Plan Review Notes
Plan Review Notes For Permit 06100125
Permit Number 06100125
Review Stop G
Sequence Number 3
Notes
Date Text
2007-08-10 09:05:28REVISION DENIED
 REFERENCE:
 ** FBC-2004 FUEL GAS.
 ** THE CITY OF WEST PALM BEACH GAS PERMIT APPLICATION
 REQUIREMENTS.
 ** FBC-2004 CHAPTER 1, THE CITY OF
 WEST PALM BEACH AMENDMENTS.
 ** FLORIDA ADMINISTRATIVE CODE.
 ** FLORIDA STATUTES.
  
 THE FOLLOWING CORRECTIONS/INFORMATION IS REQUIRED FOR
 GAS PLAN REVIEW TO MEET CODE COMPLIANCE:
  
 1. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2.
 NOTE: FROM ORIGINAL GAS PLAN REVIEW DATED 3/22/07 BY
 PLAN REVIEWER KEN STEVENS.
 "GAS PLANS NOT APPROVED AT THIS TIME. THE MANUFACTURER
 SPECIFICATION SHEETS SHOWING THE LISTING (NATIONALLY
 RECOGNIZED TESTING LABORATORY) AND THE LOAD (BTU'S) ARE
 REQUIRED AT THE TIME OF APPLICATION FOR THE GAS PERMIT.
 THE RISER DIAGRAM WILL THEN BE VERUFIED AND IF IT
 CORRELATES WITH THE MANUFACTURER SHEETS, THE GAS PERMIT
 WILL BE ISSUED."
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 PLUMBING PLANS EXAMINER
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL= [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved