| 2006-09-28 00:00:00 | DENIED BY BUILDING |
| | |
| | 1) SPECIFY THE LEVEL OF ALTERATION FOR |
| | THE WORK AS SPECIFIED IN THE 2004 FBC |
| | EXISTING BUILDING CODE. |
| | |
| | 2) SPECIFY THE BUILDING HEIGHT AND |
| | NUMBER OF STORIES. |
| | |
| | 3) THE CONSTRUCTION TYPE SPECIFIED FOR |
| | THIS BUILDING IS INCORRECT. SEE 2004 FBC |
| | TABLE 503 FOR ALLOWABLE HEIGHTS AND |
| | AREAS. |
| | |
| | 4) ON SHEET LS.1, THE OCCUPANCY TYPE AND |
| | OCCUPANT LOAD ARE INCORRECT. SEE FBC 302 |
| | AND TABLE 1004.1.2. |
| | |
| | 5) SUBMIT A DEMOLITION PLAN OR FLOOR |
| | PLAN SHOWING THE EXISTING CONDITION OF |
| | THE SPACE PRIOR TO THE PROPOSED |
| | CONSTRUCTION. |
| | |
| | 6) ON SHEET LS.1 THE MAXIMUM DEAD END |
| | CORRIDOR IS INCORRECTLY SPECIFIED AS 5'. |
| | SEE FBC 1016.3 EXCEPTION (2) WHICH |
| | ALLOWS 50' MAX DEAD END CORRIDOR LENGTH |
| | IN FULLY SPRINKLERED BUSINESS |
| | OCCUPANCIES. |
| | |
| | 7) FBC TABLE 803.5 REQUIRES INTERIOR |
| | WALL AND CEILING FINISHES TO BE CLASS B |
| | IN VERTICAL EXITS AND EXIT PASSAGEWAYS. |
| | PLEASE REVISE ON SHEET A.1. |
| | |
| | 8) THE DOOR AT THE SHOWER ROOM CAN NOT |
| | SWING INTO THE REQUIRED FLOOR SPACE FOR |
| | THE LAVATORY. SEE FBC 11-4.23.2. |
| | |
| | 9) THE BREAKROOM CABINET ELEVATION ON |
| | LS.1 SPECIFIES THE 2001 FBC. PLEASE |
| | UPDATE TO 2004 FBC. |
| | |
| | 10) ON LS.1 THE BREAKROOM CABINET |
| | ELEVATION DOES NOT CORRESPOND TO THE |
| | FLOOR PLANS. PLEASE CORRECT. THE DOOR |
| | ALSO SWINGS INTO THE CLEAR FLOOR SPACE |
| | AT THE SINK. |
| | |
| | 11) FBC 11-4.24.4 LIMITS SINKS TO A |
| | MAXIMUM DEPTH OF 6-1/2 INCHES. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |
| | |