| Plan Review Notes For Permit 06090892 |
| Permit Number |
06090892 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2006-10-13 11:22:03 | BUILDING REVIEW CHECKLIST; | | | 1- PROVIDE STRUCTURAL DETAIL WITH COMPLETE SPECS FOR | | | FOOTING USING #5 REBAR AS SPECIFIED ON DRAWING | | | SUBMITTED. WHY IS A FOOTER REQUIRED?.HOW IS FOOTER | | | FASTENED? SEC. 106.1.2 CITY AMENDMENTS TO FBC 2004. | | | | | | 2- DRAWING5 OF 13 OFSHUTTERS DRAWINGS HAVE WALL | | | MOUNT SECTION CIRCLED. IF THIS IS THE PROPOSED MOUNTING | | | CONDITIONS, THEN WHY IS A FOOTER REQUIRED?. PROVIDE | | | CLARIFICATION AND SPECIFIC MOUNTING CONDITIONS. SEC. | | | 106.1.2 CITY AMENDMENTS TO FBC 2004. | | | | | | 3- DRAWING 7 OF 13: INCORRECT ANCHOR SPACING WAS | | | MARKED.CALCULATED DESIGN PRESSURES ARE -33PSF (OR 35 | | | IF USING TABLE 1).SEE TABLE NOTE #2 AT BOTTOM OF PAGE | | | AND REVISE AS REQUIRED. | | | | | | JULIO GOMEZ | | | BUILDING PLANS EXAMINER | | | (561)805-6712 |
|