FOR SUMP AND 5% FOR EXPANSION. PLEASE SEE |
| | THE FOLLOWING THE CODE. |
| | 11.4.3.1 FUEL SUPPLY TANK(S) SHALL HAVE A CAPACITY AT |
| | LEAST EQUAL TO 5.07 L PER KW (1 GAL PER HP), PLUS 5 |
| | PERCENT VOLUME FOR EXPANSION AND 5 PERCENT VOLUME FOR |
| | SUMP AND THE COMMENTARY SECTION AS FOLLOWS, A.11.4.3 |
| | THE QUANTITY 5.07 L PER KW (1 GAL PER HP) IS EQUIVALENT |
| | TO 0.634 L PER KW (1 PINT PER HP) PER HOUR FOR 8 |
| | HOURS. WHERE PROMPT REPLENISHMENT OF FUEL SUPPLY IS |
| | UNLIKELY, A RESERVE SUPPLY SHOULD BE PROVIDED ALONG |
| | WITH FACILITIES FOR TRANSFER TO THE MAIN TANKS. |
| | |
| | 22) NOTE: PLEASE BE SURE THE NFPA-20 2003 EDITION IS |
| | REFLECT ON ALL PLANS AS THE CURRENT CODE IN EFFECT FOR |
| | THE SCOPE OF WORK AND DESIGN RELEVANT TO THIS PROJECT. |
| | |
| | 23) NOTE: PLEASE SEE NEC 210.8B3 FOR ALL RECEPTACLES IN |
| | KITCHENS IN OTHER THAN DWELLING UNITS. PLEASE SEE THIS |
| | WOULD BE REQUIRED FOR CAFE/ KITCHENETTE AREAS AS SHOWN |
| | ON PLANS. |
| | |
| | 24) NOTE: PLEASE SEE MANY AREAS WHERE THE |
| | FUTURE/PROPOSED FURNITURE LAYOUTS WERE REMOVED FROM THE |
| | PLANS WHERE THEY WERE ON THE 50% AND THE 90% PLANS? |
| | PLEASE LOCATE BACK ON PLANS FOR REVIEW OF THE EGRESS |
| | PATHS AND LIFE SAFETY FOR MINIMUM WIDTHS ETC. THIS MAY |
| | ALREADY BE IN THE FIRE MARSHAL'S OFFICE REVIEW |
| | COMMENTS, HOWEVER IF NOT, THIS IS REQUIRED WHETHER OR |
| | NOT COMMENT IS MADE. |
| | LS 101 7.8, 7.9, 7.8.1.3, 7.9.2.2. |
| | |
| | 25) NOTE: PLEASE SEE MISSING THE PHOTO-METRICS FOR THE |
| | GARAGE STAIR TOWERS. PLEASE SEE THE PHOTO-METRICS AS |
| | SUBMITTED ARE A LITTLE CONFUSING. PLEASE PREVIOUS |
| | COMMENTS ONLY REQUESTED EGRESS PATHS OF LEVELS |
| | SURFACES/ CORRIDORS AND EGRESS PATHS THAT OF THE STAIR |
| | TOWERS. PLEASE SEE THERE MUCH INFORMATION SUBMITTED |
| | GIVING FIXTURE DESIGNATIONS AND ROOM BY ROOM LEVELS? |
| | PLEASE PROVIDE THE EGRESS PATHS INFORMATION INDICATING |
| | THE CLEAR NORMAL AND EMERGENCY LEVELS AS NEEDED AND |
| | REQUIRED BY CODE. |
| | PLEASE PROVIDE A BREAKDOWN OF THE NORMAL AND EMERGENCY |
| | AVERAGE. PLEASE SEE THAT INFORMATION OF WHICH IS |
| | SUPPLIED ON EACH "OVER-ALL" SHEET DOES NOT SUPPLY THE |
| | INFORMATION AS NEEDED. |
| | PLEASE SEE 9-4.1 WHICH INDICATES IN TITLE BLOCK, |
| | EMERGENCY/ NORMAL? |
| | |
| | 26) NOTE: PLEASE SEE 9-5.2 WHICH SEEMS TO INDICATE |
| | "DOUBLE FIXTURES" IN STAIR TOWER AREAS. |
| | PLEASE CLARIFY FOR EACH SECTION OF THE BUILDING AND ON |
| | EACH LEVEL. |
| | FBC 106.1.2 ADMIN SECTION. |
| | |
| | 27) NOTE: PLEASE CLARIFY GARAGE LIGHTING WHICH SHOWS |
| | "ON" NEXT TO SOME FIXTURES ON PLANS. (RAMP AREAS) THIS |
| | IS UNCLEAR AT THIS TIME WHAT IS MEANT BY THIS. |
| | FBC 106.1.2 ADMIN SECTION |
| | |
| | 28) NOTE: PLEASE PROVIDE A NOTE ON PLANS AND PLEASE BE |
| | SURE TO CORRELATE WITH THE MECHANICAL PLANS AS THE "XP" |
| | LCP'S ARE REQUIRED TO BE INSTALLED IN AREAS WITH LESS |
| | THAN 90% HUMIDITY AS REQUIRED BY THE MANUFACTURE. |
| | PLEASE BE SURE ALL ROOMS IN WHICH THESE PANELS ARE |
| | LOCATED SHALL BE CONDITIONED AS REQUIRED. PLEASE |
| | PROVIDE THE ADDITIONAL NOTE AND ANY CHANGES ON |
| | MECHANICAL PLANS ALONG WITH NOTE ON 5-3.0. |
| | 110.3, 90.7. |
| | |
| | 29) NOTE: PLEASE SEE MISSING LCPG.COULD NOT LOCATE ON |
| | PLANS, SCHEDULE, AND RISER OR ON PLANS. |
| | FBC 106.1.2ADMIN SECTION. |
| | |
| | 30) NOTE: PLEASE SEE MISSING THE ELECTRICAL ROOM FOR |
| | 1HMGB AND 1HMGA ON THE LAYOUTS FOR THE ELECTRICAL |
| | ROOMS. |
| | PLEASE PROVIDE. 106.1.2, |
| | NEC 110.26 |
| | |
| | 31) NOTE: PLEASE SEE MAIN ELECTRICAL ROOM AND THE |
| | MISSING ELECTRICAL ROOM FROM NOTE #30 ABOVE WHICH IS |
| | STILL INDICATING DOORS WITH AN "IN-SWING" WHICH IS NOT |
| | PERMITTED. PLEASE ALSO BE SURE TO ADD A NOTE WITH |
| | RESPECT TO PANIC HARDWARE REQUIRED FOR ALL DOORS AS |
| | REQUIRED PER 110.26. (MAIN ELECTRICAL ROOM/ AND ROOM |
| | NOTED ON NOTE #30). |
| | PLEASE SEE THE DOOR SWINGS WERE NOTED ON ALL OF THE |
| | REVIEWS BASED ON THE 50%, 90% AND THIS REVIEW. PLEASE |
| | GO OVER ALL PLANS AND DOORS. |
| | |
| | 32) NOTE: PLEASE SUBMIT THE MANUFACTURE SPECS/CUT |
| | SHEETS FOR AL THE TANK-LESS WATER HEATER UNITS. THESE |
| | MAY ALSO LABELED AS INSTA-HOTS. PLEASE SEE MISSING |
| | DISCONNECTS AS REQUIRED ON THESE UNITS. THESE COULD NOT |
| | BE LOCATED ON PLANS. |
| | PLEASE SEE SIZING OF THE OVER CURRENT DEVICES, |
| | DISCONNECTS AND ETC SHALL BE BASED ON EACH UNIT. PLEASE |
| | SEE 422.31, 110.3, AND 90.7. |
| | |
| | 33) NOTE: PLEASE SEE SOME TWH UNITS WHICH ARE SHOWN ON |
| | PLANS ARE MISSING THE REQUIRED CIRCUITING. CAN NOT |
| | REVIEW FOR COMPLIANCE OF LOAD, CONDUCTOR SIZE, OCP ETC |
| | AT THIS TIME. |
| | PLEASE COMPLETE. 240.4, 310.16, 408.4, FBC 106.1.2 |
| | |
| | 34) NOTE: PLEASE PROVIDE INFORMATION FOR FAIL SAFE |
| | OPERATION OF THE POWER OPERATED DOORS. THE FAILURE OF |
| | POWER SHALL NOT IMPEDE THE EGRESS FROM A BUILDING |
| | DURING A POWER FAILURE AT ANY TIME EVEN IF THESE |
| | CIRCUITS ARE ON THE BACK-UP GENERATOR. |
| | LS 101 7.19 |
| | THIS MAY BE IN THE FIRE MARSHAL'S REVIEW COMMENTS, |
| | HOWEVER IF NOT THIS ISSTILL REQUIRED. |
| | |
| | 35) NOTE: PLEASE ALSO PROVIDE THE FAIL SAFE OPERATION |
| | OF THE GATES AT THE GARAGE. |
| | THE SAME NOTE AS ABOVE FOR GATES. |
| | |
| | 36) NOTE: PLEASE SEE THERE ARE SEVERAL ELECTRICAL ROOMS |
| | ON PLANS WHICH THE GROUND BAR IS BEING IN THE DOOR WAY? |
| | THIS IS APPEARS TO BE A MISPRINT. PLEASE CORRECT AND |
| | ADJUST PLANS AS NEEDED. |
| | FBC 106.1.2, NEC 110.26 |
| | |
| | 37) NOTE: PLEASE SEE ELECTRICAL ROOM LAYOUT AS THERE |
| | ARE SOME PANELS WHICH ARE SHOWN IN THE DOOR WAY OR |
| | PROTRUDING INTO THE DOOR WAY. THIS SEEMS TO BE AN |
| | OVERLAY/MISPRINT ISSUE AS NOTED ABOVE. |
| | 110.26. |
| | |
| | 38) NOTE: PLEASE SEE ELECTRICAL ROOM'S LAYOUTS WHICH |
| | ARE MISSING WALLS AND DOORS. PLEASE SEE 2ND, 3RD, AND |
| | 4TH FLOORS ROOM #4. 4-2.0,4- 3.0,4-4.0 |
| | CAN NOT VERIFY SOME CODE RELATED ITEMS AT THIS TIME. |
| | 110.26. |
| | FBC 106.1.2 ADMIN SECTION. |
| | |
| | 39) NOTE: PLEASE SEE ELECTRICAL ROOM LAYOUTS WHICH ARE |
| | SHOWING PANELS WHICH ARE NOT ON ANY RISER, PANEL |
| | SCHEDULES ETC. PLEASE ALSO SEE TRANSFORMERS BEING SHOWN |
| | WHICH ARE NOT LABELED ALSO? |
| | PLEASE LABEL AS "FUTURE" IF INDEED THE SPACE IS BEING |
| | ALLOTTED FOR FUTURE EXPANSION WHICH IS REQUIRED BY CODE |
| | UNDER 90.8, 110.26 |
| | |
| | 40) NOTE: PLEASE BE SURE TO LABEL ALL LCP?S ON PLANS, |
| | ELECTRICAL ROOMS, RISER AND CORRELATE WITH THE LCP'S |
| | SCHEDULE.9EXAMPLE LCP1D, LCP3B, ETC) |
| | FBC 106.1.2, 106.3.5.1.2 |
| | |
| | 41) NOTE: PLEASE SEE ELECTRICAL ROOM LAYOUTS, SOME SHOW |
| | TRANSFORMER SIZES AND SOME DO NOT. PLEASE COMPLETE AND |
| | SHOW. |
| | 450, FBC 106.1.2, 110.26, 450.9, ETC |
| | |
| | 42) NOTE: PLEASE SEE ELECTRICAL ROOM LAYOUTS INDICATE |
| | WHAT IS BEING SHOWN AS "NAC" PANELS; HOWEVER IT IS |
| | UNCLEAR WHAT THESE ARE? PLEASE EXPLAIN. |
| | FBC 106.1.2, 106.3.5.1.2 |
| | |
| | 43) NOTE: PLEASE SEE "SHADED" AREAS ON MEZZANINE LEVEL |
| | PLANS E-1.1.4, PLEASE CLARIFY |
| | 106.1.2 FBC ADMIN SECTION. |
| | |
| | 44) NOTE: PLEASE SEE STAIR TOWERS WHICH ALSO INDICATE |
| | AN ELECTRICAL ROOM IN THE STAIRWELL. THIS APPEARS TO BE |
| | SOME SORT OF MISPRINT. THIS IS BEING SHOWN ON MORE THAN |
| | ONE FLOOR AND LOCATION. PLEASE BE SURE TO CORRELATE |
| | WITH ALL OTHER PLANS. |
| | FBC 106.1.2 |
| | *** ONLY AS NOTED, IT IS KNOWN THAT NO ELECTRICAL |
| | EQUIPMENT OR OTHER ITEMS ARE PERMITTED IN EXIT |
| | STAIRWAYS UNLESS PERTAINING TO STAIRWAYS. |
| | |
| | 45) NOTE: PLEASE SEE OTHER SHEETS WHICH INDICATE THE |
| | OPENING FOR THE DOOR LEADING INTO THE STAIRS ACTUALLY |
| | THROUGH WHAT WOULD BE THE LOW VOLTAGE ELECTRICAL DATA |
| | ROOM. WHERE THE SANE LOCATION IS SHOWING WHAT APPEARS |
| | TO BE A DOOR ON THE SHEER/RATED STAIRWAY WALL. PLEASE |
| | SEE THIS IS SHOWN LIKE THIS AT MANY LOCATIONS AND ON |
| | MULTIPLE FLOORS. PLEASE BE SURE TO COORDINATE LAYERS, |
| | LEVELS, AND SHEETS FOR ALL. |
| | FBC 106.1.2 ADMIN SECTION. |
| | |
| | 45) NOTE: PLEASE SEE WHAT APPEARS TO BE MISSING WALLS, |
| | DOORS SEPARATION E-1-1.2, LIBRARY/MUSEUM/ STORE? PLEASE |
| | SHOW AS THE REQUIREMENTS FOR CHAPTER 13 CAN NOT |
| | VERIFIED FOR CONTROL OF LIGHTING. LIGHTING OF SOME TYPE |
| | INCLUDING EXIT/EMERGENCY LIGHTS ARE STILL REQUIRED IN |
| | SPACE, EVEN IF FOR FUTURE BUILD OUT. PLEASE SEE LS 101 |
| | 7.8, 7.9 AND POSSIBLE COMMENTS FROM FIRE MARSHAL?S |
| | OFFICE. |
| | 13-415.1.ABC.1.ABC.1.1, .1.2, .1.3 |
| | |
| | 46) NOTE: PLEASE VERIFY LIGHTING POWER DENSITIES FOR |
| | GARAGE. SOME OF WHICH WERE NOTED ABOVE IN COMMENTS FOR |
| | CHAPTER 13 REQUIREMENTS, HOWEVER THIS IS ALSO BE NOTED |
| | SEPARATELY. |
| | PLEASE SEE CONTROL MEANS. |
| | SEE FBC CHAPTER 13. (ALL) |
| | |
| | 47) NOTE: PLEASE PROVIDE AN ELEVATION/DETAIL FOR ALL |
| | ELECTRICAL CONDUITS BEING RUN FROM GARAGE TO THE MAIN |
| | BUILDING. THIS BUILDING IS BEING CONSIDERED "ATTACHED" |
| | AND ONE " BUILDING" BY DEFINITION, HOWEVER DUE THE |
| | UNDERSTANDING OF MANY OF THE CONDUITS ARE NOW BEING |
| | INSTALLED IN THE SLAB OR UNDER GROUND AND THE AMOUNT OF |
| | OTHER CONDUITS, PIPING, BEING INSTALLED IN THIS SAME |
| | AREA, IT IS OF CONCERN FOR THE SPACE REQUIREMENTS FOR |
| | BUNDLING OF CONDUITS, DE-RATING OF CONDUCTOR |
| | AMPACITIES. ETC. (THIS CAN BE A DETAIL LIKE A DUCT-BANK |
| | DETAIL) |
| | FBC 106.1.2, 310.16, 300.8, 300.10, 310.10, 310.15, |
| | 310.16, 300.17 ETC. |
| | THERE ARE MANY SECTIONS WHICH COULD BE REFERENCED. |
| | PLEASE ALSO SEE COMMENT WITH RESPECT TO WIRING METHODS |
| | OF EMERGENCY FEEDERS ETC. |
| | |
| | 48) NOTE: PLEASE VERIFY THE SHUNT TRIP FOR THE 4TH |
| | FLOOR IT PANEL. PLEASE SEE THIS SHUNT TRIP BREAKER |
| | SHOULD BE LOCATED IN 1HEE. PLEASE ALSO SEE THAT PLANS |
| | INDICATE WHAT SEEMS TO BE A PUSHBUTTON AT ONE DOOR |
| | LABELED EPO, AND ONE WHICH APPEARS TO BE THE SAME |
| | HOWEVER NOT LABELED AS EPO.PLEASE LABEL. AN EPO WILL |
| | BE REQUIRED AT EACH DOOR. |
| | PLEASE SEE 645.10, HANDBOOK WHICH EXPLAINS THE |
| | DISCONNECTING AT THEIR SUPPLY POINT. |
| | |
| | 49) NOTE: PLEASE KNOW AS NO INFORMATION FOR THE IT ROOM |
| | EQUIPMENT IS BEING SUBMITTED WITH THIS RECORD SET OF |
| | PLANS, PLEASE PLACE NOTE AND CLOUD ON 4TH FLOOR POWER |
| | PLANS THAT ALL ELECTRICAL EQUIPMENT, UPS, SERVER |
| | EQUIPMENT ETC IN THE IT ROOM SHALL BE UNDER A SEPARATE |
| | PERMIT, PLANS, AND FEES BASED ON THE EQUIPMENT BEING |
| | INSTALLED IN THIS ROOM. REVIEW FOR CODE COMPLIANCE FOR |
| | THIS ROOM CAN NOT BE COMPLETED AT THIS TIME. THE |
| | REQUIREMENTS FOR THE CONSTRUCTION OF THIS ROOM IS |
| | REQUIRED AT THIS TIME, INCLUDING THE MINIMUM 1HRA |
| | RATING, THE FIRE DAMPERS ETC (IF APPLICABLE) AND THE |
| | SHUT DOWN OF AN AND ALL A/C EQUIPMENT. |
| | NEC 645, NFPA-75 |
| | |
| | 50) NOTE: PLEASE PLACE NOTE ON THE LIGHTNING PROTECTION |
| | PLANS, BOTH THE LAYOUT OF THE SYSTEM AND THE SYSTEM |
| | DETAIL. |
| | THESE PLANS MAY BE USED FOR REFERENCE OF PERMITTING |
| | PROJECT; HOWEVER SEPARATE PERMIT AND FEES WILL BE DUE |
| | UPON APPLICATION. THE LP SYSTEM IS NOT PART OF THE |
| | VALUE FOR SCOPE OF WORK. |
| | PLEASE ALSO NOTE THAT SYSTEM MUST BE INSTALLED BY A |
| | LICENSED LIGHTING PROTECTION CONTRACTOR WHO WILL |
| | PROVIDE A MASTER UL CERTIFICATION OF THE SYSTEM UPON |
| | COMPLETION. |
| | (OR WORDS TO THAT AFFECT) |
| | |
| | 51) NOTE: PLEASE SEE LOADS FOR RECEPTACLE CIRCUITS |
| | SHALL BE BASED ON 180VA MINIMUM FOR CIRCUITS. PLEASE |
| | SEE CIRCUITS FOR WHAT IS A "J" BOX FOR FUTURE MODULAR |
| | FURNITURE IS LABELED AS RECEPTACLES? PLEASE LABEL FOR |
| | THE INTENDED USE. |
| | 408.4, 220.10 |
| | |
| | 52) NOTE: PLEASE SEE PLANS WHICH INDICATE A TRIANGULAR |
| | SYMBOL WITH A "F" NEXT TO THESE HOWEVER COULD NOT ANY |
| | INFORMATION ON WHAT THESE ARE ON ANY SYMBOL LEGEND? |
| | PLEASE REMOVE OR DESIGNATE. |
| | FBC 106.1.2 |
| | |
| | 53) NOTE: PLEASE COORDINATE ALL OVER-LAYS AND LAYOUTS |
| | FOR ELECTRICAL, MECHANICAL, PLUMBING, BUILDING AND ALL |
| | OTHER TRADE PLANS. PLEASE KNOW THE ELECTRICAL 100% |
| | PLANS DO NOT SHOW THE SAME ELECTRICAL ROOMS AND |
| | EQUIPMENT AS THE 100% MECHANICAL PLANS, PLUMBING OR |
| | BUILDING PLANS ALONG WITH OTHER SHEETS FROM OTHER |
| | TRADES. |
| | REVIEW OF ALL APPLICABLE ITEMS WILL STILL NEED TO BE |
| | DONE AS REQUIREMENTS FOR ELECTRICAL AND OTHER TRADES |
| | WILL MOST CONTAIN CLEAR CONFLICTS WHICH MAY OR MAY NOT |
| | BE PERMITTED. |
| | 110.26, 240.24 NEC. |
| | FBC 106.3.5.1.1 ADMIN SECTION FOR ALL TRADES FOR |
| | COMMERCIAL PLANS. |
| | |
| | 54) NOTE: PLEASE CORRELATE THE PLANS WITH THE |
| | MANUFACTURE SPECS/CUT SHEETS FOR THE GENERATOR WHICH IS |
| | BEING SUBMITTED AS A LARGER UNIT IN THE SPEC BOOK AS |
| | SHOWN ON PLANS. THIS WILL AFFECT THE FUEL SUPPLY, AND |
| | THE FUEL LINE SUPPLY FOR THE PROPOSED NATURAL GAS |
| | LINE. |
| | 90.7, 110.3, |
| | FBC 106.1.2 |
| | |
| | 55) NOTE: PLEASE INCLUDE DETAIL AND ATTACHMENT FRO THE |
| | LIGHTNING PROTECTION SYSTEM AS PART OF THE MAIN |
| | GROUNDING ELECTRODE SYSTEM AS REQUIRED PER 250.106. IT |
| | IS NOTED THAT THE DETAIL IN THE LP DETAILS IN THE REAR |
| | OF PLANS, HOWEVER DOES NOT INCLUDE THE GE SYSTEM, OR |
| | THE GE RISER, SYSTEM DOES NOT INCLUDE THE LP GROUNDING |
| | ATTACHMENT. |
| | |
| | 56) NOTE: PLEASE INCLUDE ALL OTHER METAL WATER PIPING |
| | SYSTEMS AS PART OF THE GROUNDING ELECTRODE SYSTEM AS |
| | REQUIRED PER 250.106. (FIRE SPRINKLER) |
| | |
| | 57) NOTE: PLEASE SEE SOME BATHROOMS CONTAIN OC SENSORS |
| | AND MANY DO NOT, PLEASE EXPLAIN AND PLEASE SEE OTHER |
| | COMMENTS FOR TYPE OF DEVICES WHICH WILL BE REQUIRED. |
| | 13-415.1.ABC.1.2 |
| | |
| | 58) NOTE: PLEASE KNOW SOME SORT OF BATTERY BACK UP |
| | FIXTURE WILL BE REQUIRED IN THE LARGER BATHROOMS (ROOM |
| | OTHER THAN SINGLE POINT OF USE). |
| | PLEASE SEE LS 101 7.8., 7.9 |
| | THIS WAS DISCUSSED WITH THE FIRE MARSHAL CHIEF AND WILL |
| | BE REQUIRED BOTH BY THIS OFFICE AND THE FIRE MARSHAL'S |
| | OFFICE IN THE INTEREST OF LIFE SAFETY AND CODE AS |
| | REFLECT. |
| | |
| | 59) NOTE: PLEASE SEE NUMEROUS OFFICES ON ONE CIRCUITS |
| | COMING FROM THE LIGHTING CONTROL PANEL(S). PLEASE SEE |
| | THE FOLLOWING SCENARIO: IN THE EVENT OF AFTER HOURS, |
| | THE TIMER ?SWEEPS? THROUGH AND TURNS OFF THAT |
| | PARTICULAR CIRCUIT, AND EMPLOYEE WILL "RESET" THE |
| | SENTRY SWITCH WHICH IN-TURN TURN THAT BRANCH CIRCUIT |
| | BACK ON. WOULD THAT NOT IN-TURN ON OTHER LIGHTS ON THAT |
| | CIRCUIT. (OTHER ROOMS, OFFICES ETC?) |
| | PLEASE SEE PREVIOUS NOTE ABOVE #9 WHICH ALSO TOUCHED ON |
| | THE LIGHTING CONTROL SYSTEM BEING PROPOSED, HOWEVER |
| | THERE ARE SCENARIOS WHICH ARE STILL IN QUESTION OR NEED |
| | TO BE WORKED OUT. |
| | 13-415.1.ABC.1.1 |
| | |
| | 60) NOTE: PLEASE SEE MISSING CONTROLS FOR ELEVATOR PIT |
| | LIGHTS. 13-415.1.ABC.1.2, |
| | 620.24B. |
| | |
| | 61) NOTE: PLEASE SEE THERE ARE SOME LOCATIONS ON PLANS |
| | WHICH ARE SHOWING "NL'S" (NIGHT LIGHTS) BEING PART OF A |
| | PERMANENT ON SCENARIO, HOWEVER THE NUMBER OF FIXTURES |
| | BEING PROPOSED TO REMAIN ON AS NIGHT LIGHTS ARE OVER |
| | WHAT IS BEING CONSIDERED AS NORMAL. PLEASE KNOW THIS |
| | CAN BE GONE OVER, HOWEVER PLEASE SEE SOME AREAS WHERE |
| | THERE ARE 10-20PLUS LIGHTS BEING LEFT ON. |
| | THE INTENT OF CHAPTER 13 AND ALSO THE INTEREST OF LIFE |
| | SAFETY SHOULD BE CONSIDERED. PLEASE CALL TO OVER. SEE |
| | SHEET E2-1.2 FOR EXAMPLE IN LOBBY AREA. |
| | |
| | 62) NOTE: PLEASE SEE NFPA-20 11.3, 11.3.2, 11.3.2.3 AND |
| | FLORIDA FIRE PREVENTION CODE , NFPA-1 7-4FOR OTHER |
| | REQUIREMENTS FOR FIRE PUMPS AND ROOMS IN WHICH THEY ARE |
| | LOCATED. |
| | PLEASE ALSO SEE 11.4.6.2 FUEL PIPING SHALL NOT BE |
| | GALVANIZED STEEL OR COPPER. |
| | PLEASE KNOW AS PART OF THE COMPLETED TESTING AND |
| | ACCEPTANCE AS REQUIRED IN CHAPTER 14, DOCUMENTATION FOR |
| | TESTING FOR FIRE PUMP ON A WEEKLY BASIS IS REQUIRED TO |
| | THE OWNER OF RECORD.CODE TEXT FROM NFPA-20: 11.6.1.1 |
| | ENGINES SHALL BE STARTED NO LESS THAN ONCE A WEEK AND |
| | RUN FOR NO LESS THAN 30 MINUTES TO ATTAIN NORMAL |
| | RUNNING TEMPERATURE. |
| | |
| | 63) NOTE: PLEASE SEE NFPA-110 CHAPTER 7 FOR THE |
| | INSTALLATION OF THE GENERATOR. PLEASE SEE 7.4 AND 7.5, |
| | PROVIDE DETAIL FOR MOUNTING OF UNIT TO ALLEVIATE ANY |
| | INTEGRITY INTERFERENCE OF THE STRUCTURE. |
| | |
| | 64) NOTE: PLEASE SUBMIT THE SPEC/CUT SHEET FOR THE |
| | PROPOSED MTS. THE "KIRK KEY" AS SHOWN AND HAND WRITTEN |
| | ON SPECS IS NOT ACCEPTED AT THIS TIME. THERE ARE MANY |
| | OF THESE SYSTEMS ON THE MARKET WHICH WILL PERMIT THE |
| | POWER FROM TWO SOURCES AT ONCE WHICH IS STRICTLY |
| | PROHIBITED. PLEASE SEE 700.6, 701.7, 110.3, AND 90.7 |
| | CAN NOT VERIFY AT THIS TIME. PLEASE ALSO SEE THE |
| | FOLLOWING COMMENT. |
| | |
| | 65) NOTE: PLEASE SEE RISER AND PLANS WERE REVISED FROM |
| | THE 50% AND 90% PLANS CHANGING ALL ATS UNITS TO 3-POLE |
| | UNITS. PLEASE SEE ALTHOUGH GF PROTECTION IS NOT |
| | REQUIRED ON THE EMERGENCY SIDE OF THE EMERGENCY SYSTEM |
| | AND LEGALLY REQUIRED SYSTEMS, PROPER GROUND FAULT |
| | SENSING IS REQUIRED. PLEASE KNOW DOCUMENTATION FROM |
| | MORE THAN ONE MANUFACTURE WAS SENT TO THE ENGINEER |
| | PRIOR TO THE REVIEW WHEN THE PLANS WERE SUBMITTED ON |
| | THE 7TH OF NOV. PLEASE SEE NFPA-110 6.2.15** ISOLATION |
| | OF NEUTRAL CONDUCTORS. PROVISIONS SHALL BE INCLUDED FOR |
| | ENSURING CONTINUITY, TRANSFER, AND ISOLATION OF THE |
| | PRIMARY AND THE EPS NEUTRAL CONDUCTORS WHEREVER THEY |
| | ARE SEPARATELY GROUNDED TO ACHIEVE GROUND-FAULT |
| | SENSING. |
| | PLEASE SEE AN ATTACHED BRIEF EXPLANATION FROM"ASCO" |
| | WHITE PAPER: WHERE GROUND FAULT PROTECTION IS TRIGGERED |
| | BY THE CODE AND AN ALTERNATE POWER SUPPLY IS INCLUDED, |
| | SWITCHING OF THE NEUTRAL BECOMES NECESSARY. THE CIRCUIT |
| | SHOWN ABOVE ILLUSTRATES SUCH A CIRCUMSTANCE. THE |
| | SERVICE IS LARGER THAN 1,000 AMPS. CONSEQUENTLY, GROUND |
| | FAULT PROTECTION IS REQUIRED AT THE MAIN SERVICE |
| | DISCONNECT AT A MINIMUM. IF IT IS INSTALLED THERE AND |
| | THE GENERATOR NEUTRAL GROUNDING WAS THROUGH A SOLID |
| | CONNECTION TO THE MAIN SERVICE NEUTRAL, A GROUND FAULT |
| | WHEN THE GENERATOR IS FEEDING THE LOAD WILL CAUSE THE |
| | MAIN SERVICE DISCONNECT TO OPEN. THIS WILL NOT |
| | DISCONNECT THE ARCING FAULT FROM THE GENERATOR. |
| | COORDINATION IS THUS LOST." |
| | PLEASE KNOW BASED ON THE INFORMATION FROM SEVERAL |
| | MANUFACTURES AND THE CODE PLEASE ADJUST AS REQUIRED. |
| | PLEASE ALSO SEE GENERATOR GROUNDING DETAIL WILL BE |
| | REQUIRED TO BE REVISED. |
| | PLEASE SEE E5-1.1.18 WHICH NOTES A #3 CONDUCTOR, WHICH |
| | WOULD NOT BE LARGE ENOUGH. |
| | PLEASE SEE 250.20, 250.30, 250.66, 240.13, 230.95, |
| | 700.7D, 700.26 |
| | PLEASE SEE THE MTS. |
| | |
| | 66) NOTE: PLEASE SEE THERE ARE MANY EXIT/EMERGENCY |
| | LIGHTS WHICH DO NOT SHOW ANY CONNECTION TO ANY LOCAL |
| | CIRCUIT IN ANYWAY. PLANS NOTE THIS AND MANY ARE SHOWN |
| | THIS WAY, HOWEVER NOT ALL. PLEASE GO THROUGH PLANS. |
| | PLEASE SEE 700.12E WHICH REQUIRES THE BRANCH CIRCUIT |
| | FEEDING THE UNIT EQUIPMENT SHALL BE THE SAME BRANCH |
| | CIRCUIT AS THAT SERVING THE NORMAL LIGHTING IN THE AREA |
| | AND CONNECTED AHEAD OF ANY LOCAL SWITCHES. |
| | |
| | 67) NOTE: PLEASE SEE OVER ALL 3RD FLOOR PLANS, WHICH |
| | SEEM TO BE SHOWING LIGHTING OF SOME KIND ON GARAGE |
| | PLANS? |
| | PLEASE ALSO SEE E2-4.0 |
| | FBC 106.1.2 ADMIN SECTION. |
| | |
| | 68) NOTE: PLEASE SEE NOTE #2 ON RISER WITH RESPECT TO |
| | THE MTS WHICH IS TO PROVIDE FUTURE PROVISIONS FOR |
| | POSSIBLE PORTABLE GENERATOR TO RUN THE EMERGENCY |
| | SYSTEMS, PLEASE KNOW A DETAIL TO A LOCATION AND HOW |
| | THIS CONNECTION WILL BE MADE IS REQUIRED.THE RUNNING |
| | OF CORDS, CONDUCTORS ETC SHALL BE PERMITTED TO TRAVEL |
| | THROUGH THE ELECTRICAL ROOM DOORS, ON SIDEWALK AREAS OR |
| | ANY LOCATIONS PROVIDING A TRIPPING HAZARD OR NOT |
| | SECURING LIVE PARTS ETC. |
| | PLEASE PROVIDE A DETAIL AS THIS CONNECTION POINT WILL |
| | BE SUBSTANTIAL IN NATURE. (J-BOX) ETC ON THE OUTSIDE OF |
| | BUILDING ETC. |
| | 110.26, 110.27, NEC 527. |
| | |
| | 69) NOTE: PLEASE PROVIDE CALCULATIONS ON NEUTRAL |
| | CONDUCTORS FOR ALL NON-LINEAR CIRCUITS. PLEASE SEE ALL |
| | CIRCUITS WHICH CONTAIN THESE LOADS SHALL MEET THE |
| | SIZING REQUIREMENTS TO HANDLE AND ALLEVIATE THE OVER |
| | LOADING OF THE NEUTRAL ON A 3-PHASE 4-WIRE SYSTEM WITH |
| | PREDOMINATELY OR ACTUALLY IN MANY CASES ALL NON-LINEAR |
| | LOADS. PLEASE SEE THIS CAN BE DONE BY USING MANY |
| | METHODS. THE K-RATED TRANSFORMERS WERE REMOVED FROM THE |
| | DESIGN AS ON PREVIOUS PLANS, SO PLEASE SEE THE REQUEST |
| | FOR FULL NEUTRAL LOAD CALCULATION OR THE SIZING OF THE |
| | NEUTRAL AT 200%. |
| | PLEASE SEE THE RISK OF FIRE AND CAUSE TO PROPERTY |
| | DAMAGE IS OF CONCERN PLEASE SEE STUDIES IN WHITE PAPERS |
| | WHICH INDICATE AS MUCH AS 1.7 TIMES THE RATED LOAD OF |
| | THE CONDUCTOR. |
| | PLEASE SEE THE FOLLOWING CODES: THIS OFFICE IS AWARE OF |
| | WHAT A FPN MEANS, HOWEVER SEE SECTIONS GIVEN WHICH DO |
| | NOT CONTAIN FPN. 210.4A (FPN), 220.22 (FPN(2), 310.10, |
| | 310.15B4(C), 400.5, 520.44, 408.16, AND FBC 104.6 |
| | ADMINISTRATIVE SECTION AS ADOPTED BY THE CITY OF WEST |
| | PALM BEACH. |
| | |
| | 70) NOTE: PLEASE SEE E2-4.2 STAIR TOWER AREA WHICH |
| | MENTIONS "HOLD FOR ARCHITECT" ? PLEASE SEE PREVIOUS |
| | NOTE WITH RESPECT TO DOORS INTO STAIRWAYS ETC. |
| | FBC 106.1.2 ADMIN SECTION. |
| | |
| | 71) NOTE: PLEASE KNOW IF IT IS THE INTENT TO UTILIZE |
| | THESE PLANS FOR FUTURE LOW VOLTAGE WORK FOR LOCATIONS |
| | OF PHONE, DATE DROP ETC, PLEASE COMPLETE PLANS AS |
| | SUBMITTED SHOWING ALL LOCATIONS FOR DROPS.PLEASE SEE |
| | MANY AREAS WHICH LOW VOLTAGE DATE/PHONE DROPS WILL BE |
| | REQUIRED OR INSTALLED, HOWEVER THESE LOCATIONS ARE NOT |
| | BEING SHOWN AT THIS TIME. |
| | IF THE LV SCOPE IS PART OF THE PERMITTED PLANS AS |
| | SUBMITTED PLEASE REMOVE AND NOTE AS UNDER SEPARATE |
| | PERMIT PLANS AND FEES. |
| | |
| | 72) NOTE: PLEASE PROVIDE VD FOR THE FEEDER FOR THE IT |
| | PANEL. 13-413.1.ABC.1.1 |
| | |
| | 73) NOTE: PLEASE SEE 700.9D FOR THE FEEDERS FROM THE |
| | GENERATOR TO THE EMSB1 AND THE FEEDERS OUT TO SYSTEMS |
| | WHICH MAY BE CONSIDERED INSIDE THE BUILDING. PLEASE SEE |
| | THE CODE AS THERE ARE WAYS TO MEET THE INSTALLATION OF |
| | THESE FEEDERS, HOWEVER PLANS SHALL INDICATE WHICH WILL |
| | BE USED. (TYPE OF CABLE, ENCASED IN 2INCHES OF |
| | CONCRETE, FULLY SPRINKLED ETC) |
| | PLEASE KNOW AS THE REQUIREMENT OF FULLY SPRINKLED IS |
| | OFTEN MISTAKEN AS A BUILDING CONTAINING SPRINKLERS. |
| | THIS IS NOT THE CASE. PLEASE SEE THE INTENT OF 700.9D |
| | FOR THIS HAS ALWAYS BEEN THAT ALL AREAS CONTAINING |
| | THESE FEEDERS BE SPRINKLED IF INSTALLED IN OPEN OR |
| | ABOVE CEILINGS. PLEASE KNOW A COMMENTARY IN THE 2005 |
| | NEC MAKES IS CLEAR WHAT THE INTENT OF THE CODE AND THE |
| | FURTHER EXPLANATION IS PROVIDED. |
| | |
| | 74) NOTE: PLEASE SEE NOTE WHICH MENTIONS A "LOCK-OFF" |
| | DEVICE IS REQUIRED FOR THE FIRE ALARM CIRCUIT. THIS IS |
| | OK; HOWEVER PLEASE ELABORATE ON THE NOTE AS THE DEVICE |
| | SHALL BE AN INTEGRAL PART OF THE BREAKER. PLEASE KNOW |
| | THAT SNAP ON/CLIP ON TYPE DEVICES ARE NOT ACCEPTABLE TO |
| | THIS AHJ. |
| | 110.3, 90.4 |
| | |
| | 75) NOTE: PLEASE SEE TRANSFORMER TYPICAL DETAIL WHICH |
| | INDICATES #6 FOR 75KVA TRANSFORMERS. PLEASE SEE |
| | 250.30A2 AND 250.66 FOR THE SIZE ACCORDING TO THE |
| | 4/0'S. |
| | PLEASE ADJUST. THIS WILL AFFECT THE SIZE TO THE GROUND |
| | BAR ONLY IN EACH ROOM FROM THIS TRANSFORMER. |
| | |
| | 76) NOTE: PLEASE PROVIDE THE SIZE OF THE CONDUCTOR ON |
| | THE GROUNDING ELECTRODE RISER AS PROVIDED. PLEASE SEE |
| | THE GROUNDING ELECTRODE DETAIL SHOWS A 4/0'S, HOWEVER |
| | PLEASE SEE E5-2.0. |
| | 250.50, 250.58 |
| | |
| | 77) NOTE: PLEASE SEE THE SIZE OF THE CONDUCTORS ON THE |
| | SECONDARY SIDE OF ANY TRANSFORMER SHALL BE SIZED AND |
| | TERMINATE IN OVER-CURRENT PROTECTION WHICH LIMITS THE |
| | LOAD ON THE CONDUCTORS. PLEASE SEE 240.21C, 310.16. |
| | PLEASE SEE 1LD2 |
| | |
| | 78) NOTE: PLEASE SEE 4HA, WHICH INDICATE 114A'S OF LOAD |
| | ON A BREAKER RATED AT 100A?S. PLEASE ALSO SEE 5HA WHICH |
| | SHOWS A LOAD OF 99A'S ON A 100A BREAKER. |
| | PLEASE ADJUST AS REQUIRED AS THE LOADS SHALL NOT EXCEED |
| | THAT OF THE RATING OF THE BREAKER, FEEDERS ETC. 310.16, |
| | 240.4, ETC. |
| | |
| | 79) NOTE: PLEASE SUBMIT LOAD CALCULATIONS. PLEASE |
| | INDICATE AND SHOW ALL CONTINUOUS LOADS AND LARGEST |
| | MOTOR LOADS AT 125%. |
| | 220.3, 220.10, 220.11, 220.13, 215.3,230.42 ETC |
| | |
| | 80) NOTE: PLEASE SEE SOME SHEETS ON THE UPPER LEVELS, |
| | 1-5.2, 8-5.2 INDICATE A "VAULT", HOWEVER THIS WAS |
| | COMMENTED ON PREVIOUS REVIEWS AND WAS REMOVED FROM SOME |
| | SHEETS. PLEASE SEE A SHEET FOR THE SW CORNER OF PROJECT |
| | AFTER E6-2.1 IF THIS IS INDEED THE SAME AREA. PLEASE |
| | CLARIFY. |
| | FBC 106.1.2 ADMIN SECTION. |
| | |
| | 81) NOTE: PLEASE SEE PREVIOUS NOTES WITH RESPECT TO |
| | MINIMUM FOOT CANDLES REQUIRED. PLEASE SEE GARAGE SHALL |
| | CONTAIN EGRESS PATHS WHICH MEET THIS MINIMUM. BASED ON |
| | SOME AREAS SHOWN ON PHOTO-METRICS, IT DOES NOT APPEAR |
| | THIS IS MET. |
| | PLEASE SEE LIFE SAFETY CODE NFPA-101 2003 7.8.1.3, |
| | 7.9.2.2 |
| | |
| | 82) NOTE: PLEASE SEE WHAT IS KNOW AS STAIR #9, MORE |
| | THAN ONE FIXTURE BEING SHOWN ON THE SAME LEVEL ON THE |
| | SAME WALL. THIS IS OK, HOWEVER ONLY A NOTE FOR |
| | VERIFICATION. |
| | E9-2.2 |
| | |
| | 83) NOTE: PLEASE CORRELATE THE TRANSFORMERS ON THE |
| | ELECTRICAL ROOM LAYOUTS AND THE ELECTRICAL RISER. |
| | PLEASE SEE THERE ARE MANY WHICH ARE SHOWN AS 15KVA ON |
| | ONE SHEET AND 45KVA ON OTHER SHEETS OR 45KVA ON ONE AND |
| | 75KAV ON ANOTHER. PLEASE ALSO SEE RISER. |
| | PLEASE SEE SOME BELOW AS NOTED, THIS IS ONLY SOME AND |
| | IS IN NO WAY ALL POSSIBLE. |
| | 1HB, 75KVA ON RISER, 45KVA IN ELECTRICAL ROOM. 2HB, |
| | 75KVA ON RISER, 45KAV IN ELECTRICAL ROOM. 1GLA-1GHA, |
| | 45K ON RISER, 15K ON ELECTRICAL ROOM PLANS. ETC |
| | |
| | 84) NOTE: PLEASE BE SURE TO GO THROUGH ALL TRANSFORMERS |
| | AS THE SIZES AS SHOWN MAY AFFECT THE OVER CURRENT |
| | PROTECTION ON UNITS, THE CONDUCTORS ON THE PRIMARY AND |
| | SECONDARY SIDE OF THE UNITS. PLEASE SEE COMMENTS WITH |
| | RESPECT TO SOME. |
| | PLEASE SEE TRANSFORMER DETAIL ON 6-1.0, THIS SCHEDULE |
| | IS BEING SHOWN FOR TYPICAL, HOWEVER IT DOES CORRELATE |
| | WITH SOME UNITS AS NOTED. SOME ARE SHOWN AS 75KVA WHICH |
| | ON TYPICAL SCHEDULE MENTIONS 225A OVER CURRENT |
| | PROTECTION ON THE SECONDARY SIDE, YET SOME TERMINATE IN |
| | 150A OCP ON THE SECONDARY SIDE. |
| | PLEASE GO THROUGH THESE: 3LC2, EXAMPLE.(NOT ALL) |
| | |
| | 85) NOTE: PLEASE SEE FBC 2004 CHAPTER 11 FOR |
| | REQUIREMENTS FOR ADA WITH RESPECT TO HORNS, AND |
| | STROBES. THE AUDIBLE LEVELS SHALL BE PER BOTH FBC |
| | CHAPTER 11 AND NFPA-72 AS NOTED, HOWEVER THE MORE |
| | STRINGENT SHALL APPLY. |
| | PLEASE SEE 11-4.28.1, 11-4.28.2 AND 11-4.28.3(4). |
| | PLEASE BE SURE THE LEVELS ARE INDICATED ON PLANS. |
| | PLEASE KNOW THE LIGHTING CANDELA LEVELS AS REQUIRED IN |
| | THE FBC ARE FAR GREATER THAN THAT OF NFPA-72. THE |
| | MINIMUM LEVELS FOR VISUAL SHALL BE 75 CANDELAS. PLEASE |
| | ADJUST AND PLACE REQUIREMENTS ON PLANS. PLEASE SEE ALL |
| | FA SHEETS WHICH ONLY INDICATE NFPA-72. |
| | |
| | |
| | 86) NOTE: PLEASE KNOW A RESPONSE LETTER/NOTES WERE |
| | PROVIDED, HOWEVER AS THIS REVIEW WAS MORE OF A REVIEW |
| | FOR CODE COMPLIANCE, A MORE DETAILED RESPONSE WOULD |
| | GREATLY HELP IN THE REVIEW PROCESS. THIS RESPONSE COULD |
| | INDICATE THE SHEETS/LOCATIONS OF CHANGES, CORRECTIONS |
| | OR ANY COMMENTS RELATED TO AND RESPECT TO THIS |
| | REVIEWERS NOTES. |
| | IF ANY OF THESE COMMENTS ARE NOT CLEAR IN ANY FASHION |
| | OR IF ANY ITEMS ARE NOT UNDERSTOOD IN ANY WAY?PLEASE |
| | DO NOT HESITATE IN CONTACTING THIS OFFICE. |
| | |
| | ** PLEASE KNOW AS THERE IS SOME INFORMATION NOT YET |
| | SUBMITTED PLEASE BE SURE TO GO OVER ALL. |
| | |
| | |
| | PLEASE SUBMIT THE ABOVE FOR REVIEW. ONCE AGAIN IF THERE |
| | ARE ANY QUESTIONS , PLEASE DO NOT HESITATE IN CONTATING |
| | THIS OFFICE. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |
| 2006-11-25 08:33:56 | REVIEW BACK IN PROGRESS 11/25/06 |
| 2006-11-22 07:38:23 | REVIEW IN PROGRESS |
| 2006-11-21 20:11:49 | REVIEW STOPPED, WILL CONTINUE ON 11/22 |
| 2006-11-21 18:54:07 | ELECTRICAL REVIEW HAS NOW RESUMED FROM 11/8 |
| 2006-11-08 19:53:56 | ELECTRICAL REVIEW STILL IN PROGRESS. |
| 2006-11-07 16:03:13 | NEW ELECTRICAL PLANS BROUGHT IN BY MR. JAMES MINDUR AT |
| | 1500HRS ON 11/6/06 |
| | ELECTRICAL REVIEW IN PROGRESS. |